UPGRADES to EXISTING BARGE DOCK in the MISSISSIPPI RIVER in ST. CHARLES PARISH
NAME OF APPLICANT: Archer Daniels Midland (ADM) Grain Company C/O Lanier & Associates Engineers, ATTN: Mr. Price Lanier, at 4101 Magazine Street, New Orleans, Louisiana 70115.
LOCATION OF WORK: On the Mississippi River, approximately 117.6 miles above Head of Passes, on the right descending bank, on LA-18 East, near Ama, in Saint Charles Parish, Louisiana, as shown on the attached drawings.
HUC: 08090100; Lower Mississippi Region
CHARACTER OF WORK: To install three new ship loaders with pile foundations, extending the dock downstream with four new breasting dolphins, two new mooring dolphins, and seventeen new barge monopiles, and the existing transfer tower will be modified and re-supported with new piles and framing members. Furthermore, 12,000 cubic yards of material will be dredged adjacent to the upgraded dock and 1,000 cubic yards of rock material will be placed for revetment repair. The 12,000 cubic yards of dredged material will be deposited beyond the -55’ contour line.