The Wilmington District, Corps of Engineers (Corps) has received an application from the North Carolina Department of Transportation (NCDOT) regarding a potential future requirement for Department of the Army (DA) authorization to discharge dredged or fill material into waters of the United States associated with the proposed widening and improvement of 22.2 miles of Interstate 26 (I-26) in Henderson and Buncombe Counties, North Carolina, State Transportation Improvement Program (STIP) Nos. I-4400 and I-4700.

PUBLIC NOTICE - Please download PDF files for proper formatting and completeness.

Issue Date: September 22, 2016

Comment Deadline: October 21, 2016

Corps Action ID #: SAW-2013-01883

STIP Project Nos. I-4400 & I-4700

The Wilmington District, Corps of Engineers (Corps) has received an application from

the North Carolina Department of Transportation (NCDOT) regarding a potential future

requirement for Department of the Army (DA) authorization to discharge dredged or fill

material into waters of the United States associated with the proposed widening and

improvement of 22.2 miles of Interstate 26 (I-26) in Henderson and Buncombe Counties,

North Carolina, State Transportation Improvement Program (STIP) Nos. I-4400 and

I-4700.

Specific alignment alternatives and location information are described below and shown

on the attached maps. This Public Notice and attachments are also available on the

Wilmington District Web Site at http://www.saw.usace.army.mil/Missions/Regulatory-

Permit-Program/Public-Notices/

The Federal Highway Administration’s (FHWA) Draft Environmental Impact Statement

(DEIS) and related maps for this project are available on the NCDOT website at

https://www.ncdot.gov/projects/i26Widening/

Applicant: North Carolina Department of Transportation

Project Development and Environmental Analysis Branch

Philip S. Harris III, P.E., C.P.M., Natural Environment Section Head

1598 Mail Service Center

Raleigh, North Carolina 27699-1598

Authority

The Corps will evaluate this application to compare alternatives that have been carried

forward for detailed study pursuant to applicable procedures of Section 10 of the Rivers

and Harbors Act of 1899 and Section 404 of the Clean Water Act (33 U.S.C. 1344).

In order to more fully integrate Section 10 and Section 404 permit requirements with the

National Environmental Policy Act of 1969, and to give careful consideration to our

required public interest review and 404(b)(1) compliance determination, the Corps is

soliciting public comment on the merits of this proposal and on the alternatives evaluated

in the August 2016, FHWA DEIS ( https://www.ncdot.gov/projects/i26Widening/ ). At

the close of this comment period, the District Commander will evaluate and consider the

comments received, as well as the expected adverse and beneficial effects of the proposed

road construction, to select the least environmentally damaging practicable alternative

(LEDPA). The District Commander is not authorizing construction of the proposed

project at this time. A final DA permit may be issued only after our review process is

complete, impacts to the aquatic environment have been minimized to the maximum

extent practicable, and a compensatory mitigation plan for unavoidable impacts has been

approved.

Location

The project is located in western North Carolina in southeastern Henderson County, just

south of Hendersonville, and continues west to southern Buncombe County, just south of

Asheville. The project corridor is 22.2 miles in length and passes through the Town of

Fletcher and the City of Hendersonville in Henderson County, and the southern portion

of the City of Asheville in Buncombe County (Attachment 1).

This project is included in the 2016 – 2025 STIP as two projects, I‐4400 and I‐4700.

STIP Project I‐4400 is 13.6 miles in length and begins at US 25 (Exit 54) near

Hendersonville and extends along I‐26 west to NC 280 (Exit 40). STIP Project I‐4700 is

8.6 miles in length and extends along I‐26 from NC 280 west to the I‐40/I‐240

interchange. For the remainder of this public notice, STIP Numbers I-4400 and I-4700

will be referred to as “the project.”

I‐26 is a major transportation route in western North Carolina and the southeastern

United States for the movement of both people and goods. I‐26, as a whole, is considered

a west‐to‐east corridor and runs from Kingsport, Tennessee to Charleston, South

Carolina. As noted in the DEIS however, I‐26 generally runs south‐to‐north in the project

area.

The project study area (PSA) boundary for this project generally consists of a 1,400‐foot

wide corridor that follows existing I‐26 from US 25 in Henderson County, north to

I‐40/I‐240 in Buncombe County (Attachments 2-11). The PSA boundary also

encompasses interchanges that are included in this project and the Blue Ridge Parkway

Bridge over I‐26.

Existing Site Conditions

I‐26 is a four‐lane, median‐divided, full control‐of‐access facility between US 25 (Exit

54) in Henderson County and I‐40/I‐240 (Exit 31) in Buncombe County. This section of

I‐26 also carries the US 74 designation. The project area includes eleven existing

grade‐separated crossings and eight existing interchanges. The speed limit varies from 65

miles per hour (mph) in southern Henderson County to 60 mph in northern Henderson

County, into Buncombe County, and up to I‐40/I‐240.

I‐26 interchanges with US 25, which serves the region as a north‐south connection

between Asheville, North Carolina and Greenville, South Carolina, and US 64, which

serves the region as an east‐west connection between I‐77 in Statesville, NC, and I‐75

near Chattanooga, Tennessee. The interchange of I‐26 and I‐40/I‐240 in Buncombe

County forms the center of the region’s transportation system. These two freeways

interconnect the region and carry the highest percentage of trips passing through the area,

while their locations in proximity to populated areas, commercial areas, and the Asheville

Regional Airport also serve a large portion of the local travel demands.

Due to its predominately south to north alignment in the PSA, I‐26 serves south to north

traffic through the region. With limited alternate south to north routes, automobile and

truck‐freight through traffic utilizing I‐26 share the facility with local traffic, creating

several areas of congestion during peak travel periods on I‐26. The I‐26 corridor in the

PSA also experiences a seasonal increase in traffic volume during the summer and fall

months as tourists visit the region for recreational activities and fall foliage viewing.

Current traffic volumes indicate that demand exceeds the available capacity of I‐26 in

Buncombe County (NC 280 [Airport Road] to I‐40/I‐240), with this segment of the

roadway operating at Level of Service (LOS) F. LOS is a qualitative measure used to

describe the operating conditions of a roadway. LOS is generally described in terms of

factors such as speed, travel time, freedom to maneuver, traffic interruptions, driver

comfort and convenience, and safety. LOS is represented by a letter ranking from “A” to

“F”, with “A” representing free flowing conditions and ”F” representing trafficbreakdown

conditions. Below is a visual representation of LOS from the August 2016

FHWA DEIS:

The segment in Henderson County (US 25 to NC 280) is currently operating at an

acceptable LOS D or better. Taking regional population and employment growth into

account, the entire roadway corridor from US 25 to I‐40/I‐240 is projected to operate

over capacity (LOS F) in 2040. According to NCDOT, I‐26 currently carries substantial

traffic volumes and is projected to carry higher traffic volumes in the future; therefore,

the number of congestion‐related crashes is expected to increase. The approximately

23‐mile section of I‐26 from the US 25 interchange in Henderson County to the

I‐40/I‐240 interchange in Buncombe County experienced 2,072 crashes during the

five‐year time period of March 2011 through February 2016. This crash rate is below the

statewide average for similar facility types, when considering total and non‐fatal injury

crash type categories, but above the statewide average for the fatal crash category.

Approximately 66 percent of all crashes occur during the 11 a.m. to 7 p.m. timeframe.

The Blue Ridge Parkway Bridge over I‐26 is included in the PSA for this project; this

bridge is located at Milepost 391.79 on the parkway. An average of 5,000 vehicles per

day use this bridge during the visitor season. There is no direct access to I‐26 from the

parkway.

Land use throughout the PSA is mixed, consisting of large sections of residential areas,

commercial and industrial stretches, and agricultural tracts. Residential areas generally

consist of single family homes on individual parcels or within subdivisions. Commercial

development is largely concentrated near the I‐26 interchanges with US 64, NC 280

(Airport Road), NC 146 (Long Shoals Road), and NC 191 (Brevard Road).

Water resources in the PSA are part of the Broad and French Broad river basins (US

Geological Survey [USGS] Hydrologic Unit Codes [HUC] 03050105 and 06010105).

The French Broad River is a major feature in the region. It bisects Buncombe County and

provides a water source for a large portion of the PSA. Due to the topography of the

region, most other rivers, streams, and creeks flow into the French Broad River. The

Hominy Creek watershed is located in southern Asheville and contains Hominy Creek

and South Hominy Creek. South Hominy Creek, the French Broad River, Clear Creek,

Devils Fork, Bat Fork, Ivy Creek, Mills River, Mud Creek, and Cane Creek are listed on

the NCDWR 2014 Final 303(d) list of impaired waters.

One hundred and seventy‐five (175) perennial and intermittent streams, one hundred and

fifty-eight (158) wetlands, and fourteen (14) ponds were identified in the PSA for this

project. All but three (3) of these streams are designated as cold water streams. The

French Broad River in the PSA is a navigable water under Section 10 of the Rivers and

Harbors Act of 1899.

There are no designated anadromous fish waters or Primary Nursery Areas present in the

PSA. There are no designated High Quality Waters, Outstanding Resource Waters, or

Water Supply Watersheds (WS‐I or WS‐II) within 1.0 mile downstream of the PSA. The

North Carolina 2014 Final 303(d) list of impaired waters (DWR, 2015) includes the

French Broad River, Mud Creek, and Devils Fork; however, none of the streams in the

project corridor are listed for either turbidity or sedimentation. The French Broad River

(Assessment Unit [AU] 6‐(54.75)b) from Mud Creek to NC 146 is listed for fecal

coliform. Mud Creek (AU 6‐55c2) from Clear Creek to Byers Creek is listed for Fish

Community ‐ Fair and Benthos ‐ Fair. Devils Fork (AU 6‐55‐8‐2b) from the first

unnamed tributary west of Howard Gap Road (SR 1006) to Johnson Drainage Ditch is

listed for Benthos ‐ Poor.

Applicant’s Stated Needs and Purpose

Applicant’s stated needs:

• Improve existing and projected roadway capacity deficiencies.

According to NCDOT, sections of I‐26 currently operate at levels of congestion

characterized by unstable travel speeds with a high level of discomfort to the driver. As

projected traffic volumes increase, more sections of I‐26 are projected to operate at

similar levels of congestion. I‐26 is anticipated to operate over capacity by 2040 (design

year), hindering its ability to serve high‐speed regional travel.

• Improve insufficient pavement structure and deteriorating existing road surface

conditions.

The existing I‐26 roadway surface has undergone major rehabilitation twice, most

recently in 2011. During past rehabilitation efforts, NCDOT Divisions 13 and 14 also

replaced slabs and repaired joints. According to NCDOT, the roadway is again showing

signs of deterioration and additional rehabilitation will not be sufficient to provide a

quality roadway because of the lack of depth of remaining concrete. Reconstruction of

I‐26 in the PSA is needed for high‐speed, safe, and efficient travel.

Applicant’s stated purpose:

The purpose of the proposed improvements to I‐26, from US 25 in Henderson County

north to I‐40/I‐240 in Buncombe County, is to reduce congestion, with a goal of

achieving an overall LOS D in the design year (2040), and to improve the pavement

structure. LOS D is the standard performance goal target used by NCDOT for

environmental studies where congestion is one of the needs being addressed.

Project Description

NCDOT proposes to widen and improve a 22.2‐mile segment of I‐26 from US 25 near

Hendersonville to I‐40/I‐240 south of Asheville by addressing (1) existing and projected

roadway capacity deficiencies, and (2) insufficient pavement structure and deteriorating

existing road surface conditions.

Detailed Study Alternatives

The following three (3) Build Alternatives were studied in the DEIS for this project

(Attachments 12-21):

• Build Alternative 1: 6-Lane Widening. The 6-Lane Alternative would widen

I-26 to three lanes in each direction from US 25 to I-40/I-240.

• Build Alternative 2: 8-Lane Widening. The 8-Lane Alternative would widen

I-26 to four lanes in each direction from US 25 to I-40/I-240.

• Build Alternative 3: Hybrid 6/8-Lane Widening. The Hybrid 6/8-Lane

Alternative would widen I-26 to three lanes in each direction between US 25 and

the US 25 (Asheville Highway) interchange and widen I-26 to four lanes in each

direction from the US 25 (Asheville Highway) to the I-40/I-240 interchange.

As detailed in the FHWA DEIS for this project, although all of the Build Alternatives

would reduce congestion and improve pavement structure, the 8‐Lane Widening

Alternative and Hybrid 6/8‐Lane Widening Alternative would both achieve an overall

LOS D in the design year for all freeway segments in the PSA; the 6‐Lane Widening

Alternative would not provide an overall LOS D.

In addition to the three Build Alternatives, a No-Build Alternative was also retained as a

baseline against which the benefits, costs and impacts of the Build Alternatives could be

compared. The No-Build Alternative assumed that the transportation network in the PSA

will continue to develop as called for in the 2040 Long Range Transportation Plan

(LRTP), but without the subject project included. The FHWA and NCDOT determined

that the No-Build Alternative would not meet the project’s purposes.

Because the columns supporting the deck of the Blue Ridge Parkway Bridge over I-26

are spaced in such a way that they do not accommodate widening of the I-26 facility

under any of the three (3) Build Alternatives, NCDOT and FHWA propose to replace the

bridge as part of this project. NCDOT and FHWA have coordinated with the National

Park Service (NPS) in the development and evaluation of bridge replacement options.

Four (4) options (Attachment 22) for realigning the parkway in conjunction with

replacing the existing bridge were investigated in detail. Replacing the bridge on new

alignment south of the current structure (Option 4), was identified as NPS’s Preferred

Option.

The US 25 (Asheville Highway) interchange with I-26 was determined to have

operational issues in the design year (2040) under the No-Build Alternative. In addition,

the 8-Lane Widening Alternative in the base year (2011) and the 6-Lane Widening

Alternative in the design year (2040) had operational deficiencies at the southern ramp

termini where lanes would be added to or dropped from the existing system at the US 25

(Asheville Highway) interchange. Four alternative interchange designs were developed

and evaluated to address these issues. The partial cloverleaf design with a 231-foot loop

radius was recommended for further study in combination with the three I-26 widening

Build Alternatives.

Impacts to waters of the U.S. for each of the three (3) Build Alternatives that were

studied in detail in the DEIS are listed below. These impact estimates were calculated

based on functional slope stake limits plus 40 feet.

Table 1. Stream and Wetland Impacts by Build Alternative

(source – August 2016 FHWA DEIS)

Build Alternative

Stream

Impacts*

(linear feet)

Wetland Impacts* (acres)

6-Lane Widening 21,597 4.8

8-Lane Widening 27,241 8.0

Hybrid 6/8-Lane

Widening 24,650 7.7

*Impacts are based on functional slope stake limits plus 40 feet.

All of the Build Alternatives would have less than 0.1 acre impact to ponds in the PSA.

Based on the information available to date, including the information contained in the

Draft EIS, the FHWA and NCDOT have identified the Hybrid 6/8‐Lane Widening

Alternative as the Preferred Alternative. This alternative would widen I‐26 to three lanes

in each direction between US 25 and the US 25 (Asheville Highway) interchange and

widen I‐26 to four lanes in each direction from the US 25 (Asheville Highway) to the

I‐40/I‐240 interchange. The US 25 (Asheville Highway) partial cloverleaf interchange is

a component of the Preferred Alternative. Additionally, the Blue Ridge Parkway would

be realigned and the bridge carrying it over I‐26 would be replaced as part of this project.

After the Draft EIS comment period ends, the FHWA and NCDOT will review agency

and public comments received, and comments resulting from the public hearing, to

reassess and/or reconfirm selection of the Preferred Alternative.

Cultural Resources

The FHWA is the lead federal agency for this project and, in accordance with Section

106 of the National Historic Preservation Act (NHPA), is the federal agency responsible

for making determinations and requesting concurrence with these determinations from

the North Carolina Historic Preservation Office (HPO). Additionally, if and when

necessary, adverse effects to historic resources will be resolved through execution of a

memorandum of agreement.

Architectural Resources

Nine resources within the PSA were found to be either listed on the National Register of

Historic Places (NRHP) or were considered eligible for listing. The alternatives may

require right of way from some of the resources. At meetings on May 19, 2015, and April

26, 2016, representatives of the NCDOT, FHWA, and HPO reached concurrence on the

effects of the proposed alternatives on these resources.

