Vulcan is proposing to expand mining operation at the existing quarry. . The project will impact 1.22 acres of forested wetlands

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Vulcan is proposing to expand mining operation at the existing quarry. . The project will impact 1.22 acres of forested wetlands, 0.88 acre of emergent wetlands, 0.63 acre of open water, and 440 linear feet of stream channel.Total cumulative impacts for the project are 1.81 acres of forested wetlands, 0.88 acre of emergent wetlands, 0.63 acre of open water and 645 linear feet of stream channel. The applicant indicated that impact have been avoided and minimized by avoiding impacts to the James River and its RPA and Goode Creek. To mitigate for the proposed impacts, the applicant proposed to purchase 3.32 wetland credits from the James River Mitigation Bank and 359 stream credits from the Amelia Environmental Bank.

The District Commander has received a joint application for Federal and State permits as described below: APPLICANT Vulcan Construction Materials 5601 Ironbridge Parkway, Suite 201 Chester, Virginia 23831 WATERWAY AND LOCATION OF THE PROPOSED WORK: The project site is within the existing Vulcan Richmond Quarry located at 1800 Deepwater Terminal Road, in the City of Richmond, Virginia. The project site (Phase III) is adjacent to the previously authorized Phase II, and it drains into the James River. PROPOSED WORK AND PURPOSE: The stated purpose of the project is to expand the overburden storage area for the existing mining operation. The project will impact 1.22 acres of forested wetlands, 0.88 acre of emergent wetlands, 0.63 acre of open water, and 440 linear feet of stream channel. To mitigate for the proposed impacts, the applicant has proposed to purchase wetlands and stream mitigation credits from bank. No compensatory mitigation is proposed for open water impacts. Previous authorized impacts for the mining operation are 0.59 acre of forested wetlands and 205 linear feet of stream channel. Phase III of the project will extend the life time of the quarry for approximately 25 years. Total cumulative impacts for the project are 1.81 acres of forested wetlands, 0.88 acre of emergent wetlands, 0.63 acre of open water and 645 linear feet of stream channel. The applicant indicated that impact have been avoided and minimized by avoiding impacts to the James River and its RPA and Goode Creek. To mitigate for the proposed impacts, the applicant proposed to purchase 3.32 wetland credits from the James River Mitigation Bank and 359 stream credits from the Amelia Environmental Bank. These proposed impacts were previously authorized but not taken prior to the expiration date of the permit. In addition to the required Department of the Army permit, the applicant must obtain a Virginia Water Protection Permit/401 certification from the Virginia Department of Environmental Quality assuring that applicable laws and regulations pertaining to water quality are not violated. Project drawings are attached. AUTHORITY: Permits are required pursuant to Sections 401 and 404 of the Clean Water Act (Public Law 95-217) and Title 62.1 of the Code of Virginia. FEDERAL EVALUATION OF APPLICATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. The decision will reflect the national concern for both protection and utilization of important resources. The benefits which reasonably may be expected from the proposal must be balanced against its reasonably foreseeable detriments. All of the proposal's relevant factors will be considered, including conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, flood plain values, land use classification, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people. The Environmental Protection Agency's "Guidelines for Specification of Disposal Sites for Dredged or Fill Material" will also be applied (Section 404(b)(1) of the Clean Water Act). The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the direct, indirect, and cumulative impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Anyone may request a public hearing to consider this permit application by writing to the District Commander within 30 days of the date of this notice, stating specific reasons for holding the public hearing. The District Commander will then decide if a hearing should be held. Preliminary review indicates that: (l) no environmental impact statement will be required; (2) after conducting the NAO ESA Project Review Process there will be no effect on Federal listed species or their habitat ; and (3) no known properties eligible for inclusion or included in the National Register of Historic Places are in or near the permit area, or would likely be affected by the proposal. Additional information might change any of these findings. For compliance with the Coastal Zone Management Act of 1972, as amended for projects located in Tidewater, the applicant must certify that federally licensed or permitted activities affecting Virginia's coastal uses or resources will be conducted in a manner consistent with the Virginia Coastal Zone Management Program (VCP) and obtain concurrence from the Department of Environmental Quality (DEQ), Office of Environmental Impact Review (OEIR). We have not received a certification from the applicant prior to publication of this public notice. It is the applicant’s responsibility to submit a consistency certification to the Office of Environmental Impact Review for concurrence or objection and proof of concurrence must be submitted to the Corps prior to final permit issuance. A template federal consistency certification can be found here: http://www.deq.virginia.gov/Programs/EnvironmentalImpactReview/FederalConsistencyReviews.aspx#cert . For more information or to obtain a list of the enforceable policies of the VCP, contact the Department of Environmental Quality, Office of Environmental Impact Review at (804) 698-4330 or e-mail: bettina.sullivan@deq.virginia.gov or john.fisher@deq.virginia.gov. COMMENT PERIOD: Comments on this project should be in writing and can be sent by either email to silvia.b.gazzera@usace.army.milor by regular mail, addressed to the Norfolk District, Corps of Engineers (ATTN: CENAO-WR-R), 803 Front Street, Norfolk, Virginia 23510-1011, and should be received by the close of business on October 14, 2016. PRIVACY & CONFIDENTIALITY: Comments and information, including the identity of the submitter, submitted in response to this Public Notice may be disclosed, reproduced, and distributed at the discretion of the U.S. Army Corps of Engineers. Information that is submitted in connection with this Public Notice cannot be maintained as confidential by the U.S. Army Corps of Engineers. Submissions should not include any information that the submitter seeks to preserve as confidential. If you have any questions about this project or the permit process, please contact Dr. Silvia Gazzera at (804) 212-6817 and silvia.b.gazzera@usace.army.mil

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice