Interested parties are hereby notified that an application has been received to modify a Department of the Army permit, NWW-0-48760, issued on March 30, 1992, for certain additional work in waters of the United States, including wetlands. The purpose of the proposed project is to improve power plant functions and efficiency by narrowing a section of the power canal to match the original design width.
Interested parties are hereby notified that an application has been received to modify a Department of the Army permit, NWW-0-48760, issued on March 30, 1992, for certain additional work in waters of the United States, including wetlands, as described below in the attached documents:
• Project_Figures_(2016)_NWW-0-48760
APPLICANT: Innergex, 1111 Saint-Charles St. W. East Tower, Suite 1255, Longueuil, Quebec, J4K5G4; Point of Contact Mr. Samuel Franklyn, (450) 928-2550
U.S. ARMY CORPS OF ENGINEERS PROJECT MANAGER: Christen Marve Griffith, (208) 433-4470, christen.m.griffith@usace.army.mil
PURPOSE: The purpose of the proposed project is to improve power plant functions and efficiency by narrowing a section of the power canal to match the original design width. The current width results in higher than normal accumulation of sediment within the reach of the power canal, limiting efficiency and increasing maintenance.
WATERWAY: Horseshoe Bend Hydroelectric Power Canal
LOCATION: The proposed project would be located on the Horseshoe Bend Hydroelectric Power Canal, within Section 28, Township 7 North, Range 2 East, near latitude 43.910º N and longitude –116.230º W, in Boise County, near Horseshoe Bend, Idaho.
DRIVING DIRECTIONS: From the intersection of Highway 55 and Highway 52 in Horseshoe Bend, Idaho, drive approximately 1.9 miles west on Highway 52 to the project location.
AUTHORITY: This permit will be issued or denied under the authority of Section 404 of the Clean Water Act (33 U.S.C. 1344). A Department of the Army permit is required for the discharge of dredged or fill material into waters of the United States, including wetlands.
WORK: The proposed project will result in the discharge of 7200 cubic yards of gravel, rock, and stone to construct a 950 linear foot levee within the existing canal, as shown in Figures 2 and 3. After construction of the levee, the area between the levee and the existing north bank of the power canal will be filled with roughly 39,650 cubic yards of sand, dredged from the power canal for maintenance. A total of 46,850 cubic yards of fill material will be discharged within approximately 2.5 acres of open water and 0.05 acres of emergent wetlands of the Horseshoe Bend Hydroelectric Power Canal, a waters of the United States. The work will entail; the dewatering of the Canal, the excavation of soft sediments from the footprint of the proposed levee, the construction of the levee, and the re-watering of the canal for operation.
ADDITIONAL INFORMATION: The power canal was originally constructed around 1900 and went into operation in 1902. A small hydroelectric plant operated until 1954 when it was closed. Horseshoe Bend Hydroelectric Company acquired the FERC License and reconstructed the power canal between 1993 and 1995 following roughly the same alignment. The project reach was however over excavated resulting in a reach that varies from 150 to 370 feet wide. The design width is closer to 150 feet wide. The plant was commissioned in 1995 and Innergex acquired the plant in 2004.
The wider cross section causes slower water velocities and results in higher than normal accumulation of sediments within this reach of the power canal. Overtime, the buildup of sediment restricts flows and reduces the volume of water downstream at the power house, affecting generation efficiency. Narrowing the power canal at this location would maintain higher flows, reduce accumulation of sediment, reduce maintenance dredging, and increase plant efficiency. There will be no fueling of equipment within the watery, and all equipment will arrive on site clean to avoid spreading invasive weeds in the area.
CONSTRUCTION PERIOD: Applicant proposes to start construction December 15, 2016 through February 1, 2017. The permit would authorize construction for a period of three years.
PROPOSED MITIGATION: The applicant proposed no mitigation for the proposed project. The proposed project would be solely within the constructed canal. Wetland that occurred along the bank of the existing alignment are anticipated to return along the newly constructed bank, due to similar conditions.
OTHER ENVIRONMENTAL DOCUMENTS AND DA PERMITS ISSUED TO APPLICANT: Other permits issued to Innergex, formally Horseshoe Bend Hydroelectric Company, include:
• Standard Permit NWW-0-48760 issued on March 30, 1992
WATER QUALITY CERTIFICATION: This notice will also serve as a Public Notice that the Idaho Department of Environmental Quality (IDEQ) is evaluating whether to certify that the discharge of dredge and/or fill material proposed for this project will not violate existing water quality standards. A Department of the Army permit will not be issued until water quality certification has been issued or waived by the IDEQ, as required by Section 401 of the Clean Water Act. If water quality certification is not issued, waived or denied within sixty (60) days of this public notice date, and an extension of this period is not requested by and granted to the IDEQ, certification will be considered waived. Additionally, within thirty (30) days of this Public Notice, any person may provide written comments to IDEQ, as request in writing that IDEQ provide them notice of their preliminary 401 Certification decision. Comments concerning Water Quality Certification for this project should be mailed to: Idaho Department of Environmental Quality, Boise Regional Office, 1445 N. Orchard Street, Boise, Idaho 83706.
AQUATIC RESOURCE DESCRIPTION: The existing power canal is approximately 3.25 miles long, starts at a diversion at Horseshoe Bend, Idaho and flows in a westerly direction to the power plant. The canal averages 150 feet in width throughout much of its length except at the project site where it widens out to near 370 feet. Sections of the canal are lined, but not at the project site. Bank slopes are steep and support little vegetation. An emergent wetland fringe approximately 2 feet in width has developed along the bank of the existing canal totaling 0.05 acres of emergent wetlands within the project area.
ANTICIPATED IMPACTS ON AQUATIC ENVIRONMENT: The proposed project would impact an estimated 2.5 acres of open water and 0.05 acres of emergent wetland.
OTHER AUTHORIZATIONS: The proposed project requires a Section 401 Individual Water Quality Certification from the Idaho Department of Environmental Quality.
CULTURAL RESOURCES: Coordination is currently being conducted with the office of the Idaho State Historic Preservation Officer to determine if this activity will affect a site that is listed on the National Register of Historic Places, or a site that may be eligible for listing on the Register. We are also coordinating with the appropriate Tribal entity or the Tribal Historic Preservation Offices for the Shoshone Paiute, and the Shoshone Bannock Tribes, to determine if there are any tribal historic or cultural interests within the project area.
TRIBAL TREATY RIGHTS and INTERESTS: Federal agencies acknowledge the federal trust responsibility arising from treaties, statues, executive orders and the historical relations between the United States and American Indian Tribes. The federal government has a unique trust relationship with federally recognized American Indian Tribes, including the Shoshone Paiute, and the Shoshone Bannock. The Corps has a responsibility and obligation to consider and consult on potential effects to Tribal rights, uses and interests. The Corps further recognizes there may be a need for additional and on-going consultation.
ENDANGERED SPECIES: No listed threatened or endangered species or designated critical habitats are known to exist in the project area. Coordination is currently being conducted with the U.S. Fish and Wildlife Service (USFWS) to determine if the activity will have any effect on species designated as endangered or threatened under the Endangered Species Act, or their critical habitat, under the Endangered Species Act of 1973
ENVIRONMENTAL IMPACT STATEMENT: Preliminary review indicates the proposed activities will not require preparation of an Environmental Impact Statement. Comments provided will be considered in preparation of an Environmental Assessment.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact, including cumulative impacts, of the proposed activity on the public interest. This decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered, including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and in general, the needs and welfare of the people. In addition, our evaluation will include application of the EPA Guidelines (40 CFR 230) as required by Section 404(b)(1) of the Clean Water Act.
CONSIDERATION OF PUBLIC COMMENTS: The Corps of Engineers is soliciting comments from the general public; Federal, State and local agencies and officials, Tribal entities and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
PUBLIC HEARING: Any person may request in writing, within the comment period specified in this notice, that a public hearing be held to consider this proposed activity. Requests for a public hearing shall state specific reasons for holding a public hearing. A request may be denied if substantive reasons for holding a hearing are not provided or if there is otherwise no valid interest to be served.
COMMENT & REVIEW PERIOD: Interested parties are invited to provide comments on the proposed activity, which will become a part of the record and will be considered in the final decision.
Please mail all comments to:
U.S. Army Corps of Engineers
Walla Walla District
Christen Marve Griffith
Boise Regulatory Office
720 Park Boulevard, Suite 245
Boise, Idaho 83712-7757
christen.m.griffith@usace.army.mil
Comments should be received no later than the comment due date of November 14, 2016, as indicated on this notice, to receive consideration.
Christen Marve Griffith
Project Manager
Walla Walla District
Enclosures:
Application Drawings