PLACEMENT OF FILL FOR THE CONSTRUCTION OF A RESIDENTIAL SUBDIVISION THE SANCUARY AT JUBAN CROSSING IN LIVINGSTON PARISH
NAME OF APPLICANT: Eric Spearmen, The Sanctuary at Juban Crossing, c/o Coastal Environmental, Inc., Attn: Hunter Guidry, 1260 Main Street, Baton Rouge, Louisiana 70802.
LOCATION OF WORK: Approximately 1.4 miles north of I-12, Section 33, T6S-R3E, in Denham Springs, Louisiana, in Livingston Parish, within the Amite River Basin in hydrologic unit (HUC 08070202), as shown on the attached drawings.
CHARACTER OF WORK: The applicant has requested Department of the Army authorization to clear, grade, excavate, and deposit fill and concrete/road base to construct and maintain a residential subdivision (The Sanctuary at Juban Crossing) to include 135 lots, streets, house pads, utilities, a storm water detention pond, and drainage utilities. Approximately 2,900 cubic yards of fill material and concrete/road base will be hauled in and deposited to achieve required grade elevation requirements. Additionally, 6,292 cubic yards of native material will be excavated onsite for pond creation and re-deposited for road stabilization. The proposed project is situated on an approximately 34-acre tract that has been determined to include approximately 3.17 acres of forested wetlands. A preliminary analysis has determined that the proposed project would directly impact approximately 3.17 acres of jurisdictional forested wetlands during construction. The applicant has stated that the proposed action would have minimal impact on adjacent wetlands.
This notice was originally advertised on March 21, 2016. The applicant has made changes to the project increasing forested wetland impacts from 1.53 acres to 3.17 acres to accommodate a required storm water detention pond.
The applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. Any further reduction would limit usage of the property and, therefore function deeming the project impracticable. As compensation for unavoidable wetland impacts, the applicant proposes to mitigate in-kind wetland credits from a Corps approved mitigation bank located in the watershed.