You can copy from here when filling out the rest of the page.
The application is for the placement of fill material related to the proposed replacement of two bridges on unnamed creeks , associated with the widening of State Highway (SH) 16 in Wagoner County.
The basic purpose of the proposed work (State Job Piece 24366(04)) is to replace and widen two structurally deficient Reinforced Concrete Box (RCB) bridges for public safety .
Crossing 2 is comprised of multiple emergent and forested wetlands and an unnamed tributary and is located in Sections 22 and 23 , Township 17 North, Range 18 East. Crossing 6 is located in Section 12, Township 16 North, Range 18 East. Both projects are south of Wagoner in Wagoner County, Oklahoma. The project sites can be found on the Wagoner East, Oklahoma 7.5 Minute USGS Quadrangle map at North Latitude 35.930787 and West Longitude 95.368515 for Crossing 2 and North Latitude 35.877741 and West Longitude 95 .357345 for Crossing 6.
ODOT reports SH 16 is a two-lane highway without any paved shoulders and a substandard vertical alignment. The highway has an average daily traffic of 3,120 vehicles per day with a projected traffic of 4 ,320 vehicles per day. It has a history ofaccidents due to the poor sight distance from the vertical geometry and lack of clear zone wherevehicles have no room to recover if they get off the pavement. Additional road projects associated with SH 16 are being evaluated under the Nationwide Permit forLinear Transportation Projects. The proposed roadway would be mostly on an offset alignment eastof the existing alignment to correct inadequate horizontal and vertical curves . SH 16 would be reconstructed with two 12-foot wide traveling lanes and 10-foot wide paved shoulders with 6 :1 (horizontal to vertical) side slopes and would be offset to the east to avoid the railroadright-of-way. The existing RCBs would be replaced with longer RCBs to create an 84-foot wide clearroadway to provide adequate area for recovery for vehicles going off the pavement. The vertical and horizontal alignments would be improved. Temporary detours would be placed in selected areas to keep the road open to traffic during construction .