Omar Ortiz is the Regulatory point-of-contact for this permit application from Pacific Power to conduct work impacting 4.78 acres of wetlands and a roadside ditch in Central Point, Jackson County, Oregon.
PUBLIC NOTICE
Application for Permit
Issue Date: July 26, 2016
Expiration Date: August 24, 2016
US Army Corps of Engineers No: NWP-2015-436
30-Day Notice Oregon Department of State Lands No: APP0059031
Interested parties are hereby notified the U.S. Army Corps of Engineers, Portland District (Corps) has received an application for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plans. The Corps is soliciting comments on the proposed work.
Applicant: Pacific Power
Attention: John Aniello
825 NE Multnomah Boulevard, 1700 LCT
Portland, Oregon 97232
Email: John.Aniello@pacificorp.com
Telephone: (503) 813-6030
Location: The project site is located at the intersection of Sam’s Valley Hwy 234 and Tresham Lane, Central Point, Jackson County, Oregon. The site is in Section 5 of Township 36 South, Range 2 West.
Latitude and Longitude: 42.475275° North, 122.965122° West
Waterway: Three wetlands, covering 4.78 acres, and a roadside ditch were delineated at the project site. All three wetlands are freshwater, palustrine emergent with vegetation dominated by meadow foxtail. The wetland HGM classifications are depressional or depressional/slope and are fed by surface runoff and/or a high groundwater table. Wetlands A and C are relatively small (0.01 acres and 0.09 acres respectively) wetlands which are entirely contained within the project site, whereas Wetland B is larger (4.68 acres) and extends outside the project area.
Project Purpose: The applicant’s stated purpose is to construct, operate, and maintain a new 500 kV/230 kV substation to increase capacity and ensure reliability.
Project Description: Pacific Power is proposing to construct a new substation in Sam’s Valley. The proposed project would clear and grade the 20 acre site and discharge 31,209 cubic yards of fill material into 3.5 acres of wetlands to create a gravel pad to support the new infrastructure. The fill material would consist primarily of rock from a local commercial source. The site would be graded to direct stormwater into collection basins at which point it will be conveyed through a series of storm drains into retention basins constructed in the northwest and southwest corners of the site.
Mitigation: The applicant proposes to avoid and minimize impacts from the project by accessing the site via an access road constructed off of Tresham Lane which wraps around the western boundary of the substation and connects to an existing access road south of the proposed substation. Erosion control measures and stormwater management facilities would be installed prior to commencement of removal or fill activities to minimize sedimentation of wetlands, or portions of wetlands and increases in turbidity. Staging of equipment and materials will likely occur within the substation footprint and would not be located within jurisdictional wetland or water features.
The applicant has provided a proposed compensatory wetland mitigation plan to offset losses of waters of the U.S. that may result from the proposed project. The applicant has proposed to purchase 3.5 acre credits from the Rogue Valley Conservation and Mitigation Bank (Wildlands). The classification values of the wetlands proposed for filling are: Palustrine, Emergent, Seasonally Flooded Wetlands/Depression. The Corps will determine the type and amount of compensatory mitigation necessary to offset environmental losses from the proposed project.
Drawings: Seven (7) drawings are attached and labeled Corps No. NWP-2015-436. Copies of this public notice, which have been mailed or otherwise physically distributed, feature project drawings in black and white. The electronic version features those drawings in color, which we think more accurately illustrates the proposed project. To access the electronic version of this public notice, go to the Portland District website at http://www.nwp.usace.army.mil/ and select Regulatory Branch Permit Information. At the Regulatory page select Regulatory Public Notices.
Authority: The proposed project will be evaluated under the following:
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.
Clean Water Act Section 404(b)(1) Guidelines: The described discharge will be evaluated for compliance with guidelines promulgated by the U.S. Environmental Protection Agency under authority of Section 404(b)(1) of the Clean Water Act. The 404(b)(1) Guidelines are the substantive criteria used in evaluating discharges of dredged or fill material into waters of the United States. The source of the fill material would be purchased from a local commercial source.
Water Quality Certification: Section 401 of the Clean Water Act (33 U.S.C. 1341) requires applicants to obtain a water quality certification for proposed discharges into waters of the United States. A permit for the described work will not be issued until certification has been issued or is waived from the certifying state. Attached is the state's notice for a water quality certification.
Endangered Species: Section 7 of the Endangered Species Act (ESA) (16 U.S.C 1536) requires federal agencies to consult with the National Marine Fisheries Service (NMFS) and/or U.S. Fish and Wildlife Service (USFWS) on all actions that may affect a species listed (or proposed for listing) under the ESA as threatened or endangered or that may adversely modify designated critical habitat. The Corps’ preliminary review indicates the described activity will not affect any endangered species or designated critical habitat. Consultation under Section 7 of the ESA is not required for the described activity. The Corps will make a final determination on the need to consult after receipt of comments from this public notice including any comments provided by the NMFS and/or USFWS.
Essential Fish Habitat: Section 305(b)(2) of the Magnuson-Stevens Fishery Conservation and Management Act (MSA) as amended (16 U.S.C 1855), requires Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH). The Corps’ preliminary review indicates the described activity would not adversely affect EFH at the project location or in its vicinity. The Corps will make a final determination on the need to consult on EFH after receipt of comments from this public notice including any comments provided by the NMFS.
Historic Properties/Cultural Resources: Section 106 of the National Historic Preservation Act of 1966, as amended (16 U.S.C. 470), requires Federal agencies to consult with the appropriate State and/or Tribal Historic Preservation Officer to take into account the effects of actions they undertake or permit on historic properties listed in or eligible for listing in the National Register of Historic Places. The Corps’ preliminary review indicates to the best of our knowledge, the described activity is not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places. At this time the Corps is unaware of any cultural resource surveys of the project area.
This notice has been provided to the State Historic Preservation Office (SHPO), interested Native American Indian Tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps’ project manager identified at the end of this notice to assist in a complete evaluation of potential effects.
State and Local Authorizations: The applicant has obtained approval from Jackson County and has applied for a Removal/Fill permit with the Oregon Department of State Lands.
Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact, including cumulative impacts, of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of the proposed project. Comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing.
Submitting Comments: Interested parties are invited to provide comments on the proposed project. Comments may be submitted by conventional mail or email. All comments received will be considered in determining whether authorizing the work would be contrary to the public interest.
Either conventional mail or e-mail comments must include the Corps reference number as shown on page 1 and include the commenter’s name and address. In order to be accepted, e-mail comments must originate from the author’s e-mail account and must include on the subject line of the e-mail message the Corps reference number. All comments received will become part of the administrative record and are subject to public release under the Freedom of Information Act including any personally identifiable information such as names, phone numbers, and addresses.
Additional information about the proposed project may be obtained from the Corps Project Manager listed below. All comments, whether by conventional mail or email, must be received no later than the expiration date of this public notice to ensure consideration. Comments should be submitted to the following mailing address or email address:
U.S. Army Corps of Engineers
Omar Ortiz
Eugene Field Office
211 E. 7th Avenue, Suite 105
Eugene, Oregon 97401-2722
Email: Omar.M.Ortiz@usace.army.mil
Telephone: (541) 465-6878
PUBLIC NOTICE
Oregon Department of Environmental Quality (DEQ)
Water Quality 401 Certification
Notice Issued: July 26, 2016
Written Comments Due: August 24, 2016
Corps of Engineers No: NWP-2015-436
Oregon Department of State Lands No: APP0059031
WHO IS THE APPLICANT: Pacific Power
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers public notice.
WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the proposed project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for Federal permits or licenses to provide the Federal agency a water quality certification from the State of Oregon if the proposed activity may result in a discharge to waters of the state.
DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice on the proposed project.
WHERE TO FIND DOCUMENTS:
Documents and materials related to water quality issues as a result of the proposal are available for examination and copying at Oregon Department of Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region, 700 NE Multnomah Street, Suite 600, Portland, Oregon 97232. Other project materials are available by contacting the Corps per the attached public notice.
Scheduling an appointment will ensure that water quality documents are readily accessible during your visit. To schedule an appointment please call DEQ Water Quality at Northwest Region at (503) 229-5263.
Any questions on the water quality certification process may be addressed to the 401 Program Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People with hearing impairments may call the Oregon Telecommunications Relay Service at 1-800-735-2900.
PUBLIC PARTICIPATION:
Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that “The Corps provides public notice of and opportunity to comment on the applications, including the application for certification, provided that the department (DEQ), in its discretion, may provide additional opportunity for public comment, including public hearing.”
Written comments:Written comments on project elements related to water quality must be received at the Oregon Department of Environmental Quality by 5 p.m. on the date specified in the upper right section on page one of this notice. Written comments may be emailed, mailed or faxed as described below:
Email - 401publiccomments@deq.state.or.us
Mail - Oregon Department of Environmental Quality, Northwest Region
700 NE Multnomah Street, Suite 600
Portland, Oregon 97232
Attn: 401 Water Quality Certification Coordinator
Fax - (503) 229-6957
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public comment period. Following this review, certification of the proposal may be issued as proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you submit comments during the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at the above address.
ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at (503) 229-5317 or toll free within Oregon at 1-800-452-4011 to request an alternate format. People with a hearing impairment can receive help by calling the Oregon Telecommunications Relay Service at 1-800-735-2900.
llUSGS
SAMS VALLEY Q.UADRAttGLE
U.S. DEPARTMEtlT OF THE IHTERIOR
OREGQrl-JACKSO ll CO.
U.S. GEOLOGICAL SURVEY
.-,,,, . ~_.w
7.5·/llll UTESERIES
~II
/\
\
~-
"'
/-'--"
c ·""-''--~~ i
cw /
'
I '
Prod!.a <.flll!lf...:;U'll"r ~lrd
!!!f.:'1r:!~""'~-:-:.=.rii!u....~
nnr~lon:1. o ...,..~~ ..~Jt.
f'ltn .. lrd; . ...... _~
.,.....-.r~r;.~
..-"'"""
........ 'l!.n~~..,.bo"...
Cl>.':th~ri.b> ~·
"""'""J Ph"Y·trQ
~~7
-:.-- -~- __
~~..--
- .:
U?. - .
7lllr:.,~1J' :::
~-~..!..i~~
::=: ~
~~· ·,:n.:,~,.I:~-· -"'~~~. -~: t
NWP-2015-436
--MT-
t.
~
SCALE 1:24 000
to:.l~ --
Cz?'o0'70T/
~/~"l --
f·J!
"""'
.
Tl
............ 11!:>..to
ol<>l.Olbl.t
Qu bb
E
"r:~~~~iu~'1:m '
Clloll;ll..R f>TD<·lll>fUI
-i.t,.V~IUf! U..~TUl rJTUJ.I
"
SMtS VALLEY, OR
~
Page 1 of 7
Enclosure
~
~
0
fi
di
i
ij
u
~~~r ~
~ h~~~1j~~~ol !~~J
·3 ·
I
I
I
I
I
1
I
f
i
I
!I
!I
I
1 1
!I
I I
~~~~ !
I
I
I
I
I
1
8 ~~~~~~;i~B;~a
!I
I
I
i
I
i
I I
1 1
11
11
I I
1 1
I I
I"
1.11
1
I 1I
I 11
~
jl!lWI
IT
UhU~ s~U ~~ ~~~u ~ ~
0i;1!
!
i
I
i
I
i
I
I
I
II
i
i
I
"'
~ ---,,;;::d~"';---~~--~ 7"''::-__~-;;;,~=-,--
.......
lIAIO
~
I?
'
,,,t!.
,, fl:
I!!
d
i
~
i
I!:
)' I,
NOllVlSSns A311VA Sl'IVS
NVld 311S 11V!13110
NVld DN!OV!ID
NOD3ll0 'llNrlO~ NOSll3Vr
I
"'1
l!!i
~
B
~
:.:1.
Enclosure
Page 2 of 7
NWP-2015-436
""°""""
'
.
.
~
.
"
N
-
cmmo
<
,.,,..,.
<
"""""'
I
.
.
SlI
..
31'1<1 'Off
0
0
.
=~~
~
~~~
L- _/
.c-,t9
dia'Jii°llvci t>- ~
!-;,
L,,
,_
"
/
"--
i
~\
c-~
I
""
\:,:::
r(
,,...,....
""~
I
lO
e-A<'·
'W
~
ISlllll
"
s::w::rw-o
'tez1..ezi
ISJ;Jl
Tv:m11::i313
-~'
!
I
j
i
~
i
!
't:IO
..
'll'r)S
""'
UK
L .IO L
~
~
I
100·9r1>sn
~
~
~
~
I!: : ~
-------=
)> ,, ~
m
g
tl
~
~
"~ . I!!
d
~
~
~§
1!!:
~
§
~ ·.;,fl.
· i
r~
~ ' El: ~
~
M3!A l33H1S
SN011VAJ13 'f SNVld
'A!Nno:> NOS~Vr
N011v1sans AJTIVA snvs
N~300
fil.
.' i~
'
~
~
'
I-
.
~
.
.
·i
I
"l
~
i
~
l
~;
t
I
·
t
i
.-1!
i
t
f
I
~
~
-==
-=
NI
~
-=
I
~i
"
-==
-==
-=
tr
.
D
;/......_
~
~
......_
~
""""-
.e-,au
.
Enclosure
Page 3 of 7
NWP-2015-436
REVEGETATION NOTES
RECOMME>mm SEEDINO UDCTURES MUST ac Ootu: OH A snt SPECIFIC BASIS YltiICH ACCOONTS FOR THE
FOJ.O\llINC; SOIL PROPOlTl.tS, CLIMATIC FACTORS, TOPOCRAPHIC P0Sm0N ANO f'Ll.SlBIUTI'.
2.
\'£CtTAT1Vt PU.WTINO SHAU. 8E DONE v.t1ER£ O!EUEO NEC:ES.SARY TO HASTOf lH£ RETURN Of'
PR£-£XIST1NC SITE CHAAAClDUSTICS. MIO ON IMY FINISHED SLOPE MUCH WD.l. RDU.IN UNDISTUROED FOR
1
ALL DlSTl.IR8m OPDI SPACC AREAS. AND a.rT AMD FllJ.. AREAS. SHAU. R£CElVt AN ACaPTA81.£ SECO MIX.
SEED MIX SHALL BE APf>1lED AT A RATt SO TMAT CERW!NATIOM AND SUBSEQUENT COVEJtAC( REACHES l!O
P£Ra;NT IN A llD'RESDITATIVC 10" x 10' AAE:A. lf COVCRACE DOES NDT ltCAQI 110 PERCOIT, RES££DINC
1,
COHTROU.INC SEDMHT MIC$tATlc>l DURINC STORM E'o'ENTS AND PRE\'DITINC AND/OR COAAECTINC
PR081.£US ASSOCIATED WITH DtOSIOt.I WHll.E RUNOFF' lS OCCUAAINC {\l*'IIDl CAN OCCUit &OTH OURD~;~~~g:~:a:~~~~I~~
SHAU.
AT ILAST 10 'l'EAAS.
J"';;;reu..;miuo~~vJ
I
.. --
~
EROSION CONTROL NOTES
1.
Of EROSION CONTROL DE.VICCS
2.
BE scteUl.£D.
TllE CO!rnV.CTOR SHAU... COl.IPlY WITH JACKSON ctlOMTY, TllE STAT! OF Olt(CON ANO OTHER 00\'tRNINC
ACOICII:S f'OR TEMf'ORARY EROSION CONTROL MEASURES.
MUST 000.JR.
5.
I
··!
i
~
APPROPflIATC FERTILIZER SHAU. BC APPt.lED TO All. SLOPES RECEIVING SUD. APPUCATION RATCS rF nlE
FERTll.I2ER SHAU. 8£ STIUCTLY ADHERm TO.
IALL PltoctED IN SIJQI A MANNER SO THAT flNlSHINC Of
1CCOl.IPL1SHED A$ SOON AS POSSUIU: AFTER ROUCH
IE SCAAifIED WITH MEAVY EQLJlPMCMT, lEA.VlNC TRACKS
..U. OJT St0PCS IN son. SHAU.. BE ROUNDED fat A
THt CATot P'OM, SlClP!::: IWUNDtNO S1iALL OCCUit A$
THE Sl.OPC lS BEJ)IC 8RotJQ(T 00\lotl. THC O'.OALL SHAPE, HOCHT ANO CRAOC OF Nit a.rr Nm/M
rJU SUlPE SHA.LL Bl:: OCVEl.OPCD IN CONCERT wtTH TME EXl!mNC NATtJRAL CCNTOURS. SC#J.C ANO
~OCTATION
OF NATIJRAL TERl'tAIN.
NOT et Ul.IITED TO TEMPORARY SEEDlNC, f>ERMN.IENT
ITION, '4'.0CTATIVE SUFfl'.R STRlP'S, fl'Rl'.SlRllATION Of
LIEASU~ USE Of WPIJtvIWS SURFACCS FOR
........,,.,.
5.1, \I/HER£ THE INITIATION Of STAEID.lZATION MEASUAtS 9Y THE 15TM DAY AFTLR CONSTRUCTION ACllVITY
PERMANENT\.Y CEAStS lS PREQ..UOED BY DEEP SNDW OR f'ROZEH CADUND CONDffiONS. STABlllZATION
MEASURES SHALL SE lNlTIATtll AS SOON AS PIU.CTICASL.E.
SILT FD1CE: F>.8RIC PER
SPECIFICATIOlll 022.75
I
UWKERt CONSTRUCTION ACTJVrTY ON A PORTION Of THE SITE IS TEMPOR.ARn...Y C£ASED. AND EAATli
DIS11JROINO WlU. RESOW£ 'MJTH1N 1~ WORklNO DA'YS. TDIPOR.ARY STA81UZATION MEASURES NEID NOT 8£
lNillATED 00 TMAT PORTION Of THE SITE.
11.
!i.l'£ClTICAU.Y DUTUNED DlSTUJt!EO >.ROS, 90Tli ON ANO OFF-~ SHAU. BC REVECCTAT'EO. 111ES£
AREAS SHALL JNCWOE. BUT NOT BE UMITED TO ALL UNSURFAtm AREAS WITHIN lli[ FL.ACCED Lii.ill$
Of DISTURBANCE. STAC]).IC ANO STORACE AAEA.$, MATERIAi.. WASTt AA£AS. UNDERCROiJND UTIUTY
CONS"mUCTtON AAO.S, BDIQC AREAS.. J.HO TtMPORARY OR OOSTINO ACCESS ROADS USED FOR
CONSTRUCTION ACTIVITIES. arr AND flt..L SLOPES 0\0 J:t REOUlRC THE Pl..Aa:w&rl' ~ EROSlctl
C~ATION MATTING. SI.OPES LC$S TKAN .3:1 MAY BC SPRA'fttl \frlITH TAOCIFlER.
7.
smlMDIT TRAPS l.l1JST oun£T OH"TO STAB.lUZED {PREJ'tRABl.Y UNDtsT\JRBED) ClroUNO, OR WT TO
P£RCOLATE IHTO THE caoJND.
a.
CONTRou.EO CL1TlETS SHALL DIRECT ca...t.rCTID RUNOFF THROUGH sn.T FDICES OR STRAW BAL.£S.
·Tl!E WASHOUT PIT SltAU. BE UHED WilM AH APPROVCD
L£AJ<-PROOF LINER TO PFlt\'ENT CONTAMINATED WASHOUT
FUJlD FROM INfn.TRATlNC INTO THE CAOOHO. UHER S>W.l. BE
00tN0£D TO THC TOP rF THE WASHOUT Pn TOP,
lSllM£Illl<:..l
=
1, A \USHOUT PfT SW.t..l BC CONSTRl.ICTm RIA COMCRCTE TRUCK WASHINSD;" CONSTRUCTION
.":! , EXCESS W..s>IOUT ruJIO ANO CONCRETE W.TCRIALS IN THC PIT SHAU. BC REMOVED RCOULAALY TO A\OID
O\/ERA.OW. O!SPO!AAI. W.ltRW.S SHAU. BE l'WJU:O TO AN .APPRO'.-tD DISPO~ LOCATION OFfSITt.
.... AFTER COMf'l.£TION
lHE PROJ(CT, WASHOUT PIT lNa..UOINC A.LL EXCESS WA.SKOUT, MID CC»ICRETE SHA1..L
BE DISPOSED Of AT AH APPACMD DISPOS.-i.. LOCAnON OFFSrTE.
OllltATIONS. Oft CM.MINO N'TICIPATtD WlMOY 'frO.Tttfft
CONCRffi TRUCK WA$1i0UI
pl!
~I
SPECIFlCATIOHS FOR ADDmONAL REOUmn.DITS.
RETENTION POND NOTES (FOR TOPSOIL ANO COMPOST):
or
OPEHINF~~U.m£~~ ~~l~~~l~
~
JA0CS0N NtO THE STATC OF OREGON REQUIR(MOITS.
2. WA.SHIHC OUT Of CONC:R£Tt TRVCKS NID RINSING Of lliE CONCUl'E lRUCK CHUTES SHALL BE STRICtl..Y
MOMlTOAttl TO AVOID THE CONTAMIWJlON Of ~ WATtRW'A"!'S ·
""'"'-"""'
CALVANIZD:I S'tm. WIRE UESH (1'4 CACE WIN., tr..6"
a
~~lN~=A~~~ttt~J~~TER~~~~T~~~~OF
II.
QETAD.
il'
Co~
TIC mesoa.,SHAU. MOTCONTAI( ~»IC%$ Dt'!ltlMOITAL TO lliC CIU>Wnt rll"lA>nS Nal ~ m: nta: OT
~ \fraD CONlRtll. 80AA0 A$ a.ASS "A" (lit a.Ass: T
MlJ)S.
UNSUITABLC 'ltP.XL OR TCP""..O... P\.ACQ) 8Y 1HC CONTAACTOR 'llllMotlT APPROVM. IN ~A"IDI FloCll.Jl'G. WAY 8E
ll(DUIRED TI> aE lt£Pt.AaI> AT NO Al>Ol"JlONAL OOST TO nu: COl.IPN«.
PUNTS OCSK>L4tm 8Y 1HC WA.21NO'TCIN S"TAlL
ul
u: I
Ci'
~!
THt TCPSal W.'IERIAL SKALL. BC ANY Ill.DID OF LQ,IJ,IY SOIL. SAND, Nal CXl.IPOST lMAT IS ~40X COMPC:r;T (BY
\'Ot.Ul.IE) AND l.IErlS THt O'IHD: CRllEAIA AS SP£QflD) OEl..OW;
· A ~ AHl!L.'l"'.JS OF lKE llUHDm WA11JllM... INCUJDINO COl.l1'fJOT\1fr.270A~tH21/Cl1.0..
·~=...~~'lt£~~~~~~~~:°.i:"J14E~~~f100.~
~T~~~ltA~~~~~~~10~=~~n:r100Fo:
ll1HlMUl.l12..0\iUtl.AP
·
"' SEAM<
·
·
·
PIECI:$, Pl.>SllC. AND OTHER FOftfJ~ W.Tl!Jt. Nll> SHALL HA'-"t: IW -..slm...t f'R[[ WATER.
TtlCPtt CT lHI'.: llt..Dmc> W.ll'.:ll:W.SHJ..LL.11( 1ESTm ANO m'. llCTVl'aN & AND fl.
TtlC "TOP"..OIL MATDllAL Ol.Al.J.. DC Pl'tOttCttD mow .w. !:OUR~ OT CONTAMllUillC)N, IMCUIOIHO wcm s:a:n:;, \IHLC
AT THt !1.ll'f'UDt. IN COH'd'.YAHC(. /11«<1 AT THt l'RO..Cl:T SllE.
THt MATCltW. ~ llC PlACm IN lLIO!:£ Lin$,, MOT TI> OCtaD 11 OICMCS tADi ANO ~ lFT SHALL BE
COWf'ACll'.J) WTH A WAlDl.-Flll'.D lAHDXAPE RaJ.Dt, TKC lrU.lDllAL SliAU.. ltOT OtHEAVS( 8E WECtlAl«:ALlY
"""'""'"
· 'llCAlHDt P£JtWITTlHO ANO AS N'PAOVED, Pl..ANlS SHAU. Bt ltCTAl.Ull AS $)CN AS POSS3..t "1ltlt PLJ.QNO N(J
CRAOO
~~~~ AR!A. UH0CR NO CIRCUM=:TN~
tilll[S.
t.
~ANDPltOYIDCOS1'A~Ol'lH(U!;.CCWl'OS1INC~lS£>.l.OTltSTINOI
PfWCRAW (SEJ: WWW..CCID"OS11NCCWNCll...Of!O FOR A UST OF LOCAi. PROlllOCRS). THC MATCRW.
Ctll.IJ"O!Ol[D, '111~ OF 'AAEll..£ wall S££O$, AND STAlll.C 'MlH RCCARD TO orrt:OI COHWWPTION AHO
OCNDV.TION. TH( COMPOST SHAU. l'tli\IE NO w:ISU: FJltt WAID!: ANO PllOOUct NO OUST 1tiEN
t.l(£T 1'HC l"OC..L.O'MNO ClttlVllA:
· IOOS Of' THC l.IAlEIUL Wl.IST PASS tHAOOCH A 1/2-~ sata:N.
FDIC( ALONC TH£ CONTOUR >S MUCH AS POSSIBLE. MlERE EXCESSIVE RUNOFF WIU.. ACX:UMULATE AT A LOW
POINT, PROIJIDE AN OPDIJMC IN THE FDICE AND DISTAU. A SED?MDIT TAAP.
Dl8ED BQ'TT[l,I OF SllT fDIC[: FABRIC rs- ~TICAL.LY ea.ow FINISHED CRADC. COU?ACT AU. AJtt.AS yt.0£
TliEFASRJCISEMM;DOC),
3. Tot:r F'lR. PM OR STtEL f'LHC( POST!:.
4, STITOICD LOOPS TO at IHSTAl.llD LPtUU. smc OF SLOP[.
~ DO NOT PLACE sn.T FENet ACStt>SS P<>T9mAL CONCOITRATID nows {PIPC OUTIETS. DRAlNAC£ CHANNtl.S,
CUT DITCHES).
fl, SEDIMOI
z.
snt
TO
ROO
"""
"'-
7. SEDD.IENT F'ROM Tl1C $TORM E.VDJT AMO 1ltt FtNCE 1RD10t SPOn. OH n£ UPHILL SID£ OF ll£ ~CE 5HAl...L
BE ~ FROM TME SITE OR STORtD JN THE STOOCl" 1HE TilPSOll WU. WOT DC AIJ..O'JICD ~ lHE CAOw.ID 1$ ntOZDI OA SA'MU.ltll OR ~ THE
llCAlHER ts TOO 'lllE"T ASllClDtMINCD llYTIC COMPNIYS RD'tt£SOITAU't.
Cl:llElSI SHAU. BC OCRIC ntOU Pl.ANT W.1Dl:l>L UNOCR COHOmOHS DCSICtC TO Pl
l'l.J.a)I0(1'
· M
INSTAU. SD...T FDla: Al.ONC CONTOURS. TO A'w'OlO CRU.llNC LOW POIHTS Al.OHO ll1E SlLT FCNCE. ALlCN ll1E
AS AN ALTOtm~ A STRAW WATTL£ SHAU BE USED IN PLACE OF A SILT !"ENC( \tt\OI WINDY \1£41MER
ANTICIPATED OR WttD1 THE 8MP. ME TO REMAIN It6TALL.£0 FOR LOHC POUOOS OF 111£.
ts
usm ms 2fTT FJ nws
SD I EfNCE Df!AD
.-
lSllM£Illl<:..l
""""
1, l.IINJMUM 11· OVERl..AP rs AU. SCAMS RC0UtRm.
2.. COVERING WADCTAIHm TIQ4Tl.Y lW Pl.ACE av Us:INC SANl>llAC$ OR TlRtS ON ROPCS WJlM A l.IAXIMUW 10·
GRID SPACING IN ALL DIRECTIOMS.
3. BARRIERS AT TllE TOC Of STOCkJ'Il.£ SHAU. 8( CONSTRUCTED wrlli SEDIMDIT FDICES. MULCH BERMS.
CLIPPINCS. STRAW WATT1.£S, OR OTHER APPR0\'£0 BLlP W.TtRIALS.
4. PLASTIC SHEDINO IS usm TO PROVIDE lMME:OlATt PROTECTION TO St.OPES AND STOCICPtt..Es.
5. 00 NOT VSE PUSTIC CO'.{RD(C UPSLOPE OF AR£AS SUCH AS STEEP AND/OR UNSTAEIL! SUftS THAT
WJQIT 9E AD'ltRSaY N'fECTED BY CONCENTRATED RUNOFT.
8. ~ ME:ctssARY. :INSTAU. AH tHltRCEJ>TOR OM. CAA'oa OR IUPllAP BERM. OR OnlER SJI'TA8lt
PROT"tCTIOtl D(VlSE LPffD...l Of TH£ STOCKPll.E TO DIVERT fl..OWS ARCUNO THE STQQCJ"D.E OR TO
DISSIPATt RUNOFF \otl.OCITY.
7. TOE-IN THE TOP Of lliE SHCETINC IN Ag·~· TRtNCH 9ACKfll.1.£D WITH COt.IPACTm NATIVE UATEJUAI..
S. ANQIOR TllE PlASTIC USD.I" SCAMS t' TO 2.', TAPE. ROLL. AND STAXE THE SEAMS ANO TliOI lK:JQl DOWN Tlit DITIRC lDIOTH..
18. REPU.CE TORN SHEUS ANO AD'AIR OPDI SO.US. 'RtOI THE P\.ASTIC SHEET BCCIHS lO DCTUUORATE.
SHALL. 8C R£MO'l{l) AND REPLACED etlWPtLTD.Y.
SJOCKpD E OB SpRQV1RGf SHEFIJNG QETAD
n
·
·
lHCl'ttOFlHCIUilDWil.DiALLllCllCTlllCDl&»IOO.
WANUfAC'l\lllll) INERT W.lOtlAL. (l't.ASflt. C0NtR£T£. CCAAl.llCS. WCTAl. ETC.) SHAU.. llC I.CS THAN I.OX BY"
~N
WJCHT,
· lMCORGAHICtu.TIDtCOHlDITSHAU..8Cl!Ctli1Dl30.A.N07°"(Dll'YllDOiTBA!:I:).
· ~ ~T COH:TtNT ~AU. Bf: LZSS THN< 11.0 MWHO:O/CW.
· WATIJAJTY' IHOICAT'Oll SHAU.. BC CRCA"!tR TliAN llllX FOft COIMIHAllON ANO ,_,CM.
·STA911JTY::.HAU..8C'!oTABLC"TO"VCAY!:TA81..C".
;::8 ~
· CNUIC»i'/NllltOCOf (C/N) R>.TIO!OHALL llCU:S:: lHAH 1511,
·SHAl..LPASS"IMClRACClolETJ.J.ST1;$T.
SU!IWITlHEraJ.O'llllNCATILAST1+'flClllKINCDA'l'SINAIN"1KZOT~
· DCICllMtHTAllON f'OA tHt: TWO AHAl.'15£$ (P'.umcu'. CltADA"llCH W1H CM.CULA"ltll
coc:maon
OF ~ AND
f'tol)SHALLllCP'CRFORMC>9'1'N4ACtREtl(ltl)U80flATtlRY'ollllHQ/RflDIT~TION.l>ICDAlLOF
"l>IE
'-NAL~ SIWJ.. BE NO WOR£ lHAH 00 CM.D«>AA DA'l'S PRIOR m THC DA"lt OF lH£ suawrTTAI. tH:r:: RD>ORT 2'1AU.
INCWOE THC rtt.LOWNC INFOAWA.1lON:
o tu.WC Nal ADDRC>S Of" TH£ LABORATORY.
o l'ltoN:ECONTACTAND£-t.tAJl..ADORCSrOAl'HCLABORATMY.
o TEST DATA. INCUIOIHC THC DAlt'. AHO KAMC OI' THC 1t:ST P'ftOCCDOllC.
o A COWl"OST t£OtNICAL OATA SXEE'T FROM~ CCWPOST 'oOIOOlt.111E NU.L"YsiS AND m-oflT IAIST COHfllflM TI>
~~~~~US~~~OFINl=.::.:f~JA~
eucxas or
l..AOORAltlRYANO BEWO 1.10R£lHAN 00 CAl.DIOAA OA'ISPIUOR TO lHC DATE OF "IMCSUIUTTAl.
0 TWO 5-<:AW),I
THf fll.f);OO) WATCRIAL. AND A IJ!!;CRIP'llON Cl' Tl< LDCA'llOH, CQIJIPWOO. ANO
METHOD l'ROPOSED TO t.IJX lHC l.IATOW.L.
~
"I
fU
1
UO.'!DUV--_\ _
Ao
I
,,.._~\...Id-"'+*~-.,.-
2
... 1~\,0G\IJMM.IM SA\llD ft{l"l&M) ~· :t· IV l'UlrnD ft(~ lllOC)l/IS, . _ 2:2& IV
NWP-2015-436
Page 4 of 7
5z ~
f-
Enclosure
~~s~ N
~~n.'5 ~
,,~§~g ~
U"J:zoe: ~
'!05!35 -
iB
~~ "' L
VIV)
U'J-,
......
~~
~
.r DEEP
MIN.. RlPAAP
PCR SPEC. SECTION 82274
lli1ifiLi'ifj;
2. 00'8EJtl,I
tf ll£ cotlSTRUCTia.l DmUHCC
8L.OCK$ THE f\.OW OF AN OCISTINC
OITOi INSTALL A lDCPOIWtY 1r RtP
OJLvan UMOER TiiE ENTRANCE ROOC: lH
LINE WITH THE DITCH. THE QJLIJERT
SHAL.l. t.AAT01 TiiE DIT01 INV£RTS ANO
SU)I'£.
·AS
too' MIN.
R£OOlREJ) -
EXCCPT WAY BE ll£DUCCD TO ~·
"lN..fORSlltSWITHl.ESSTHAN
ONE ACRE Of' OCPOSU> SOIL
FtNC<
I
Al~
~
I
"o'
,.--tr au
SP..U.S FREE
""'"""""-
1-1
O!'AU.FlNES
"
" ' tT
SUPPUD!.
AND
SHAU. 8£ ' I
COHTACT Wrlli THE son..
.APl"RCMJIEQUIV"1.DIT. TO __ ___ _ ____ __ ____ __
___ __ __ _ ____ _
£STA8USHED DOE TO THE CLIMATE c:a""""
~ti~ ~~~OB~~=~~~S>COUPACTED STRUCTURAL 8AOCFlU. RC-1 ,
RC-2 OR ACCREGATE BAS! COi.iRS£
SJOE
$1
OPE
1. INSTALL 'M>YEM C(OTOCTil..E FABRIC TO PRE\£KT SU&-SOll. PUMPINC.
2.. A VEMICU: WASHOO~ AlltA, lF R(QUIRfD, SKAU.. BC INSTALUD ANO USED TO RD.IOVE SEDIMENT FROM
~a.ES 8EFOA£ tLAVJNC THC ~CTION SITE. THC WASH DOl'IN AREA SHALL BE MADE Of' TllE SAME
QUAAAY SPAUS AS A Cl»ISTRUCTlON ~ct.
l. TME LOCAL C0'.1'.:RNIHC A00¥;Y W.Y RDlOlRE .4DOffiONAI. OR Al..lt:RHATt CONSTRVCTIOM DfrRAHCE OCTAD..S.
pROifCTION OE!AD
s.
I
or sons
ToP ORCSSDIC ANO RCPAJR.
0. IF THC Pl.ANS SPECJN A. l'CRMANOIT OJLVCRT. CONTRACTOR S11AU. CONSTRUCT A. PERMANl:NT Ct.IL'JCRT
INST£AD OF Tl!£ TCMPOAARY CIJL\/ERT.
~
"~a
filAAD TZED CQNSIBUCTION ENTRANCE QfTAD
!I
RE-ESTABLISH ...UETATION ON DITCH BOTTOM
AM> SIDES UNTll.. OEDICO "'sUBSTANTIAU..Y
~I
!!; I
C0MPL£Tr BY THE PROJECT fliCINEDt IF
Ca.lSTRUCTION OF THE on01 IS DUIUNO
MOl.NKCTS
ON OJT01 BOTTOM A.NCI SlOES PER THE
W.TTINC CHAMND.. IMSTALLATION OCTA.II...
QIICH SECTION
WITH
ul
prrp.t ceosr;-srcnoN Qf!AD
RJPRAP
"''
if!
SCALE:N.T.S.
DISTANCE APART 'M1ERE
POINTS "A" ANO "El" ARE
THE SAii( W:VATtON
----'i~~~~~~;;.,;;;;m;,,,,""==.iQ.L'no_,..
WATTl.t SPAC!HC TIJIU:
SUlP£
lwAXIMl.IY
SPACIHCI
;o:=o:-
~
39'-o·
llIIl>LWW'.
~
""""
PU.NT MArotlAL SUCH AS COCOHUT EXCQ.STOR.
