You can copy from here when filling out the rest of the page.
Port of Richmond Terminal 7 & 8 Maintenance Dredging
The Port of Richmond has applied to the U.S. Army Corps of Engineers for a 10-year Department of the Army Permit to dredge sediment from its’ Terminals 7 & 8. The purpose of the proposed dredging is to return the two terminals to their originally permitted depth to allow safe navigational depths for commercial vessels.