Harris County Water Control & Improvement District 96 Stream Stabilization and Straightening

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to construct a self-mitigating stream stabilization project.

Full Public Notice Project Plans Mitigation Plan The applicant proposes to construct a self-mitigating stream stabilization project along approximately 1,026 linear feet of stream (identified by Harris County as perennial stream 133 (P133)) by the replacement of riprap beneath clean fill to repair an eroding stream. Approximately 3,000 cubic yards will be placed within approximately 0.5 acre of channel before the designed stream channel is cut. The design will relocate and repair the top of bank by placing 18 inches of riprap in portions of the high bank requiring protection to a minimum of 1 foot below the designed stream bed. The riprap will then be covered by at least 6 inches of fill material on side slopes and up to 12 feet of clean fill material along the stream banks to create bankfull benches and a more stable stream bed. Planting, riffle and toe wood areas are included as stream enhancement features.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas