Danielle Erb is the Regulatory point-of-contact for this permit application from the Port of Chinook to conduct maintenance dredging in the Port of Chinook, Chinook Washington.
JOINT PUBLIC NOTICE for Permit Application
US Army Corps of Engineers
Regulatory Branch
Post Office Box 2946
Portland, OR 97208-2946
Telephone (503) 808-4386
Attn: Danielle Erb, Project Manager
WA Department of Ecology
SEA Program
Post Office Box 47600
Olympia, WA 98504-7600
Telephone: (360) 407-6068
ATTN: SEA Program, FederalPermit
Coordinator
Public Notice Date: August 22, 2016
Expiration Date: September 21, 2016
Reference No.: NWP-2008-472-1
Chinook Marina Maintenance Dredging
Interested parties are hereby notified that the U.S. Army Corps of Engineers (Corps) and the Washington Department of Ecology (Ecology) have received an application to perform work in waters of the U.S. as described below and shown on the enclosed drawings dated July 2016.
The Corps will review the work in accordance with Section 404 of the Clean Water Act (CWA) and Section 10 of the Rivers and Harbors Act. Ecology will review the work pursuant to Section 401 of the CWA, with applicable provisions of State water pollution control laws and the Coastal Zone Management Act.
APPLICANT: Port of Chinook
Attention: Guy Glenn
P.O. Box 185
Chinook, WA 98614
Telephone: (360) 642-3143
AGENT: BergerABAM
Attention: Carissa Watanabe
210 East 13th Street, Suite 300
Vancouver, WA 98660
Telephone: (360) 823-6102
LOCATION: Port of Chinook Marina
743 Water Street
Chinook, WA 98614
WORK: The applicant proposes to continue annual maintenance dredging of the existing marina to a depth of -10 feet MLLW in the commercial area, and to -8 feet MLLW in the two recreational areas. Up to 20,000 cubic yards of sediments would be dredged from an approximate area of 9.7 acres within the marina per dredge event. Dredging would be accomplished by use of a hydraulic dredge and pipeline. Dredged materials would be placed at the Port's adjacent upland site for settling prior to discharging back into Baker Bay.
PURPOSE: Remove accumulated sediments to maintain boat access to the marina.
Dredged Material Testing: The proposed dredged material will be evaluated in accordance with the Sediment Evaluation Framework for the Pacific Northwest (SEF). The interagency Portland Sediment Evaluation Team (PSET) implements the SEF for the Corps Portland District. The PSET will determine if sediment testing is required for this project. Project sediments may require physical, chemical, and/or biological testing to support the permit application evaluation. The PSET will evaluate the applicant’s sediment testing results and determine if project sediments are suitable for unconfined, aquatic disposal or exposure.
The proposed project includes future maintenance dredging. Prior to each maintenance dredging cycle the applicant would be required to coordinate with the Corps and the PSET to determine if additional sediment testing is required.
ADDITIONAL INFORMATION: The applicant is requesting a 10-year permit for maintenance dredging.
MITIGATION:The applicant has not proposed compensatory mitigation. The Corps will determine what is appropriate and practicable compensatory mitigation commensurate with the project impacts.
ENDANGERED SPECIES:The Endangered Species Act (ESA) requires federal agencies to consult with the National Marine Fisheries Service (NMFS) and/or U.S. Fish and Wildlife Service (USFWS) pursuant to Section 7 of the ESA on all actions that may affect a species listed (or proposed for listing) under the ESA as threatened or endangered or any designated critical habitat.
After receipt of comments from this public notice, the U.S. Army Corps of Engineers will evaluate the potential impacts to proposed and/or listed species and their designated critical habitat.
ESSENTIAL FISH HABITAT:The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH). The proposed action would impact EFH in the project area.
If the U.S. Army Corps of Engineers (Corps) determines that the proposed action may adversely affect EFH for federally managed fisheries in Washington waters, the Corps will initiate EFH consultation with the NMFS. The Corps’ final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the NMFS.
CULTURAL RESOURCES:The Corps has reviewed the latest published version of the National Register of Historic Places, Washington Information System for Architectural and Archaeological Records Data and other sources of information. Historic properties are recorded near the proposed project. However, they do not occur in the permit area. The permit area was created in modern times and there is little likelihood that the proposed project will impinge on any historic property. The Corps invites responses to this public notice from Native American Tribes or tribal governments; Federal, State, and local agencies; historical and archeological societies; and other parties likely to have knowledge of or concerns regarding historic properties and sites of religious and cultural significance at or near the project area. After receipt of comments from this public notice, the Corps will evaluate potential impacts and consult with the State Historic Preservation Officer and Native American Tribes in accordance with Section 106 of the National Historic Preservation Act, as appropriate.
