Home

Galveston District

Run scraper

Port of Houston Authority Fire Boat Floating Dock

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to amend Department of the Army Permit SWG-2014-00106.

Full Public Notice Project Plans PROJECT DESCRIPTION: The applicant proposes to amend Department of the Army (DA) Permit SWG-2014-00106, a letter of permission issued 4 September 2014, for construction of a floating dock system including two sheetpile breakwaters totaling 255 linear feet, to allow the mooring of a Port of Houston fireboat. Subsequent modeling showed the breakwaters would be more effective if built farther from the dock, and the applicant now proposes to build a steel breakwater to the north and to the east of the authorized dock to protect the mooring of a fireboat from wakes of ships transiting the Bayport Ship Channel. The proposed breakwater would consist of an 85-foot-long full depth (-10 feet Mean Low Tide) section and a 104-foot-long partial depth (-3.2 feet Mean Low Tide) section. Two of the breakwater pilings would be protected from scour with a total of 150 cubic yards of 1-foot-diameter armor rocks on top of a bedding layer of 60 cubic yards of quarry spalls, resulting in a total of approximately 0.03 acres of fill in waters of the U.S. The area around the dock system is authorized to be dredged by DA Permit SWG-1998-01818, which is valid until 31 December 2020.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas