Home

New England District

Run scraper

The Town of Scituate

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The Town of Scituate, MA has submitted an application to conduct work at North Scituate Beach

The Town of Scituate, MA has submitted an application to conduct work at North Scituate Beach located on Glades Road. The work involves placement of fill material below the high tide line in order to construct the North Scituate Beach Nourishment Project. The majority of the project area is protected by a concrete seawall fronted by an armor stone revetment and requires approximately 240,000 cubic yards of fill material.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas