18-INCH PIPELINE IN ASSUMPTION, LAFOURCHE, AND ST. JAMES PARISHES
NAME OF APPLICANT: Texas Brine Company, LLC, c/o Joel Miller, 601 Main Street, Franklin, Louisiana 70538.
LOCATION OF WORK: Within the Terrebonne and Barataria Basins, in the West Central Louisiana Coastal hydrologic unit (HUC 08090302) and the East Central Louisiana Basin hydrologic unit (HUC 08090301), beginning at 29.825°N, 90.91344°W, crossing Bayou Lafourche, Bayou Petit Chackbay, Bayou Verret, Bayou Citamon and terminating at 29.99687°N, 90.887203°W, in Assumption, Lafourche, and St. James Parishes, as shown on the enclosed drawings.
CHARACTER OF WORK: The applicant has requested authorization to replace 64,548 linear feet of 14-inch brine pipeline with an 18-inch pipeline. The proposed pipeline will be installed parallel to the existing 14-inch pipeline, which will be removed after the 18-inch pipeline is operational. Horizontal directional drill (HDD) will be utilized to install the proposed pipeline beneath existing roads, pipelines, and waterways, including Bayou Lafourche, Bayou Verret, and Bayou Citamon. The remaining length will be installed via open cut trench. All work will take place within a 55-foot temporary right-of-way. A 10-foot permanent right-of way will be maintained.
The applicant has minimized the proposed impacts by expanding existing pipeline rights-of-way, utilizing HDD methods for water crossings, and reducing the right-of way width as much as practicable without compromising safety. Best management practices will be implemented during construction to minimize impacts to adjacent wetlands. As a result of pipeline installation, approximately 4.5 acres of bottomland hardwood forests and 19.4 acres of cypress-tupelo forests, 39.1 acres of emergent wetlands, 0.4 acre of navigable waters, and 0.3 acre of waters of the US will be impacted by the proposed activity. As compensation for unavoidable wetland impacts the applicant proposes to purchase wetland credits from a Corps approved mitigation bank located in the watershed.