PROPOSED METHANOL PIPELINE IN ASCENSION PARISH

NAME OF APPLICANT: International Matex Tank Terminal, c/o ELOS Environmental, LLC, 43177 East Pleasant Ridge Road, Hammond, LA 70403. LOCATION OF WORK: East and along Highway 75, Sections 11 and 14, T10S-R2E, in Geismar, Louisiana, in Ascension Parish, within the Lake Maurepas Basin in hydrologic unit (HUC 08070204), as shown on the attached drawings (Latitude 30.194303 N, Longitude -91.016059 W). CHARACTER OF WORK: The applicant has requested Department of the Army authorization to clear, grade, excavate and deposit fill to install and maintain a 12-inch methanol pipeline. Horizontal Directional Drilling will be utilized along with trenching and backfilling to install 5,850 linear feet of pipeline. Approximately 2,609 cubic yards will be excavated and backfilled along with approx. 702 cubic yards of sand material to achieve required grade elevation requirements. Any remaining excavated fill material will be hauled off-site for disposal. The proposed project is situated on an approximately 6,000 linear-foot corridor that has been determined to include forested and emergent wetlands and waters of the U.S. Of this, approximately 0.59 acres of emergent wetlands and approx. 1.16 acres of forested wetlands would be directly impacted. The remainder of the property will be left in its natural state. It is anticipated that the proposed action would have minimal impact on adjacent wetlands.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas