The applicant proposes to construct a 25-foot-wide by 100-foot-long unloading dock, a 15-foot-wide by 30-foot-long covered boathouse, and install four 24-inch by 24-inch tie-up pilings in Cedar Bayou.
Full Public Notice Project Plans
The applicant proposes to construct a 25-foot-wide by 100-foot-long unloading dock, a 15-foot-wide by 30-foot-long covered boathouse, and install four 24-inch by 24-inch tie-up pilings in Cedar Bayou. The dock would be constructed by placing steel bulkheading, filling with approximately 1,200 cubic yards of earthen material, and placing a concrete slab on top. The dock would be used for unloading sand and gravel from barges to supply the adjacent concrete manufacturing facility.