Home

Galveston District

Run scraper

ExxonMobil Oil Corporation Parking Lot for Beaumont Polyethylene Plant

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to discharge approximately 10,200 cubic yards of clean fill material and caliche rock.

Full Public Notice Project Plans Alternatives AnalysisMitigation Plan The applicant proposes to discharge approximately 10,200 cubic yards of clean fill material and caliche rock into a total of 4.2-acre of wetlands in 2 separate areas on the project site for the purpose of constructing laydown and staging areas, assembly pads, access roads and parking for construction personnel. This proposed fill will facilitate the expansion of the existing ExxonMobil Beaumont Polyethylene Plant.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas