POA-2007-601-M1

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Mr. Terrence L. Smith's stated purpose is to construct a dock to provide additional moorage.The project site is located within Section 5, T. 74 S., R. 81 E., Copper River Meridian; USGS Quad Map Craig B-4; Latitude 55.4775º N., Longitude 133.1453º W.; Prince of Wales-Hyder Census Area; in Craig, Alaska. The applicant proposes to:

•Construct a pier structure that would in total have a 5-foot by 110-foot pile supported dock with three 5-foot by 38-foot fingers. The applicant would utilize the current structure previously permitted but not completed. Six additional 8-12 inch pilings would be driven for the structure;

•Three areas within the pier structure would be dredged to -5.3 feet Mean Lower Low Water (MLLW) for a total of 1,500 cubic yards of material. The material would be placed behind the riprap wall and on uplands; and,

•Discharge 15 CY of shot rock on the southern boundary of the project area from below mean high water to 0 feet MLLW.

All work would be performed in accordance with the enclosed plan (sheets 1-5), dated July 1, 2016.

Please contact Ms. Amanda Whittier at (907) 753-5582, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at Amanda.L.Whittier@usace.army.mil if further information is desired concerning this notice.

Mr. Terrence L. Smith's stated purpose is to construct a dock to provide additional moorage.The project site is located within Section 5, T. 74 S., R. 81 E., Copper River Meridian; USGS Quad Map Craig B-4; Latitude 55.4775º N., Longitude 133.1453º W.; Prince of Wales-Hyder Census Area; in Craig, Alaska. The applicant proposes to: •Construct a pier structure that would in total have a 5-foot by 110-foot pile supported dock with three 5-foot by 38-foot fingers. The applicant would utilize the current structure previously permitted but not completed. Six additional 8-12 inch pilings would be driven for the structure; •Three areas within the pier structure would be dredged to -5.3 feet Mean Lower Low Water (MLLW) for a total of 1,500 cubic yards of material. The material would be placed behind the riprap wall and on uplands; and, •Discharge 15 CY of shot rock on the southern boundary of the project area from below mean high water to 0 feet MLLW. All work would be performed in accordance with the enclosed plan (sheets 1-5), dated July 1, 2016. Please contact Ms. Amanda Whittier at (907) 753-5582, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at Amanda.L.Whittier@usace.army.mil if further information is desired concerning this notice. POA-2007-601-M1, Klawock Inlet_PN

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas