Andrea Wagner is the Regulatory point-of-contact for this permit application from the Albany Parks Department to conduct work impacting an unnamed wetland adjacent to municipal stormwater pipes in Albany, Linn County, Oregon.
PUBLIC NOTICE
Application for Permit
Issue Date: August 4, 2016
Expiration Date: September 5, 2016
US Army Corps of Engineers No: NWP-2016-180
30-Day Notice Oregon Department of State Lands No: 59026-RF
Interested parties are hereby notified the U.S. Army Corps of Engineers, Portland District (Corps) has received an application for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plans. The Corps is soliciting comments on the proposed work.
Applicant: Albany Parks Department
Attention: Ed Hodney
333 Broadalbin Street Southwest
Albany, Oregon 97321-2247
Email: ed.hodney@cityofalbany.net
Telephone: (541) 917-7777
Location: The project site is located at 730 20th Avenue Southeast, Albany, Oregon. The site is in Section 18, Township 11 South, Range 3 West.Latitude and Longitude: 44.62073° North, 123.09420° West
Waterway: The project is located in an unnamed wetland adjacent to municipal stormwater pipes which eventually discharge into Periwinkle Creek.
Project Purpose: The applicant’s stated purpose is to rehabilitate a city park to current design standards and improve safety.
Project Description: The proposed project, Sunrise Park Renovation, would permanently fill 0.6 acres of wetlands to modernize the existing recreational facilitates to meet current safety and ADA standards. The project would remove all existing play equipment, covered shelters, and concrete pads and construct a new play area and parking lot on the north end of the park where there is more visibility, increasing neighborhood safety. Once removed of equipment the concrete pad would be removed, graded to match contours, and seeded to match surrounding vegetation. Impacts to Wetland A include the construction of off-street parking and a pad to accommodate park amenities including a basketball court and benches.
Mitigation: The applicant proposes to avoid and minimize impacts from the project by implementing best management practices such as an Erosion Prevention and Sediment Control Plan to minimize impacts during construction and a Stormwater Management Plan to treat runoff from the site prior to discharging it into municipal stormwater pipes which eventually discharge into Periwinkle Creek. The applicant proposes to purchase credits from the Long Tom Mitigation Bank as compensatory mitigation to offset losses of aquatic function that may result from the proposed project. The Corps will determine the type and amount of compensatory mitigation necessary to offset environmental losses from the proposed project.
Drawings: Seven (7) drawings are attached and labeled Corps No. NWP-2016-180. Copies of this public notice, which have been mailed or otherwise physically distributed, feature project drawings in black and white. The electronic version features those drawings in color, which we think more accurately illustrates the proposed project. To access the electronic version of this public notice, go to the Portland District website at http://www.nwp.usace.army.mil/ and select Regulatory Branch Permit Information. At the Regulatory page select Regulatory Public Notices.
Authority: The proposed project will be evaluated under the following:
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.
Clean Water Act Section 404(b)(1) Guidelines: The described discharge will be evaluated for compliance with guidelines promulgated by the U.S. Environmental Protection Agency under authority of Section 404(b)(1) of the Clean Water Act. The 404(b)(1) Guidelines are the substantive criteria used in evaluating discharges of dredged or fill material into waters of the United States. Should a permit be issued, the Corps will evaluate the fill material source (i.e., borrow site) prior to the start of construction.
Water Quality Certification: Section 401 of the Clean Water Act (33 U.S.C. 1341) requires applicants to obtain a water quality certification for proposed discharges into waters of the United States. A permit for the described work will not be issued until certification has been issued or is waived from the certifying state. Attached is the state's notice for a water quality certification.
Endangered Species: Section 7 of the Endangered Species Act (ESA) (16 U.S.C 1536) requires federal agencies to consult with the National Marine Fisheries Service (NMFS) and/or U.S. Fish and Wildlife Service (USFWS) on all actions that may affect a species listed (or proposed for listing) under the ESA as threatened or endangered or that may adversely modify designated critical habitat. The Corps’ preliminary review indicates the described activity may affect endangered species or designated critical habitat. For this project, the Department of Housing and Urban Development (HUD), as the lead Federal agency for ESA consultation, will consult with the NMFS and/or the USFWS as required under Section 7 of the ESA.
Essential Fish Habitat: Section 305(b)(2) of the Magnuson-Stevens Fishery Conservation and Management Act (MSA) as amended (16 U.S.C 1855), requires Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH). The Corps’ preliminary review indicates the described activity would adversely affect EFH at the project location or in its vicinity. For this project, the HUD, as the lead Federal agency for MSA consultation, will consult with the NMFS as necessary.
Historic Properties/Cultural Resources: Section 106 of the National Historic Preservation Act (NHPA) of 1966, as amended (16 U.S.C. 470), requires Federal agencies to consult with the appropriate State and/or Tribal Historic Preservation Officer to take into account the effects of actions they undertake or permit on historic properties listed in or eligible for listing in the National Register of Historic Places. For this project, the HUD, as the lead Federal agency for determining compliance with Section 106 of the NHPA, will consult with the appropriate State and/or Tribal Historic Preservation Officer as applicable. The Corps’ preliminary review indicates to the best of our knowledge, the described activity is not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places. At this time the Corps is unaware of any cultural resource surveys of the project area.
This notice has been provided to the State Historic Preservation Office (SHPO), interested Native American Indian Tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps’ project manager identified at the end of this notice to assist in a complete evaluation of potential effects.
Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact, including cumulative impacts, of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of the proposed project. Comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing.
Submitting Comments: Interested parties are invited to provide comments on the proposed project. Comments may be submitted by conventional mail or email. All comments received will be considered in determining whether authorizing the work would be contrary to the public interest.
Either conventional mail or e-mail comments must include the Corps reference number as shown on page 1 and include the commenter’s name and address. In order to be accepted, e-mail comments must originate from the author’s e-mail account and must include on the subject line of the e-mail message the Corps reference number. All comments received will become part of the administrative record and are subject to public release under the Freedom of Information Act including any personally identifiable information such as names, phone numbers, and addresses.
Additional information about the proposed project may be obtained from the Corps Project Manager listed below. All comments, whether by conventional mail or email, must be received no later than the expiration date of this public notice to ensure consideration. Comments should be submitted to the following mailing address or email address:
U.S. Army Corps of Engineers
Ms. Andrea Wagner
Eugene Field Office
211 E. 7th Avenue, Suite 105
Eugene, Oregon 97401-2722
Email: andrea.r.wagner@usace.army.mil
Telephone: (541) 465-6882
PUBLIC NOTICE
Oregon Department of Environmental Quality (DEQ)
Water Quality 401 Certification
Notice Issued: August 4, 2016
Written Comments Due: September 5, 2016
Corps of Engineers No: NWP-2016-180
Oregon Department of State Lands No: 59026-RF
WHO IS THE APPLICANT: Albany Parks Department
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers public notice.
WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the proposed project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for Federal permits or licenses to provide the Federal agency a water quality certification from the State of Oregon if the proposed activity may result in a discharge to waters of the state.
DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice on the proposed project.
WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a result of the proposal are available for examination and copying at Oregon Department of Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region,
700 NE Multnomah Street, Suite 600, Portland, Oregon 97232. Other project materials are available by contacting the Corps per the attached public notice.
Scheduling an appointment will ensure that water quality documents are readily accessible during your visit. To schedule an appointment please call DEQ Water Quality at Northwest Region at (503) 229-5263.
Any questions on the water quality certification process may be addressed to the 401 Program Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People with hearing impairments may call the Oregon Telecommunications Relay Service at 1-800-735-2900.
PUBLIC PARTICIPATION:
Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that “The Corps provides public notice of and opportunity to comment on the applications, including the application for certification, provided that the department (DEQ), in its discretion, may provide additional opportunity for public comment, including public hearing.”
Written comments:Written comments on project elements related to water quality must be received at the Oregon Department of Environmental Quality by 5 p.m. on the date specified in the upper right section on page one of this notice. Written comments may be emailed, mailed or faxed as described below:
Email - 401publiccomments@deq.state.or.us
Mail - Oregon Department of Environmental Quality, Northwest Region
700 NE Multnomah Street, Suite 600
Portland, Oregon 97232
Attn: 401 Water Quality Certification Coordinator
Fax - (503) 229-6957
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public comment period. Following this review, certification of the proposal may be issued as proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you submit comments during the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at the above address.
ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at (503) 229-5317 or toll free within Oregon at 1-800-452-4011 to request an alternate format. People with a hearing impairment can receive help by calling the Oregon Telecommunications Relay Service at 1-800-735-2900.
SHEET 1 OF 10 - Location Map
'H/RUPH6WUHHW$WODV86$
PROJECT
'DWDXVHVXEMHFWWROLFHQVH
'H/RUPH'H/RUPH6WUHHW$WODV86$
6FDOH
71
01 (
ZZZGHORUPHFRP
NWP-2016-180
IW
Page 1 of 7
IW
P
'DWD=RRP
Enclosure
SHEET 2 OF 10 -
PROJECT
NWP-2016-180
Page 2 of 7
Enclosure
0
280'
N
PROJECT
SHEET 3 OF 10 Tax
NWP-2016-180
Page 3 of 7
Enclosure
SHEET 4 OF 10 - Air
Photo
PROJECT
NWP-2016-180
Page 4 of 7
Enclosure
NWP-2016-180
Page 5 of 7
Enclosure
SHEET 7 OF
CONCRETE PAD & WALK TO BE
REMOVED GRADED TO MATCH
N
SHEET 8 OF
NWP-2016-180
Page 6 of 7
Enclosure
SHEET 9 OF
NWP-2016-180
Page 7 of 7
Enclosure
PUBLIC NOTICE
Application for Permit
Issue Date: [TODAY]
Expiration Date: [TODAY+30]
US Army Corps of Engineers No: NWP-2016-180
Oregon Department of State Lands No: 59026-RF
30-Day Notice
Interested parties are hereby notified the U.S. Army Corps of Engineers, Portland District
(Corps) has received an application for a Department of the Army permit for certain work in
waters of the United States, as described below and shown on the attached plans. The Corps
is soliciting comments on the proposed work.
Applicant:
Albany Parks Department
Attention: Ed Hodney
333 Broadalbin Street Southwest
Albany, Oregon 97321-2247
Email: ed.hodney@cityofalbany.net
Telephone: (541) 917-7777
Location: The project site is located at 730 20th Avenue Southeast, Albany, Oregon. The site
is in Section 18, Township 11 South, Range 3 West.
Latitude and Longitude: 44.62073° North, 123.09420° West
Waterway: The project is located in an unnamed wetland adjacent to municipal stormwater
pipes which eventually discharge into Periwinkle Creek.
Project Purpose: The applicant's stated purpose is to rehabilitate a city park to current design
standards and improve safety.
Project Description: The proposed project, Sunrise Park Renovation, would permanently fill
0.6 acres of wetlands to modernize the existing recreational facilitates to meet current safety
and ADA standards. The project would remove all existing play equipment, covered shelters,
and concrete pads and construct a new play area and parking lot on the north end of the park
where there is more visibility, increasing neighborhood safety. Once removed of equipment
the concrete pad would be removed, graded to match contours, and seeded to match
surrounding vegetation. Impacts to Wetland A include the construction of off-street parking
and a pad to accommodate park amenities including a basketball court and benches.
Mitigation: The applicant proposes to avoid and minimize impacts from the project by
implementing best management practices such as an Erosion Prevention and Sediment
Control Plan to minimize impacts during construction and a Stormwater Management Plan to
treat runoff from the site prior to discharging it into municipal stormwater pipes which eventually
discharge into Periwinkle Creek. The applicant proposes to purchase credits from the Long
Corps No. NWP-2016-180
Page 1 of 6
Tom Mitigation Bank as compensatory mitigation to offset losses of aquatic function that may
result from the proposed project. The Corps will determine the type and amount of
compensatory mitigation necessary to offset environmental losses from the proposed project.
Drawings: Seven (7) drawings are attached and labeled Corps No. NWP-2016-180. Copies
of this public notice, which have been mailed or otherwise physically distributed, feature project
drawings in black and white. The electronic version features those drawings in color, which we
think more accurately illustrates the proposed project. To access the electronic version of this
public notice, go to the Portland District website at http://www.nwp.usace.army.mil/ and select
Regulatory Branch Permit Information. At the Regulatory page select Regulatory Public
Notices.
Authority: The proposed project will be evaluated under the following:
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material
into waters of the United States.
Clean Water Act Section 404(b)(1) Guidelines: The described discharge will be evaluated
for compliance with guidelines promulgated by the U.S. Environmental Protection Agency
under authority of Section 404(b)(1) of the Clean Water Act. The 404(b)(1) Guidelines are the
substantive criteria used in evaluating discharges of dredged or fill material into waters of the
United States. Should a permit be issued, the Corps will evaluate the fill material source (i.e.,
borrow site) prior to the start of construction.
Water Quality Certification: Section 401 of the Clean Water Act (33 U.S.C. 1341) requires
applicants to obtain a water quality certification for proposed discharges into waters of the
United States. A permit for the described work will not be issued until certification has been
issued or is waived from the certifying state. Attached is the state's notice for a water quality
certification.
Endangered Species: Section 7 of the Endangered Species Act (ESA) (16 U.S.C 1536)
requires federal agencies to consult with the National Marine Fisheries Service (NMFS) and/or
U.S. Fish and Wildlife Service (USFWS) on all actions that may affect a species listed (or
proposed for listing) under the ESA as threatened or endangered or that may adversely modify
designated critical habitat. The Corps' preliminary review indicates the described activity may
affect endangered species or designated critical habitat. For this project, the Department of
Housing and Urban Development (HUD), as the lead Federal agency for ESA consultation, will
consult with the NMFS and/or the USFWS as required under Section 7 of the ESA.
Essential Fish Habitat: Section 305(b)(2) of the Magnuson-Stevens Fishery Conservation
and Management Act (MSA) as amended (16 U.S.C 1855), requires Federal agencies to
consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by
the agency, that may adversely affect Essential Fish Habitat (EFH). The Corps' preliminary
review indicates the described activity would adversely affect EFH at the project location or in
its vicinity. For this project, the HUD, as the lead Federal agency for MSA consultation, will
consult with the NMFS as necessary.
Historic Properties/Cultural Resources: Section 106 of the National Historic Preservation
Act (NHPA) of 1966, as amended (16 U.S.C. 470), requires Federal agencies to consult with
the appropriate State and/or Tribal Historic Preservation Officer to take into account the effects
Corps No. NWP-2016-180
Page 2 of 6
of actions they undertake or permit on historic properties listed in or eligible for listing in the
National Register of Historic Places. For this project, the HUD, as the lead Federal agency for
determining compliance with Section 106 of the NHPA, will consult with the appropriate State
and/or Tribal Historic Preservation Officer as applicable. The Corps' preliminary review
indicates to the best of our knowledge, the described activity is not located on property
registered or eligible for registration in the latest published version of the National Register of
Historic Places. At this time the Corps is unaware of any cultural resource surveys of the
project area.
This notice has been provided to the State Historic Preservation Office (SHPO), interested
Native American Indian Tribes, and other interested parties. If you have information pertaining
to cultural resources within the permit area, please provide this information to the Corps' project
manager identified at the end of this notice to assist in a complete evaluation of potential
effects.
Public Hearing: Any person may request in writing within the comment period specified in this
notice that a public hearing be held to consider this application. Requests for public hearings
shall state with particularity the reasons for holding a public hearing.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the
probable impact, including cumulative impacts, of the described activity on the public interest.
That decision will reflect the national concern for both protection and utilization of important
resources. The benefit, which reasonably may be expected to accrue from the described
activity, must be balanced against its reasonably foreseeable detriments. All factors, which
may be relevant to the described activity will be considered including the cumulative effects
thereof; among those are conservation, economics, aesthetics, general environmental
concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain
values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production, mineral needs,
consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and
officials; Indian Tribes; and other interested parties in order to consider and evaluate the
impacts of the proposed project. Comments received will be considered by the Corps to
determine whether to issue, modify, condition or deny a permit for this proposal. Comments
are used in the preparation of an Environmental Assessment and/or an Environmental Impact
Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing.
Submitting Comments: Interested parties are invited to provide comments on the proposed
project. Comments may be submitted by conventional mail or email. All comments received
will be considered in determining whether authorizing the work would be contrary to the public
interest.
Either conventional mail or e-mail comments must include the Corps reference number as
shown on page 1 and include the commenter's name and address. In order to be accepted, email comments must originate from the author's e-mail account and must include on the subject
line of the e-mail message the Corps reference number. All comments received will become
part of the administrative record and are subject to public release under the Freedom of
Corps No. NWP-2016-180
Page 3 of 6
Information Act including any personally identifiable information such as names, phone
numbers, and addresses.
Additional information about the proposed project may be obtained from the Corps Project
Manager listed below. All comments, whether by conventional mail or email, must be received
no later than the expiration date of this public notice to ensure consideration. Comments should
be submitted to the following mailing address or email address:
U.S. Army Corps of Engineers
Ms. Andrea Wagner
Eugene Field Office
211 E. 7th Avenue, Suite 105
Eugene, Oregon 97401-2722
Email: andrea.r.wagner@usace.army.mil
Telephone: (541) 465-6882
Corps No. NWP-2016-180
Page 4 of 6
PUBLIC NOTICE
Oregon Department of Environmental Quality (DEQ)
Water Quality 401 Certification
Notice Issued: [TODAY]
Written Comments Due: [TODAY+30]
Corps of Engineers No: NWP-2016-180
Oregon Department of State Lands No: 59026-RF
WHO IS THE APPLICANT: Albany Parks Department
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers
public notice.
WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the
proposed project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants
for Federal permits or licenses to provide the Federal agency a water quality certification from
the State of Oregon if the proposed activity may result in a discharge to waters of the state.
DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice
on the proposed project.
WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as
a result of the proposal are available for examination and copying at Oregon Department of
Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region,
700 NE Multnomah Street, Suite 600, Portland, Oregon 97232. Other project materials are
available by contacting the Corps per the attached public notice.
Scheduling an appointment will ensure that water quality documents are readily accessible
during your visit. To schedule an appointment please call DEQ Water Quality at Northwest
Region at (503) 229-5263.
Any questions on the water quality certification process may be addressed to the 401 Program
Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People with
hearing impairments may call the Oregon Telecommunications Relay Service at 1-800-7352900.
Corps No. NWP-2016-180
Page 5 of 6
PUBLIC PARTICIPATION:
Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that "The Corps
provides public notice of and opportunity to comment on the applications, including the
application for certification, provided that the department (DEQ), in its discretion, may provide
additional opportunity for public comment, including public hearing."
Written comments:
Written comments on project elements related to water quality must be received at the Oregon
Department of Environmental Quality by 5 p.m. on the date specified in the upper right section
on page one of this notice. Written comments may be emailed, mailed or faxed as described
below:
Email - 401publiccomments@deq.state.or.us
Mail - Oregon Department of Environmental Quality, Northwest Region
700 NE Multnomah Street, Suite 600
Portland, Oregon 97232
Attn: 401 Water Quality Certification Coordinator
Fax - (503) 229-6957
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the
public comment period. Following this review, certification of the proposal may be issued as
proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you
submit comments during the comment period. Otherwise, if you wish to receive notification,
please call or write DEQ at the above address.
ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large
print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at
(503) 229-5317 or toll free within Oregon at 1-800-452-4011 to request an alternate format.
People with a hearing impairment can receive help by calling the Oregon Telecommunications
Relay Service at 1-800-735-2900.
Corps No. NWP-2016-180
Page 6 of 6