Home

Alaska District

Run scraper

Haida Energy

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Haida Energy, Inc.'s stated purpose for the Deer Bay and Copper Bay marine facilities is to provide a shorter, more efficient and cost effective route to the Hiilangaay (formerly the Reynolds Creek) Hydroelectric Project site.The proposed project would consist of multiple components. The components that would impact waters of the U.S. and are therefore within the regulatory jurisdiction of the Army Corps of Engineers (Corps) are:•Division dam and intake structure at the outlet of Rich’s Pond;•Deer Bay launch ramp (previously permitted but modified to avoid impacts to eel grass);•Deer Bay pier and float structure;•Copper Harbor launch ramp (previously permitted but modified to reduce impacts); •Copper Harbor Bulkhead and float (float was previously permitted but modified); and,•Copper Harbor barge ramp (previously permitted but modified). See the enclosed Attachment A for a complete description of the proposed work and impacts. All work would be performed in accordance with the enclosed plan (sheets 1-9), dated May 2016. Please contact Ms. Amanda Whittier at (907) 753-5582, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at Amanda.L.Whittier@usace.army.mil if further information is desired concerning this notice.

Haida Energy, Inc.'s stated purpose for the Deer Bay and Copper Bay marine facilities is to provide a shorter, more efficient and cost effective route to the Hiilangaay (formerly the Reynolds Creek) Hydroelectric Project site. The proposed project would consist of multiple components. The components that would impact waters of the U.S. and are therefore within the regulatory jurisdiction of the Army Corps of Engineers (Corps) are:•Division dam and intake structure at the outlet of Rich’s Pond;•Deer Bay launch ramp (previously permitted but modified to avoid impacts to eel grass);•Deer Bay pier and float structure;•Copper Harbor launch ramp (previously permitted but modified to reduce impacts);•Copper Harbor Bulkhead and float (float was previously permitted but modified); and, Copper Harbor barge ramp (previously permitted but modified). See the enclosed Attachment A for a complete description of the proposed work and impacts. All work would be performed in accordance with the enclosed plan (sheets 1-9), dated May 2016. Please contact Ms. Amanda Whittier at (907) 753-5582, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at Amanda.L.Whittier@usace.army.mil if further information is desired concerning this notice. POA-1995-127-M5, Reynolds Creek_PN POA-1995-127-M5, Reynolds Creek_ Application

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas