The Great Alaskan Lumberjack Show's stated purpose is to stabilize the existing sheet pile wall, which is in poor condition and has had structural failures at several locations along its length. A failure of the sheet pile wall would endanger the public, property, and waterway. Another element of the proposed project is to allow for public access to the waterfront. Remove a portion of the existing, failing sheet pile wall along the east edge of Thomas Basin, and place clean shot and armor rock below the High Tide Line (HTL) in order to stabilize the lower portion of the sheet pile. Up to 445 feet of the sheet pile would be cut 4.5 feet above the finished grade of the proposed berm at low tide, when the area is dewatered. Prior to the removal of the upper portion of the sheet pile, the existing fill would be excavated to relieve pressure on the wall, with the sheet pile acting as erosion and sediment control. No fill would be allowed to enter the water. The placement of rock would start at +9-foot Mean Low Lower Water (MLLW) and would extend into Thomas Basin with a 1:1.5 ratio slope to reach the existing mudline. The maximum seaward extension of the rock at the bottom would be 35 feet. All work would be performed in accordance with the enclosed plan (sheets 1-6), dated July 7, 2016. Please contact Ms. Roberta Budnik at (907) 753-2785, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at roberta.k.budnik@usace.army.mil if further information is desired concerning this notice.

The Great Alaskan Lumberjack Show's stated purpose is to stabilize the existing sheet pile wall, which is in poor condition and has had structural failures at several locations along its length. A failure of the sheet pile wall would endanger the public, property, and waterway. Another element of the proposed project is to allow for public access to the waterfront. Remove a portion of the existing, failing sheet pile wall along the east edge of Thomas Basin, and place clean shot and armor rock below the High Tide Line (HTL) in order to stabilize the lower portion of the sheet pile. Up to 445 feet of the sheet pile would be cut 4.5 feet above the finished grade of the proposed berm at low tide, when the area is dewatered. Prior to the removal of the upper portion of the sheet pile, the existing fill would be excavated to relieve pressure on the wall, with the sheet pile acting as erosion and sediment control. No fill would be allowed to enter the water. The placement of rock would start at +9-foot Mean Low Lower Water (MLLW) and would extend into Thomas Basin with a 1:1.5 ratio slope to reach the existing mudline. The maximum seaward extension of the rock at the bottom would be 35 feet. All work would be performed in accordance with the enclosed plan (sheets 1-6), dated July 7, 2016. Please contact Ms. Roberta Budnik at (907) 753-2785, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at roberta.k.budnik@usace.army.mil if further information is desired concerning this notice. POA-1995-807-M5, Tongass Narrows_PN POA-1995-807-M5, Tongass Narrows_PN Drawings

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas