The applicant proposes to place approximately 7,341 cubic yards of soil and concrete fill.
Full Public Notice Project Plans
The applicant proposes to place approximately 7,341 cubic yards of soil and concrete fill in 8.91 acres of freshwater wetlands (Scrub-Shrub wetland = 0.30 acre; Forested wetland = 7.20 acres; Emergent wetland = 1.41 acres) and 0.19 acre of freshwater apparent man-made drainage ditches within the project site, totaling 9.10 acres of waters of the U.S., to construct a commercial warehouse/distribution and manufacturing project to serve the shipping industry. The proposed finished grade is +18 feet Mean Sea Level. The facilities would include a 175,135-square-foot facility, and a 450,000-square-foot plastics packaging facility. The project would have close proximity to the Port of Houston Bayport Container Terminal, direct rail service, and the ability to create a new heavy-haul corridor for truck traffic from the facilities to the Bayport Container Terminal in-gate. The industrial development project would offer immediate access to a new heavy-weight, private road between the site and the Bayport Container Terminal in-gate. The applicant has stated the project would not add flow to Pine Gully, and the developer is required to detain water/run-off so the net impact to Pine Gully is no change.