~ BIOOECRA0"8t..E Off PHOTO OECRADA81.£ NCTTINC.
um£SS OTHERWtSE SPECinl'D. DICASINC MATDUAL
D CONCRETE OR OlliER COMTAUINATINC W..TERIALS
FREE f'ROW CUT'S, TEARS OR 'llEAk PLACES AND
~POST Fnil'.R SliAl..L MlrT THE UATERIAL
occ.-.v..,:rm ALONG SLOPE COt.ITOtJRS. BECl>I WATTt.£ INSTALUTION AT
THE BOTTOM Of THE SLOP£ AHO WORK VP. CONSTRUCT 1RDIO'its AT COHTOUR INTERVALS OF 2S' ANO JOO'
APART DEPENDING ON STEIJIN[SS Of SI.OPE. THE STEEP£R TME SLOP£, THE: Cl.OSER ToctTHER THE TR£NOa::s
(SEE WATTLE SPAClHC TA!LE). JT IS CRIDCAL TMAT THE WATil£S ARE IIGTAU.ED P£Rf'OltlJCULAR TO WATER
2. PLACE WAmLS IN SHAU.OW TRENCHES
MO't'DIENT ANO PARAU.Il. TO THE
SI.OP(
CONTOIJR.
3. W.\TTl.ES 9tAll. BE lNSPECTED RtClA.ARLY ANO AFTER u.oi RAJNFAU.. TO ENSURE lltAT 1lfEY lTHOROUCMLY OITREMOim, OOACT '4l1"TH THE SOll. AND FUMCTlOHIHC PROP£RlY. OJ.MACED WATTUS SHAU. at
mICAL STRAW WAID E INSTAI I AITON QEIAII
""
~AIREJ) OA REPt.AaD TO WOR!QNC ORO£R.. ALSO JHSPCCT THE g_op[S AFTER £ACK Sl:CNIFlCANT STORM
1:'1D1T F"OR EROSION, AND ANY RILLS OR CUW£S SHALL 8t RtPLACEO ANO RCPAUlto lMUEDL\TU.Y.
s.
THE TRENCH SPon. 91All.. BE STORED DI THE STOCICPII.£ OR HAULED TO AN AJ>PROllll> LOCATION ommt.
IS. LAY T>IE W.\Til.£ wmtD4 THE TRENot >.ND m IT TIGHTLY .l.OAlHST THE son. TO tuMIH.\TE CAPS BE1'1'1EEN
TH£ son. "1<10 TH£ WA mt.
7. US! .\ STRAlCHT BAA TO DRIVE MOILS THROUGH TMt WATIU: AHO INTO Tlit SOU.. OR:l\'C THt STAIC£ THROUGH
THt PREJ>AAED HOLE MO TWE GROUND. ILA\-£ ONLY 1 lNCH TO 2. IHCHCS Of' STNCE OCPOSCD "80\'E THE
ROU.. INSTALL ST/JCCS AT lCAST C\'OtY I ON Tt£ l>OYIWSt.OPE SID£ Of' THE TRfNCHES OM HICH..Y £ROSIVE OR ~ STEEP SUlPES.
a, SEDIWOO" stWJ. BE RDIQYED f'ROW lH£ w.un.£ t.f'CIWllOl1' SOC Wtm. IT KAS RU01ED ONE 1HIRD Tl1£
£XPOS(l) HEJctfT Of ll1E WATIU'.. SEDIWEN'T SHAL.l. M: ST0R£D IN lME STOO::PllL
9. R~ OR R:EPLANT 'vt.CitTATION IF Ntc:ESSARY UMTL THE SlOPE IS STABIUZED.
10. Af1ER TiiC stJR!tOUNDlNC AR(A$ HAVE BE£N stABIUZED ANO TiiC PR0.1£.CT IS APPRO"lll BY PACIFICORP. THE
WAm.ES AHO ST>J; I "'
l~''p~n_~~D~~v._
ENIBfNQiMEtff QITAII
~
2
3
NOTE· WJ.IDFS 2u.11 RE TNfilrUlfD PER
nan
QN
15"' ~
SHITT?
~~
WAID E OR COMPOST SJOCK Qif(;K QAM QOAil.
I-
~:zo~ ll)
~5;:!;g ~
<>Si!
~5!315 -
""""
1. CHt()( DAMS ARE CONS1RUCTll> .t.CROSS THE DITCH TO RmUCE 'JE1.0CITI£S OF
CONCENTRATE!> FLOWS. TiiEREBY REDUClNC EROSION ANO AU.OWINC A SIGNIFlCANl
AMOUNT OF SIJSPENOD> SEDD.IENT TO SETTlE OUT BEHIND Ttt£ CHEO( DAM.
2.. CHECK DAMS SMA.LL BE: USED lN OJTCliES THAT ARE NOT YET vt:GETAttO.
3, SPAN EHTlRE DITCH wmTM AHO OISURE Tl1E CENTER OF Tl!E OAM IS a· LO'«R THAN
THE OUTIR ENOS.
4. INSP!CT 01ECK DAMS OMCC PER WEEK AHt> wma>l 2.4 MOORS FOL.t.OWJ>.IO A RAIN
EVENT lJHTIL COHSTRIJCTlON IS COUPL.ETE. REMOllC SOIIMEMT BElilNO EA04 WATTl..E
'MIDI n A£>.Oi£S ONE-THIR{) THE DEPTH <:F lllE WAmL ll1E CHE()( DAWS SHAU.
REMAIN JN Pl.ACE UNTll. VE:CETATIOH IS E:S'U.91.mtto INSIDE THE OITCt£1).
4
5
re
~~ §
fil!RfACE BOUGHfNING QETAD
Cf)~
Page 5 of 7
ffi
L
~
7
nu:;l«.O.TDt.l\2-MON\-lo ........~~~\~YlloJ-.,,1~\,0C:\IJM:.U.~\QllT:{'lUll)~(.'tll:t·Nl'UlflDI l'f:(IUITlNC, IUCIC)2/1:i,'31t :t~N
NWP-2015-436
t')
~~o..c5 g
SCAI.£!"' '"'
l
t§
~Cl
~
Enclosure
~~
~
I
Al!!
~
I
I
ii"
··~~
!l
~I
AtfQt!!Ft
T!!Dtnl
ul
u::
I
Ci ,
srrncw
""'
~
if!
ON
TROL
'
'""
SHTHQ E se IC£ SfCTIOH
SHTNQ
r
sps
xrx srcn°"'
aNome
mf!!Oi
srcnoo
g
MAilJNG S1 gpE INSJA! I AilQN QEIAD
""""
1.
MORE
1lW' THE MDaMLM OF OHL f"ASTOER PER SQUARE YARD WAY BE REOUIRED CUE TO CONDmet6
MATTING CHANNEi
SU~
8!.AN.KtT COMPOSITION. SOIL n1>E. SURFACE WllfORMnY, AHO SI.OPE SlED'NCSS.
f~CR$ Sl-IA.LL fl( PER WATTlNC MAHUf'ACTlJRt::R.
TliE SL0Pt M'l'lNO OF THE l!l..ANIC£T, A$ SPEClflED BY TI«: MAHUF'AcnJRER. SHAU.. 8£ APPROPIUATt. f"OR THE
JNTINDEO SLOPC. T(MPORARY EROSION CON1JHX. 81.ANl!CD. ~IC Bt.Af\llCDS AA£. MAOt Of .JJTE. SlRAW. WOOD SHAVINCS. COCOHUT
FlBCR {COD'!). OR VARIOtJS COMBINATIONS OF (I.at. CONSULT THE PROLCT EMCDUR TO O!T!RlollHE THE
DO£MO£O LONCtYtTY Of THE WATTDIC.
Sl.OPED SURFACE SHAU. et: FRfI Of ROCK$. a.oos, STICXS IVfJ CRASS.
APPLY LIME. rnrm.mR AND PERMANDIT SE!DlHC PR!OR TO INSTAU..INC WATTDICS. lR£E AND SHRUB
PU.NTINC S>tALL OCOJR Af'T£R JNSTALUNC I.CATS.
LAY MATS LOOSEl.Y AND STAPLE TO MAINTAIN DIRtcT CONTACT wtTH THE ron.. 00 NOT STRCTOi THC MATS
TIGHT. AU.OW 1HE MATS TO ROU. TO tr.IOU> TO ANY IRRECULARITIES.
STAPL.£ ANO ANOiOR MATTDIC PER THE Da'AILS ABO'JE OR: PER M..vlUf'ACT\JR!JtS SPECif'ICATIONS.
'toHOI ENCOIJHTERlNC NON-COHESM: SOll.. CONTRACTOR SHAU. Ust lOHCtA: STAPUS.
RfP.\IR ANY DAMACal AR£AS Of' nu: MAT AND STAPt.£ INTO Tl-IE GftOONO AHY AAf.AS NOT IN O..OSE CONTACT
WITH THE a«IUNO S\JRfACt..
A$
2..
3.
"·
~
0.
7.
a.
9.
10.
~
~ I
TN$TA! I ATTQN QETAD
~ J
~d
""""
1. MORE THAN llf£ MINIMUM Of ON£ f"AS"l'DltR PER S.OOARt YARD WAY et: R£0UJRED 00£ TO CONOrTlONS SUCH
AS 8t.ANK£T COMJ>OsrnON, son. T'1'E. Sl.JRf"A.ct UNlf'ORMITY. MIO Sl.Of>E STEEl"'NCSS.
2. FASTENotS SHAU. BE P£R t.1,>,TTINO t.MMUFACTURER.
3. THE SL.OP[ RATINO OF THC BlANKE'I'. AS SPEClflEI) BY TH£ t.1-'HUf"ACT\JRER. SHAU. BC APPROPRI.t.TI: 1'0R THC
INTCNOCJ) SI.OP£. TEMPORARY £RQSION CONTROL BL.ANKOS, HAVINC ~ OPOI AAtA. OF GO PERa:NT OR
CREA.TD, tr.IAY BE INST...u.ED PRIOR TO SUDING. BlANICtTS LESS THAH !!Iii PERCDIT OPOI SPM;;E. SHAU. a£
IHST~ Dolt.tEDIATD..Y FOU.OWINC THE SCIDJNC AND f'ERTIUZlNC OP£RATION.
4. DtOSION CONTROL Bl.ANCETS PROTtCT SOll. f!l:OW RUN~ ,\ND SHEET EROSION UMTIL. PERWoHENT
\'C:ETAnON IS CSTABUSl.£D. ORCANlC Bt.A>OO:TS ARt t.llJ)C OF ~ STRAW. WOOD SHA\'lNCS. COCONUT
fl8ER (COlll:}. OR VARIOUS COMBOOnOHs or EACH. COJ,ISUl..T TH£ PllO.CCT ENClNCDI TO DETIRMDI( TH£
JNTOIOCJ) LONGEVITY Of TI1£ t.tATTINC..
!S. Sl.OPOI SlJRF'Act: 9fAl..L l!IC f"Ra: OF ROOJN AA.OS NOT lH Q.ost CONTACT
WITH TI1£ CROUHD SURfAa:..
11. PRO\ltDE CHCCK SLOTS PER M"1fUF'ACT1JRE'RS RECCMMENOATlOMS.
12. ROI.I.. DI.OS MAY BE s:p,JC!I) lH A CHCCK SI.OT.
(..)
I
,!lo.~·
~l!li
~1;:1~
Ii·
5"' ~
§~:;;~,
..
:g~~~ 8
i;lzc,f:,,;
fl~§~g ~
~5!35
lr';~u.~~°"~
d
SI
~·
1JLCl.QCi;fDl:.t~DN\_Jll,,.,..~\,..JidM"9joCi.\S-mV..,.-"'°'1~\IJCS\11M~IA\CDll'n(,Jl.lNWP-2015-436
Page 6 of 7
Enclosure
"'"'
-
~~ ~
i~
0
0
-
.c:
a..
co
·a::
Cl)
c:
0
Cl)
(.)
Cl)
0::
Enclosure
Page 7 of 7
NWP-2015-436
PUBLIC NOTICE
Application for Permit
Issue Date: July 26, 2016
Expiration Date: August 24, 2016
US Army Corps of Engineers No: NWP-2015-436
Oregon Department of State Lands No: APP0059031
30-Day Notice
Interested parties are hereby notified the U.S. Army Corps of Engineers, Portland District (Corps)
has received an application for a Department of the Army permit for certain work in waters of
the United States, as described below and shown on the attached plans. The Corps is soliciting
comments on the proposed work.
Applicant:
Pacific Power
Attention: John Aniello
825 NE Multnomah Boulevard, 1700 LCT
Portland, Oregon 97232
Email: John.Aniello@pacificorp.com
Telephone: (503) 813-6030
Location: The project site is located at the intersection of Sam's Valley Hwy 234 and Tresham
Lane, Central Point, Jackson County, Oregon. The site is in Section 5 of Township 36 South,
Range 2 West.
Latitude and Longitude: 42.475275° North, 122.965122° West
Waterway: Three wetlands, covering 4.78 acres, and a roadside ditch were delineated at the
project site. All three wetlands are freshwater, palustrine emergent with vegetation dominated
by meadow foxtail. The wetland HGM classifications are depressional or depressional/slope
and are fed by surface runoff and/or a high groundwater table. Wetlands A and C are relatively
small (0.01 acres and 0.09 acres respectively) wetlands which are entirely contained within the
project site, whereas Wetland B is larger (4.68 acres) and extends outside the project area.
Project Purpose: The applicant's stated purpose is to construct, operate, and maintain a new
500 kV/230 kV substation to increase capacity and ensure reliability.
Project Description: Pacific Power is proposing to construct a new substation in Sam's
Valley. The proposed project would clear and grade the 20 acre site and discharge 31,209
cubic yards of fill material into 3.5 acres of wetlands to create a gravel pad to support the new
infrastructure. The fill material would consist primarily of rock from a local commercial source.
The site would be graded to direct stormwater into collection basins at which point it will be
conveyed through a series of storm drains into retention basins constructed in the northwest
and southwest corners of the site.
Corps No. NWP-2015-436
Page 1 of 6
Mitigation: The applicant proposes to avoid and minimize impacts from the project by
accessing the site via an access road constructed off of Tresham Lane which wraps around
the western boundary of the substation and connects to an existing access road south of the
proposed substation. Erosion control measures and stormwater management facilities would
be installed prior to commencement of removal or fill activities to minimize sedimentation of
wetlands, or portions of wetlands and increases in turbidity. Staging of equipment and
materials will likely occur within the substation footprint and would not be located within
jurisdictional wetland or water features.
The applicant has provided a proposed compensatory wetland mitigation plan to offset losses of
waters of the U.S. that may result from the proposed project. The applicant has proposed to
purchase 3.5 acre credits from the Rogue Valley Conservation and Mitigation Bank (Wildlands).
The classification values of the wetlands proposed for filling are: Palustrine, Emergent,
Seasonally Flooded Wetlands/Depression. The Corps will determine the type and amount of
compensatory mitigation necessary to offset environmental losses from the proposed project.
Drawings: Seven (7) drawings are attached and labeled Corps No. NWP-2015-436. Copies of
this public notice, which have been mailed or otherwise physically distributed, feature project
drawings in black and white. The electronic version features those drawings in color, which we
think more accurately illustrates the proposed project. To access the electronic version of this
public notice, go to the Portland District website at http://www.nwp.usace.army.mil/ and select
Regulatory Branch Permit Information. At the Regulatory page select Regulatory Public Notices.
Authority: The proposed project will be evaluated under the following:
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material
into waters of the United States.
Clean Water Act Section 404(b)(1) Guidelines: The described discharge will be evaluated for
compliance with guidelines promulgated by the U.S. Environmental Protection Agency under
authority of Section 404(b)(1) of the Clean Water Act. The 404(b)(1) Guidelines are the
substantive criteria used in evaluating discharges of dredged or fill material into waters of the
United States. The source of the fill material would be purchased from a local commercial source.
Water Quality Certification: Section 401 of the Clean Water Act (33 U.S.C. 1341) requires
applicants to obtain a water quality certification for proposed discharges into waters of the United
States. A permit for the described work will not be issued until certification has been issued or
is waived from the certifying state. Attached is the state's notice for a water quality certification.
Endangered Species: Section 7 of the Endangered Species Act (ESA) (16 U.S.C 1536)
requires federal agencies to consult with the National Marine Fisheries Service (NMFS) and/or
U.S. Fish and Wildlife Service (USFWS) on all actions that may affect a species listed (or
proposed for listing) under the ESA as threatened or endangered or that may adversely modify
designated critical habitat. The Corps' preliminary review indicates the described activity will not
affect any endangered species or designated critical habitat. Consultation under Section 7 of
the ESA is not required for the described activity. The Corps will make a final determination on
the need to consult after receipt of comments from this public notice including any comments
provided by the NMFS and/or USFWS.
Corps No. NWP-2015-436
Page 2 of 6
Essential Fish Habitat: Section 305(b)(2) of the Magnuson-Stevens Fishery Conservation and
Management Act (MSA) as amended (16 U.S.C 1855), requires Federal agencies to consult with
the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency,
that may adversely affect Essential Fish Habitat (EFH). The Corps' preliminary review indicates
the described activity would not adversely affect EFH at the project location or in its vicinity. The
Corps will make a final determination on the need to consult on EFH after receipt of comments
from this public notice including any comments provided by the NMFS.
Historic Properties/Cultural Resources: Section 106 of the National Historic Preservation Act
of 1966, as amended (16 U.S.C. 470), requires Federal agencies to consult with the appropriate
State and/or Tribal Historic Preservation Officer to take into account the effects of actions they
undertake or permit on historic properties listed in or eligible for listing in the National Register
of Historic Places. The Corps' preliminary review indicates to the best of our knowledge, the
described activity is not located on property registered or eligible for registration in the latest
published version of the National Register of Historic Places. At this time the Corps is unaware
of any cultural resource surveys of the project area.
This notice has been provided to the State Historic Preservation Office (SHPO), interested Native
American Indian Tribes, and other interested parties. If you have information pertaining to
cultural resources within the permit area, please provide this information to the Corps' project
manager identified at the end of this notice to assist in a complete evaluation of potential effects.
State and Local Authorizations: The applicant has obtained approval from Jackson County
and has applied for a Removal/Fill permit with the Oregon Department of State Lands.
Public Hearing: Any person may request in writing within the comment period specified in this
notice that a public hearing be held to consider this application. Requests for public hearings
shall state with particularity the reasons for holding a public hearing.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the
probable impact, including cumulative impacts, of the described activity on the public interest.
That decision will reflect the national concern for both protection and utilization of important
resources. The benefit, which reasonably may be expected to accrue from the described activity,
must be balanced against its reasonably foreseeable detriments. All factors, which may be
relevant to the described activity will be considered including the cumulative effects thereof;
among those are conservation, economics, aesthetics, general environmental concerns,
wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use,
navigation, shoreline erosion and accretion, recreation, water supply and conservation, water
quality, energy needs, safety, food and fiber production, mineral needs, consideration of property
ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials;
Indian Tribes; and other interested parties in order to consider and evaluate the impacts of the
proposed project. Comments received will be considered by the Corps to determine whether to
issue, modify, condition or deny a permit for this proposal. Comments are used in the
preparation of an Environmental Assessment and/or an Environmental Impact Statement
pursuant to the National Environmental Policy Act. Comments are also used to determine the
need for a public hearing.
Corps No. NWP-2015-436
Page 3 of 6
Submitting Comments: Interested parties are invited to provide comments on the proposed
project. Comments may be submitted by conventional mail or email. All comments received will
be considered in determining whether authorizing the work would be contrary to the public
interest.
Either conventional mail or e-mail comments must include the Corps reference number as shown
on page 1 and include the commenter's name and address. In order to be accepted, e-mail
comments must originate from the author's e-mail account and must include on the subject line
of the e-mail message the Corps reference number. All comments received will become part of
the administrative record and are subject to public release under the Freedom of Information Act
including any personally identifiable information such as names, phone numbers, and
addresses.
Additional information about the proposed project may be obtained from the Corps Project
Manager listed below. All comments, whether by conventional mail or email, must be received
no later than the expiration date of this public notice to ensure consideration. Comments should
be submitted to the following mailing address or email address:
U.S. Army Corps of Engineers
Omar Ortiz
Eugene Field Office
211 E. 7th Avenue, Suite 105
Eugene, Oregon 97401-2722
Email: Omar.M.Ortiz@usace.army.mil
Telephone: (541) 465-6878
Corps No. NWP-2015-436
Page 4 of 6
PUBLIC NOTICE
Oregon Department of Environmental Quality (DEQ)
Water Quality 401 Certification
Notice Issued: July 26, 2016
Written Comments Due: August 24, 2016
Corps of Engineers No: NWP-2015-436
Oregon Department of State Lands No: APP0059031
WHO IS THE APPLICANT: Pacific Power
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers
public notice.
WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the
proposed project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants
for Federal permits or licenses to provide the Federal agency a water quality certification from
the State of Oregon if the proposed activity may result in a discharge to waters of the state.
DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice
on the proposed project.
WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as
a result of the proposal are available for examination and copying at Oregon Department of
Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region,
700 NE Multnomah Street, Suite 600, Portland, Oregon 97232. Other project materials are
available by contacting the Corps per the attached public notice.
Scheduling an appointment will ensure that water quality documents are readily accessible
during your visit. To schedule an appointment please call DEQ Water Quality at Northwest
Region at (503) 229-5263.
Any questions on the water quality certification process may be addressed to the 401 Program
Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People with hearing
impairments may call the Oregon Telecommunications Relay Service at 1-800-735-2900.
PUBLIC PARTICIPATION:
Corps No. NWP-2015-436
Page 5 of 6
Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that "The Corps
provides public notice of and opportunity to comment on the applications, including the
application for certification, provided that the department (DEQ), in its discretion, may provide
additional opportunity for public comment, including public hearing."
Written comments:
Written comments on project elements related to water quality must be received at the Oregon
Department of Environmental Quality by 5 p.m. on the date specified in the upper right section
on page one of this notice. Written comments may be emailed, mailed or faxed as described
below:
Email - 401publiccomments@deq.state.or.us
Mail - Oregon Department of Environmental Quality, Northwest Region
700 NE Multnomah Street, Suite 600
Portland, Oregon 97232
Attn: 401 Water Quality Certification Coordinator
Fax - (503) 229-6957
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public
comment period. Following this review, certification of the proposal may be issued as proposed,
issued with conditions, or denied. You will be notified of DEQ's final decision if you submit
comments during the comment period. Otherwise, if you wish to receive notification, please call
or write DEQ at the above address.
ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large
print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at
(503) 229-5317 or toll free within Oregon at 1-800-452-4011 to request an alternate format.
People with a hearing impairment can receive help by calling the Oregon Telecommunications
Relay Service at 1-800-735-2900.
Corps No. NWP-2015-436