PUBLIC HEARING:Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing.
EVALUATION – CORPS:The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered, including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Native American Nations or tribal governments; Federal, State, and local agencies and officials; and other interested parties in order to consider and evaluate the impacts of this activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for the work. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the activity.
The described discharge will be evaluated for compliance with guidelines promulgated by the Environmental Protection Agency under authority of Section 404(b)(1) of the CWA. These guidelines require an alternatives analysis for any proposed discharge of dredged or fill material into waters of the United States.
EVALUATION – ECOLOGY:Ecology is soliciting comments from the public; Federal, Native American Nations or tribal governments, State, and local agencies and officials; and other interested parties in order to consider and evaluate the impacts of this activity. Ecology will be considering all comments to determine whether to certify or deny certification for the proposed project.
ADDITIONAL EVALUATION:Pacific County has issued an exemption (P1600405) from the requirement of obtaining a Shorelines Substantial Development permit for this project on August 15, 2016.
COMMENT AND REVIEW PERIOD:Conventional mail or e-mail comments on this public notice will be accepted and made part of the record and will be considered in determining whether authorizing the work would not be contrary to the public interest. In order to be accepted, e-mail comments must originate from the author’se-mail account and must include on the subject line of the e-mail message the permit applicant’s name and reference number as shown below. Either conventional mail or e-mail comments must include the permit applicant’s name and reference number, as shown below, and the commenter’s name, address, and phone number. All comments whether conventional mail or e-mail must reach this office, no later than the expiration date of this public notice to ensure consideration.
Copies of this public notice which have been mailed or otherwise physically distributed feature project drawings in black and white. The electronic version features those drawings in color, which we think more accurately communicates the scope of project impacts. To access the electronic version of this public notice, go to the Portland District’s web page at http://www.nwp.usace.army.mil/ under Regulatory Public Notices. Recently-issued public notices are listed in chronological order of the date of issuance. Select and view the listing for this project.
CORPS COMMENTS:All e-mail comments should be sent to Danielle.H.Erb@usace.army.mil
Conventional mail comments should be sent to: U.S. Army Corps of Engineers, Regulatory Branch,Attention: Danielle Erb, P.O. Box 2946, Portland, OR 97208-2946. All comments received will become part of the administrative record and are subject to public release under the Freedom of Information Act including any personally identifiable information such as names, phone numbers, and addresses.
ECOLOGY COMMENTS:Any person desiring to present views on the project pertaining to a request for water quality certification under Section 401 of the CWA and/or Coastal Zone Management consistency concurrence, may do so by submitting written comments to the following address: Washington State Department of Ecology, Attention: Federal Permit Coordinator, Post Office Box 47600, Olympia, Washington 98504-7600, or e-mail to ecyrefedpermits@ecy.wa.gov.
To ensure proper consideration of all comments, responders must include the following name and reference number in the text of their comments: Chinook Marina Maintenance Dredging, NWP-2008-472-1.
Encl: Figures
Joint Public Notice
Application for a Department of the Army Permit and
a Washington Department of Ecology Water Quality
Certification and/or Coastal Zone Management
Consistency Concurrence
US Army Corps of Engineers
Regulatory Branch
Post Office Box 2946
Portland, OR 97208-2946
Telephone (503) 808-4386
Attn: Danielle Erb, Project Manager
WA Department of Ecology
SEA Program
Post Office Box 47600
Olympia, WA 98504-7600
Telephone: (360) 407-6068
ATTN: SEA Program,
Federal Permit Coordinator
Public Notice Date: August 22, 2016
Expiration Date: September 21, 2016
Reference No.: NWP-2008-472-1
Chinook Marina Maintenance
Dredging
Interested parties are hereby notified that the U.S. Army Corps of Engineers (Corps) and the Washington
Department of Ecology (Ecology) have received an application to perform work in waters of the U.S. as described
below and shown on the enclosed drawings dated July 2016.
The Corps will review the work in accordance with Section 404 of the Clean Water Act (CWA) and Section 10 of
the Rivers and Harbors Act. Ecology will review the work pursuant to Section 401 of the CWA, with applicable
provisions of State water pollution control laws and the Coastal Zone Management Act.
APPLICANT: Port of Chinook
Attention: Guy Glenn
P.O. Box 185
Chinook, WA 98614
Telephone: (360) 642-3143
AGENT:
BergerABAM
Attention: Carissa Watanabe
210 East 13th Street, Suite 300
Vancouver, WA 98660
Telephone: (360) 823-6102
LOCATION:
Port of Chinook Marina
743 Water Street
Chinook, WA 98614
WORK: The applicant proposes to continue annual maintenance dredging of the existing marina to a depth of -10
feet MLLW in the commercial area, and to -8 feet MLLW in the two recreational areas. Up to 20,000 cubic yards
of sediments would be dredged from an approximate area of 9.7 acres within the marina per dredge event.
Dredging would be accomplished by use of a hydraulic dredge and pipeline. Dredged materials would be placed at
the Port's adjacent upland site for settling prior to discharging back into Baker Bay.
NWS-2008-472-1
PURPOSE:
Remove accumulated sediments to maintain boat access to the marina.
Dredged Material Testing: The proposed dredged material will be evaluated in accordance with the Sediment
Evaluation Framework for the Pacific Northwest (SEF). The interagency Portland Sediment Evaluation Team
(PSET) implements the SEF for the Corps Portland District. The PSET will determine if sediment testing is
required for this project. Project sediments may require physical, chemical, and/or biological testing to support the
permit application evaluation. The PSET will evaluate the applicant's sediment testing results and determine if
project sediments are suitable for unconfined, aquatic disposal or exposure.
The proposed project includes future maintenance dredging. Prior to each maintenance dredging cycle the
applicant would be required to coordinate with the Corps and the PSET to determine if additional sediment testing
is required.
ADDITIONAL INFORMATION: The applicant is requesting a 10-year permit for maintenance dredging.
MITIGATION: The applicant has not proposed compensatory mitigation. The Corps will determine what is
appropriate and practicable compensatory mitigation commensurate with the project impacts.
ENDANGERED SPECIES: The Endangered Species Act (ESA) requires federal agencies to consult with the
National Marine Fisheries Service (NMFS) and/or U.S. Fish and Wildlife Service (USFWS) pursuant to Section 7
of the ESA on all actions that may affect a species listed (or proposed for listing) under the ESA as threatened or
endangered or any designated critical habitat.
After receipt of comments from this public notice, the U.S. Army Corps of Engineers will evaluate the potential
impacts to proposed and/or listed species and their designated critical habitat.
ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management Act, as amended
by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the NMFS on all actions, or
proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat
(EFH). The proposed action would impact EFH in the project area.
If the U.S. Army Corps of Engineers (Corps) determines that the proposed action may adversely affect EFH for
federally managed fisheries in Washington waters, the Corps will initiate EFH consultation with the NMFS. The
Corps' final determination relative to project impacts and the need for mitigation measures is subject to review by
and coordination with the NMFS.
CULTURAL RESOURCES: The Corps has reviewed the latest published version of the National Register of
Historic Places, Washington Information System for Architectural and Archaeological Records Data and other
sources of information. Historic properties are recorded near the proposed project. However, they do not occur in
the permit area. The permit area was created in modern times and there is little likelihood that the proposed project
will impinge on any historic property. The Corps invites responses to this public notice from Native American
Tribes or tribal governments; Federal, State, and local agencies; historical and archeological societies; and other
parties likely to have knowledge of or concerns regarding historic properties and sites of religious and cultural
significance at or near the project area. After receipt of comments from this public notice, the Corps will evaluate
potential impacts and consult with the State Historic Preservation Officer and Native American Tribes in
accordance with Section 106 of the National Historic Preservation Act, as appropriate.
2
NWS-2008-472-1
PUBLIC HEARING: Any person may request, in writing, within the comment period specified in this notice, that
a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the
reasons for holding a public hearing.
EVALUATION CORPS: The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts, of the proposed activity on the public interest. That decision will reflect the
national concern for both protection and utilization of important resources. The benefits, which reasonably may be
expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors
which may be relevant to the proposal will be considered, including the cumulative effects thereof; among those are
conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife
values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water
supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership, and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Native American Nations or tribal governments; Federal, State,
and local agencies and officials; and other interested parties in order to consider and evaluate the impacts of this
activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition
or deny a permit for the work. To make this decision, comments are used to assess impacts on endangered species,
historic properties, water quality, general environmental effects, and the other public interest factors listed above.
Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement
pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public
hearing and to determine the overall public interest of the activity.
The described discharge will be evaluated for compliance with guidelines promulgated by the Environmental
Protection Agency under authority of Section 404(b)(1) of the CWA. These guidelines require an alternatives
analysis for any proposed discharge of dredged or fill material into waters of the United States.
EVALUATION ECOLOGY: Ecology is soliciting comments from the public; Federal, Native American Nations
or tribal governments, State, and local agencies and officials; and other interested parties in order to consider and
evaluate the impacts of this activity. Ecology will be considering all comments to determine whether to certify or
deny certification for the proposed project.
ADDITIONAL EVALUATION: Pacific County has issued an exemption (P1600405) from the requirement of
obtaining a Shorelines Substantial Development permit for this project on August 15, 2016.
COMMENT AND REVIEW PERIOD: Conventional mail or e-mail comments on this public notice will be
accepted and made part of the record and will be considered in determining whether authorizing the work would
not be contrary to the public interest. In order to be accepted, e-mail comments must originate from the author's
e-mail account and must include on the subject line of the e-mail message the permit applicant's name and
reference number as shown below. Either conventional mail or e-mail comments must include the permit
applicant's name and reference number, as shown below, and the commenter's name, address, and phone number.
All comments whether conventional mail or e-mail must reach this office, no later than the expiration date of this
public notice to ensure consideration.
Copies of this public notice which have been mailed or otherwise physically distributed feature project drawings in
black and white. The electronic version features those drawings in color, which we think more accurately
communicates the scope of project impacts. To access the electronic version of this public notice, go to the
Portland District's web page at http://www.nwp.usace.army.mil/ under Regulatory Public Notices. Recently-issued
public notices are listed in chronological order of the date of issuance. Select and view the listing for this project.
3
NWS-2008-472-1
CORPS COMMENTS: All e-mail comments should be sent to Danielle.H.Erb@usace.army.mil
Conventional mail comments should be sent to: U.S. Army Corps of Engineers, Regulatory Branch,
Attention: Danielle Erb, P.O. Box 2946, Portland, OR 97208-2946. All comments received will become part of
the administrative record and are subject to public release under the Freedom of Information Act including any
personally identifiable information such as names, phone numbers, and addresses.
ECOLOGY COMMENTS: Any person desiring to present views on the project pertaining to a request for water
quality certification under Section 401 of the CWA and/or Coastal Zone Management consistency concurrence,
may do so by submitting written comments to the following address: Washington State Department of Ecology,
Attention: Federal Permit Coordinator, Post Office Box 47600, Olympia, Washington 98504-7600, or e-mail to
ecyrefedpermits@ecy.wa.gov.
To ensure proper consideration of all comments, responders must include the following name and reference number
in the text of their comments: Chinook Marina Maintenance Dredging, NWP-2008-472-1.
Encl: Figures
4
Copyright © BergerABAM. All Rights Reserved.
Chinook
_
^
Pacific Ocean
Ilwaco
Baker Bay
West
Sand
Island
East
Sand
Island
Chinook
_
^
Project location
Megler
Q:\Vancouver\2016\A16.0229\00\GIS\02_MXD\Fig1_Vicinity.mxd
Co
lu
mb
ia
R
ive
r
Hammond
Astoria
0
Proposed Project:
Marina Dredged Material Characterization
Applicant:
Port of Chinook
743 Water Street
Chinook, Washington 98614
Figure 1: Vicinity Map
0.5
1
2
3
4
F
5
Miles
Reference #: 2008-472
In: Baker Bay, Columbia River
Near: Chinook
County: Pacific County
State: WA
July 2016
Sheet 1 of 6
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community
Long Beach
(
!
Point of discharge return water
#
*
Outfall
_
^
Tidal Reference Gauge
St
re
et
Upland Disposal Facility
V
al
le
y
Copyright © BergerABAM. All Rights Reserved.
Legend
£
¤
101
Or
St
W
W
Bell Buoy
Seafood
eg
on
at
St
et
re
Entrance
Channel
Haul Out
r
Po
tl
d
an
St
W
#
*
Fuel Dock
Boat Launch
Upland Pipeline
Q:\Vancouver\2016\A16.0229\00\GIS\02_MXD\Fig2_Site.mxd
#
*
Co
lu
mb
ia
Riv
e
St
W
Upland Disposal Facility
(
!
r
0
Proposed Project:
Marina Dredged Material Characterization
Applicant:
Port of Chinook
743 Water Street
Chinook, Washington 98614
ym
Ol
a
pi
Figure 2: Existing Site Plan
50
100
200
300
400
F
500
Feet
Reference #: 2008-472
In: Baker Bay, Columbia River
Near: Chinook
County: Pacific County
State: WA
August 2016
Sheet 2 of 6
Source: Esri, DigitalGlobe, G eoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community
er
^ Boat
_
Tax Parcel
re
e
t
POC = Port of Chinook owned parcel
Va
l
le
y
St
Copyright © BergerABAM. All Rights Reserved.
Legend
101
£
¤
POC
POC
e
Or
W
St
W
e
at
POC
POC
n
go
r
t
09101755481
POC
r
Po
POC
POC
09101755517
POC POC
POC
POC
Q:\Vancouver\2016\A16.0229\00\GIS\02_MXD\Fig3_Taxlot.mxd
pia
St
W
73002009000
POC
POC
POC
ive
r
ym
Ol
POC
POC
POC
ia R
W
POC
POC
mb
St
09101755481
POC
Co
lu
nd
tl a
POC
POC
POC
POC
POC
73002008003
POC
POC
POC
0
Proposed Project:
Marina Dredged Material Characterization
Applicant:
Port of Chinook
743 Water Street
Chinook, Washington 98614
Figure 3: Tax Parcel Map
50
100
200
300
400
F
500
Feet
Reference #: 2008-472
In: Baker Bay, Columbia River
Near: Chinook
County: Pacific County
State: WA
July 2016
Sheet 3 of 6
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community
e
re
POC
St
09101755481
09101755517
Dredge area
Dredge to -10ft elevation
#
*
Outfall
re
et
Bathymetry (MLLW)
St
Copyright © BergerABAM. All Rights Reserved.
Legend
V
al
le
y
0 to -8 ft
-8 and deeper
£
¤
101
EL = Elevation
MLLW = Mean low low water
O
n
go
re
St
W
W
at
er
-6
et
re
-7
St
-4
-5
-4
-5
-6
-7
#
*
-6
-8
-5
r
Po
Dredge to EL -10 ft
-8
-9
-8
-7 -6
-7
Dredge to EL -8 ft
-6
-7
-8
tio
n
Se
c
A
6
Co
lu
mb
ia
Riv
e
#
*
-7
-6
ym
Ol
#
*
r
Proposed Project:
Marina Dredged Material Characterization
a
pi
St
W
-4
0
Applicant:
Port of Chinook
743 Water Street
Chinook, Washington 98614
W
-4
-4
Fig
Q:\Vancouver\2016\A16.0229\00\GIS\02_MXD\Fig6_DredgeSection.mxd
-5
-4
St
-6
-8
-4
-6
-5
tla
nd
Figure 4: Dredge Plan
50
100
200
300
400
F
500
Feet
Reference #: 2008-472
In: Baker Bay, Columbia River
Near: Chinook
County: Pacific County
State: WA
August 2016
Sheet 4 of 6
Source: Esri, DigitalGlobe, G eoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community
Dredge to EL -8 ft
#
*
Copyright © BergerABAM. All Rights Reserved.
Note: Turbidity will be monitored 150-ft radially
from point of dredging activities within the marina.
Legend
Point of discharge return water
(
!
Upland Disposal Facility
Va
lle
yS
et
tr e
Dredge area
Terrestrial noise buffer (315 ft.)
£
¤
101
o
eg
Or
n
S
tW
W
er
St
et
re
r
Po
tl
d
an
St
W
Q:\Vancouver\2016\A16.0229\00\GIS\02_MXD\Fig5_ActionArea.mxd
ym
Ol
Co
lu
mb
ia
Upland
Disposal
Facility
Riv
e
St
W
(
!
r
0
Proposed Project:
Marina Dredged Material Characterization
Applicant:
Port of Chinook
743 Water Street
Chinook, Washington 98614
a
pi
Figure 5: Action Area
50
100
200
300
400
F
500
Feet
Reference #: 2008-472
In: Baker Bay, Columbia River
Near: Chinook
County: Pacific County
State: WA
July 2016
Sheet 5 of 6
Source: Esri, DigitalGlobe, G eoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community
at
Entrance
Channel
Proposed Project:
Marina Dredged Material Characterization
Applicant:
Port of Chinook
743 Water Street
Chinook, Washington 98614
Figure 6: Dredge Section
Reference #: 2008-472
In: Baker Bay, Columbia River
Near: Chinook
County: Pacific County
State: WA
August 2016
Sheet 6 of 6
Source: Esri, DigitalGlobe, G eoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community
Q:\Vancouver\2016\A16.0229\00\GIS\02_MXD\Fig6_DredgeSection.mxd
Copyright © BergerABAM. All Rights Reserved.