Table 2. Historic Architecture Assessment of Effects

(source – August 2016 FHWA DEIS)

Property

and Status

Widening

Alternative Effect Finding Reasons

McMurray

House

(Windy Hill)

(HN1904)

DE-Criterion

C

6-Lane &

Hybrid 6/8

Lane

No Adverse

Effect

Access road along west side of property will be

temporarily closed during construction, but does not

impact access to the house.

8-Lane

No Adverse

Effect with

commitments

**4(f)

de minimis

Access road along west side will be permanently closed

and requires removal of a row of recently planted trees.

Noise at the structure predicted to increase by 5

decibels. Access to the house will not be impacted.

NCDOT will contact the property owner to discuss

replanting trees and noise abatement measures such as

storm windows or insulation.

Camp Orr

(Camp

Pinewood)

(HN1905)

DE-Criteria

A&C

6-Lane, 8-

Lane, &

Hybrid 6/8

Lane

No Adverse

Effect **4(f) de

minimis

Some small sections of new right of way required on

east side of interstate to accommodate cut and fill slopes

and the control of access fencing will be relocated as

needed in these areas. Requires some tree removal

along length of property that borders interstate. Some

fill impacts to wetlands adjacent to historic property,

but within NCDOT existing ROW. Does not impact

contributing resource.

Sholtz-

Cantrell

Estate

(HN0059)

DE-Criterion

A

6-Lane, 8-

Lane, &

Hybrid 6/8

Lane

No Effect

No construction work within property boundary.

Viewshed from house will not be impacted.

Hyder Dairy

Farm

(HN1906)

DE-Criteria

A&C

6-Lane, 8-

Lane, &

Hybrid 6/8

Lane

No Adverse

Effect **4(f) de

minimis

Some small sections of new ROW required on both

sides of interstate to accommodate cut and fill slopes

and the Control of Access fencing will be relocated as

needed in these areas. Requires minimal tree removal

along length of property that borders interstate. Does

not impact contributing resources. Viewshed from

house will not be impacted.

Mountain

Sanitarium

(HN1907)

DE-Criteria

A&C

6-Lane, 8-

Lane, &

Hybrid 6/8

Lane

No Effect No construction work within property boundary.

Rugby

Grange

(HN0042)

NR-Criteria

A&C

6-Lane, 8-

Lane, &

Hybrid 6/8

Lane

No Effect

No construction work within property boundary. Some

fill impacts to wetlands adjacent to historic property,

but within NCDOT existing ROW. Viewshed from

house will not be impacted.

Cureton

House

(HN1912)

DE-Criterion

C

6-Lane, 8-

Lane, &

Hybrid 6/8

Lane

Adverse Effect

Tree clearing adjacent to the property will constitute an

adverse visual effect to the property’s setting. Further,

an expected 3 decibel noise increase, resulting in a 68

db(A) noise level in all build alternatives, will constitute

an adverse audible effect.

Table 2. Historic Architecture Assessment of Effects

(source – August 2016 FHWA DEIS)

Property

and Status

Widening

Alternative Effect Finding Reasons

Blue Ridge

Parkway

(NC0001)

DE-Criteria

A&C

6-Lane, 8-

Lane, &

Hybrid 6/8

Lane

Adverse Effect

**4(f)

Bridge carrying Blue Ridge Parkway over I-26 will be

demolished and replaced with a new structure

developed in collaboration with Eastern Federal Lands,

Blue Ridge Parkway, NCDOT, NC-HPO, and FHWA.

Biltmore

Estate

(BN0004)

NR-Criteria

A,B,C,&D

National

Historic

Landmark

6-Lane, 8-

Lane, &

Hybrid 6/8

Lane

No Adverse

Effect **4(f) de

minimis

Some small sections of new ROW required to

accommodate cut and fill slopes and the Control of

Access fencing will be relocated as needed in these

areas. Requires minimal tree removal along length of

property that borders interstate. Some fill impacts to

wetlands adjacent to historic property, but within

NCDOT existing ROW. Does not impact contributing

resources.

**FHWA is using the HPO’s concurrence as a basis for a “de minimis” finding for the following properties, pursuant to Section 4(f):

1. McMurray House (Windy Hill) (HN1904)

2. Camp Orr (Camp Pinewood) (HN1905)

3. Hyder Dairy Farm (HN1906)

4. Biltmore Estate (BN0004)

Section 4(f) of the Department of Transportation Act of 1966

Section 4(f) provides protection to historic properties, public parks, and recreation areas.

All Build Alternatives would result in the Section 4(f) use of the Biltmore Estate, Hyder

Dairy Farm, Camp Orr, Blue Ridge Parkway, and the Mountains to Sea Trail (MST).

The 8-Lane Widening Alternative would also result in the Section 4(f) use of the

McMurray House. Through consultation with the officials with jurisdiction it was

determined that the minor use of the Biltmore Estate, Hyder Dairy Farm, Camp Orr,

McMurray House and Mountains to Sea Trail would result in a de minimis impact.

NCDOT and FHWA will continue to coordinate with the NPS regarding the Blue Ridge

Parkway realignment and bridge replacement.

Archaeological Resources

In a letter dated November 18, 2014, the HPO provided concurrence that no additional

archaeological survey work is required for the subject project. In a memorandum from

the NPS’s Blue Ridge Parkway archaeologist, dated July 22, 2015, it is noted that a

pedestrian survey of the Blue Ridge Parkway Bridge replacement Area of Potential Effect

(APE) was completed by the NPS. Review of known archaeological sites from the North

Carolina Office of State Archaeology (OSA) and the NPS Archaeological Site

Management Information System (ASMIS) resulted in the determination that no known

sites would be impacted by the proposed bridge replacement and realignment of the

parkway.

Endangered Species

The FHWA is the lead federal agency for this project and is the federal agency

responsible for making determinations and requesting concurrence with these

determinations from the U.S. Fish and Wildlife Service, in accordance with Section

7(a)(2) of the Endangered Species Act (ESA). The following table contains the federally

listed threatened and endangered species for Buncombe and Henderson Counties. It also

includes the FHWA’s determinations of effect to these species that would result from

implementation of the Build Alternatives.

Table 3. Federally-listed Threatened and Endangered Species in Henderson

and Buncombe Counties

(source – August 2016 FHWA DEIS)

Scientific Name Common Name Federal

Status

Habitat

Present County Biological

Conclusion

Alasmidonta

raveneliana Appalachian elktoe1 E Yes

Buncombe1

and

Henderson

No Effect

Epioblasma florentina

walkeri (= E. walker) Tan riffleshell1 E Yes Buncombe No Effect

Erimonax monachus Spotfin chub

(=turquoise shiner) 1 T No Buncombe1 No Effect

Geum radiatum Spreading avens E No Buncombe No Effect

Glaucomys sabrinus

coloratus

Carolina northern

flying squirrel E No

Buncombe

and

Henderson

No Effect

Glyptemys

muhlenbergii Bog Turtle T(S/A) Yes

Buncombe

and

Henderson

Not Required2

Gymnoderma lineare Rock gnome lichen E No Buncombe No Effect

Helonias bullata Swamp pink T Yes Henderson No Effect

Isotria medeoloides Small whorled pogonia T Yes Henderson No Effect

Microhexura montivaga Spruce fir moss spider E No Buncombe No Effect

Myotis grisescens Gray bat E Yes Buncombe No Effect

Myotis septentrionalis Northern long-eared bat T Yes

Buncombe

and

Henderson

May Affect Not

Likely to

Adversely

Affect

Sagittaria fasciculata Bunched arrowhead1 E Yes Henderson No Effect

Sarracenia rubra ssp.

jonesii

Mountain sweet pitcher

plant1 E Yes Henderson No Effect

Sisyrinchium

dichotomum White irisette E Yes Henderson No Effect

Table 3. Federally-listed Threatened and Endangered Species in Henderson

and Buncombe Counties

(source – August 2016 FHWA DEIS)

Scientific Name Common Name Federal

Status

Habitat

Present County Biological

Conclusion

Spirea virginiana Virginia spiraea1 T Yes Buncombe1 No Effect

E – Endangered

T – Threatened

T(S/A) – Threatened due to similarity of appearance

1Historic record (the species was last observed in the county more than 50 years ago)

2Species listed as T(S/A) are not biologically endangered or threatened and are not subject to Section 7

consultation and therefore no Biological Conclusion is required.

Evaluation

The decision whether to issue a permit will be based on an evaluation of the probable

impacts, including cumulative impacts, of the proposed activity on the public interest.

That decision will reflect the national concern for both protection and utilization of

important resources. The benefit which reasonably may be expected to accrue from the

proposal must be balanced against its reasonably foreseeable detriments. All factors

which may be relevant to the proposal will be considered including the cumulative effects

thereof; among those are conservation, economics, aesthetics, general environmental

concerns, wetlands, historic properties, fish and wildlife values, flood hazards, flood plain

values (in accordance with Executive Order 11988), land use, navigation, shoreline

erosion and accretion, recreation, water supply and conservation, water quality, energy

needs, safety, food and fiber production, mineral needs, considerations of property

ownership, and, in general, the needs and welfare of the people. For activities involving

the discharge of dredged or fill materials in waters of the United States, the evaluation of

the impact of the activity on the public interest will include application of the

Environmental Protection Agency’s 404(b)(1) guidelines.

Compensatory Mitigation

The purpose of compensatory mitigation is to offset unavoidable functional losses to the

aquatic environment resulting from project impacts to waters of the U.S. According to the

applicant, NCDOT has attempted to avoid impacts to streams and wetlands during

development of the preliminary functional designs for the Build Alternatives. This

included developing alignments and interchange configurations for the Build Alternatives

that avoided these resources as much as possible, while also minimizing impacts to other

resources. NCDOT has also tried to minimize the total impacts to these resources by

considering bridges instead of culverts over some of the larger streams and bridges over

some of the larger and high quality wetlands. NCDOT will continue to seek ways to

avoid and minimize impacts in further design efforts of the selected alternative and will

investigate potential on-site stream and wetland mitigation opportunities for the selected

alternative. If on-site mitigation is not feasible, mitigation will be provided by the North

Carolina Division of Mitigation Services (NCDMS, formerly known as the Ecosystem

Enhancement Program or EEP).

Commenting Information

The Corps of Engineers is soliciting comments from the public; federal, state and local

agencies and officials, including any consolidated State Viewpoint or written position of

the Governor; Indian Tribes and other interested parties in order to consider and evaluate

the impacts of this proposed activity. Any comments received will be considered by the

Corps of Engineers to select the least environmentally damaging practicable alternative

(LEDPA) for this proposal. To make this decision, comments are used to assess impacts

on endangered species, historic properties, water quality, general environmental effects

and the other public interest factors listed above. Comments are used in the preparation of

a Corps of Engineers Environmental Assessment (EA) and/or an Environmental Impact

Statement (EIS) pursuant to the National Environmental Policy Act (NEPA). Comments

are also used to determine the need for a public hearing and to determine the overall

public interest of the proposed activity.

NCDOT will hold a public hearing on this project on Thursday, October 13, beginning

with an open house from 4:00 to 6:30 p.m., followed by a formal presentation at

7:00 p.m. at the Biltmore Baptist Church, 35 Clayton Road in Arden, Buncombe County.

The purpose of this hearing is to provide information about the project and receive public

input. Interested individuals may attend the pre-hearing open house at any time during the

above hours.

NCDOT representatives will display maps and be available to answer questions and

receive comments. Written comments can be submitted at the meeting or later by

November 14, 2016. The formal presentation at 7:00 pm will include an explanation of

the location and design of each widening alternative, the state-federal funding

relationship and right of way procedures. The presentation and comments received will

be recorded and included in the alternative selection and design process. The Corps will

receive a summary of the public comments.

Written comments pertinent to the proposed work will be received by the Corps of

Engineers, Wilmington District, until 5pm, October 21, 2016. Written comments should

be submitted to Ms. Lori Beckwith, US Army Corps of Engineers, Asheville Regulatory

Field Office, 151 Patton Avenue, Room 208, Asheville, NC 28801-5006, telephone 828-

271-7980. Written comments can also be submitted by email to

loretta.a.beckwith@usace.army.mil

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas