Margaret Chang is the Regulatory point-of-contact for this permit application from Harbor 1 LLC to conduct work impacting the Columbia River at River Mile 108.4 in Portland, Multnomah County, Oregon.
PUBLIC NOTICE
Application for Permit
Issue Date: October 14, 2016
Expiration Date: November 14, 2016
US Army Corps of Engineers No: NWP-2016-199
30-Day Notice Oregon Department of State Lands No: 59085-RF
Interested parties are hereby notified the U.S. Army Corps of Engineers, Portland District (Corps) has received an application for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plans. The Corps is soliciting comments on the proposed work.
Applicant:Harbor 1 LLC
Attention: Milton O. Brown
9320 NE Hwy 99
Vancouver, WA 98665
Email: mobinv@comcast.net
Telephone: (360) 574-6255
Applicant’s Agent:Harbor 1 LLC
Attention: Kathy Harrison
9320 NE Hwy 99
Vancouver, WA 98665
Email: kharrison@mobinv.net
Telephone: (360) 566-8192 ext. 20
Location: The project site is located at One Harbor Marina, 3307 NE Marine Drive, Portland, Oregon. The site is in Section 1, Township 1 North, Range 1 East.
Latitude and Longitude: 45.6005 North, 122.63108 West
Waterway: The project is located on the Columbia River at River Mile 108.4.
Project Purpose: The project purpose is to maintain design depth in the marina.
Project Description: The proposed project is to conduct maintenance dredging of the Harbor One Marina and conduct in-water placement of dredged material. Approximately 21,500 cubic yards (CY) of material will be dredged over a five year period. Dredging would occur to a maximum depth of -8 feet (ft) Columbia River Datum (CRD) in an area of approximately 175,150 square feet (4.02 acres). Dredged material will be placed at two designated in-water placement sites in the Columbia River approximately 1,000 to 2,000 ft to the northeast of the dredge area. The site of the proposed disposal area is at a depth of approximately -22 ft CRD or deeper. The disposal site is located on the outside edge of the navigation channel.
Dredging would be conducted using a 10-inch or 12-inch cutter head suction dredge operated from a floating barge. The dredge slurry would be transported to the proposed disposal site within the Columbia River, using a floating pipeline. The pipeline would be anchored in position in multiple locations and would be clearly marked to identify navigational hazards to other river users. The discharge end of the pipe would be attached to a small anchored barge or pontoon and placed about three to five feet above the river bottom.
Dredging is proposed to take place between November 1 and December 31. The project will take approximately 70 days to complete. The marina currently contains 264 slips, no additional slips will be added with the proposed work. Hydrographic surveys will be performed by the applicant of both the dredging and the in-water placement areas prior to and after dredging to confirm and verify dredged depths and accurate placement of dredged material.
Dredged Material Testing: The proposed dredged material will be evaluated in accordance with the Sediment Evaluation Framework for the Pacific Northwest (SEF). The interagency Portland Sediment Evaluation Team (PSET) implements the SEF for the Corps Portland District. The PSET will determine if sediment testing is required for this project. Project sediments may require physical, chemical, and/or biological testing to support the permit application evaluation. The PSET will evaluate the applicant’s sediment testing results and determine if project sediments are suitable for unconfined, aquatic disposal or exposure.
The proposed project includes future maintenance dredging. Prior to each maintenance dredging cycle the applicant would be required to coordinate with the Corps and the PSET to determine if additional sediment testing is required.
Mitigation: The applicant proposes to avoid and minimize impacts from the project by conducting work within the November 1 to December 31 in-water work window and implement construction best management practices to limit turbidity such as deployment of silt curtains and controlled cutter head operation.
The applicant did not propose compensatory mitigation in the permit application. The Corps will determine the type and amount of compensatory mitigation necessary to offset environmental losses from the proposed project.
Drawings: Nine (9) drawings are attached and labeled Corps No. NWP-2016-199. Copies of this public notice have been mailed or otherwise physically distributed. To access the electronic version of this public notice, go to the Portland District website at http://www.nwp.usace.army.mil/ and select Regulatory Branch Permit Information. At the Regulatory page select Regulatory Public Notices.
Authority: The proposed project will be evaluated under the following:
Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting navigable waters of the United States.
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.
Clean Water Act Section 404(b)(1) Guidelines: The described discharge will be evaluated for compliance with guidelines promulgated by the U.S. Environmental Protection Agency under authority of Section 404(b)(1) of the Clean Water Act. The 404(b)(1) Guidelines are the substantive criteria used in evaluating discharges of dredged or fill material into waters of the United States. The source of the fill material would be the material dredged from the Harbor One Marina.
Water Quality Certification: Section 401 of the Clean Water Act (33 U.S.C. 1341) requires applicants to obtain a water quality certification for proposed discharges into waters of the United States. A permit for the described work will not be issued until certification has been issued or is waived from the certifying state. Attached is the state's notice for a water quality certification.
Endangered Species: Section 7 of the Endangered Species Act (ESA) (16 U.S.C 1536) requires federal agencies to consult with the National Marine Fisheries Service (NMFS) and/or U.S. Fish and Wildlife Service (USFWS) on all actions that may affect a species listed (or proposed for listing) under the ESA as threatened or endangered or that may adversely modify designated critical habitat. The Corps’ preliminary review indicates the described activity may affect an endangered or threatened species or designated critical habitat. The Corps will initiate consultation under Section 7 of the ESA. The Corps will complete the required consultation prior to finalizing a permit decision.
Essential Fish Habitat: Section 305(b)(2) of the Magnuson-Stevens Fishery Conservation and Management Act (MSA) as amended (16 U.S.C 1855), requires Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH). The Corps’ preliminary review indicates the described activity would adversely affect EFH at the project location or in the vicinity. The Corps will initiate consultation under Section 305(b)(2) of the MSA. The Corps will complete the required consultation prior to finalizing a permit decision.
Historic Properties/Cultural Resources: Section 106 of the National Historic Preservation Act of 1966, as amended (16 U.S.C. 470), requires Federal agencies to consult with the appropriate State and/or Tribal Historic Preservation Officer to take into account the effects of actions they undertake or permit on historic properties listed in or eligible for listing in the National Register of Historic Places. The Corps’ preliminary review indicates the described activity is not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places. The permit area has been so extensively modified by modern development that little likelihood exists for the proposed project to affect an undisturbed historic property or any other type of cultural resource.
This notice has been provided to the State Historic Preservation Office (SHPO), interested Native American Indian Tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps’ project manager identified at the end of this notice to assist in a complete evaluation of potential effects.
State and Local Authorizations: It is unknown if the applicant has applied for additional state and local authorizations.
Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact, including cumulative impacts, of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of the proposed project. Comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing.
Submitting Comments: Interested parties are invited to provide comments on the proposed project. Comments may be submitted by conventional mail or email. All comments received will be considered in determining whether authorizing the work would be contrary to the public interest.
Either conventional mail or e-mail comments must include the Corps reference number as shown on page 1 and include the commenter’s name and address. In order to be accepted, e-mail comments must originate from the author’s e-mail account and must include on the subject line of the e-mail message the Corps reference number. All comments received will become part of the administrative record and are subject to public release under the Freedom of Information Act including any personally identifiable information such as names, phone numbers, and addresses.
Additional information about the proposed project may be obtained from the Corps Project Manager listed below. All comments, whether by conventional mail or email, must be received no later than the expiration date of this public notice to ensure consideration. Comments should be submitted to the following mailing address or email address:
U.S. Army Corps of Engineers
Regulatory Branch
Margaret Chang
P.O. 2946
Portland, Oregon 97208-2946
Email: Margaret.Chang@usace.army.mil
Telephone: (503)808-4041
PUBLIC NOTICE
Oregon Department of Environmental Quality (DEQ)
Water Quality 401 Certification
Notice Issued: October 14, 2016
Written Comments Due: November 14, 2016
Corps of Engineers No: NWP-2016-199
Oregon Department of State Lands No: 59085-RF
WHO IS THE APPLICANT: Harbor 1 LLC, Attn: Milton O. Brown
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers public notice.
WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the proposed project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for Federal permits or licenses to provide the Federal agency a water quality certification from the State of Oregon if the proposed activity may result in a discharge to waters of the state.
DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice on the proposed project.
WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a result of the proposal are available for examination and copying at Oregon Department of Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region,
700 NE Multnomah Street, Suite 600, Portland, Oregon 97232. Other project materials are available by contacting the Corps per the attached public notice.
Scheduling an appointment will ensure that water quality documents are readily accessible during your visit. To schedule an appointment please call DEQ Water Quality at Northwest Region at (503) 229-5263.
Any questions on the water quality certification process may be addressed to the 401 Program Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People with hearing impairments may call the Oregon Telecommunications Relay Service at 1-800-735-2900.
PUBLIC PARTICIPATION:
Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that “The Corps provides public notice of and opportunity to comment on the applications, including the application for certification, provided that the department (DEQ), in its discretion, may provide additional opportunity for public comment, including public hearing.”
Written comments:Written comments on project elements related to water quality must be received at the Oregon Department of Environmental Quality by 5 p.m. on the date specified in the upper right section on page one of this notice. Written comments may be emailed, mailed or faxed as described below:
Email - 401publiccomments@deq.state.or.us
Mail - Oregon Department of Environmental Quality, Northwest Region
700 NE Multnomah Street, Suite 600
Portland, Oregon 97232
Attn: 401 Water Quality Certification Coordinator
Fax - (503) 229-6957
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public comment period. Following this review, certification of the proposal may be issued as proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you submit comments during the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at the above address.
ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at (503) 229-5317 or toll free within Oregon at 1-800-452-4011 to request an alternate format. People with a hearing impairment can receive help by calling the Oregon Telecommunications Relay Service at 1-800-735-2900.
.
r,
: ~-;_ '
··:Disposal
·.
'
D!!-::>·H-ll I!> ~ ~
0 D~owlA ru
, ' l::J
.....
·.
....
'
,·
'
VANCOWER
..
PrJ:!,Jii
·.
'
I
.
"""'
· ~o -
'1
.- ~
1
'
-..
' ""-
-....
PORTLAND_
! L ~- ~NTERNATioi~r
73"1 C ·~ ~ -~AIRPO~-~~
i
i
l
'\
Fe.e-t
0
~60
1.100
2.200
3.ZOO
4,400
Harbor 1 LLC, Portland OR. Maintenance Dredging.
Vicinity Map, August 29, 2016.
NWP-2016-199
Page 1/9
I
'
· - 10 -
\
Ir
Enclosure
-
_D
0£.~osatP\)e
Dl&?osalAN!i
0Prlom
Feet
0
·185
370
740
1.110
1,480
Figure 4. Project site {dredging prism and disposal sites), pipeline locations located on a NOAA
Navigation Chart.
Harbor 1 LLC, Portland OR. Maintenance Dredging.
Vicinity Map, August 29, 2016.
NWP-2016-199
Page 2/9
Enclosure
~
~
;::
11
Cept'I
i;::
...
,t
~
lf~t C."i.0)
Ol:'~O~ I
P\) e
Cil3nne1
(N.JY~}at~ n 3f)
c:J O~;)OWAtel
c::J
Prl6m
Harbor 1 LLC, Portland OR. Maintenance Dredging. Vicinity Map, August 29, 2016.
NWP-2016-199
Page 3/9
Enclosure
!
t
~
·o
.,
......~~;;.,;;;;;;;~
c.;;...;:,..._;.~..;;;....:....
Harbor 1 LLC, Portland OR. Maintenance Dredging. Dredging Prism, August 29, 2016.
NWP-2016-199
Page 4/9
Enclosure
t~
~
I
I
I
I
1--
i
1
I
I
I
_.--,..
I
I
J
..
__ _
,,---"
I
... -.....
-... ..,
'··
I· -
--
Tra[\sect A.
I
I.
'
.
.L.............-....................
. mr ;;
l> .
. .
'
'I
I
-< ··:
,'
..
/'
..,,.
·'
·-... ,,. .......
-_....... ----:
.
.-
·r
"'·':.:. _.,.-
.
- ___,-- .
'
. .---.
:'
......- ~
>
~··'
'
b
I
i
I
·
,_,
I
i
_
'
'.
-..... .
''
..... . .- :
............
·::i
c
, ·
(
'
'~ I
,
t
._. _. #
'· · ' ' '
·
'
' , (
I
:
(
-
..
'!l::;f' ·
. -... .,. . .,. '··,·-: '-"'"':(:: :
·
,/ '
...
,
''
.....'.
;' ..'}
'
~
(
'
. .·' /
(
-· - . . . . _ , _
L
. : ',
~ '~" '':I;·
' ··~
1, ._cl·· ._.· , · · · .
~····-······u.)·~·
... ....
_,. ·. -- ---- ·.. _.---..
'
r
t
1
/
,'
/ : : ,,:
,)
"'*-;.'
.... ..' ·
:
,-
'
-,~··
'
~'
,,
r/
'
. . ..=-· Oj
/
J
- ' '; ,
, ..· /:
,
.,,~: :·.c
'
~
'·
I
I
11
!
I
1
·
,
'
\
1
11
t
J
I t
I/
rt
~
"" I I
I I
,· t , , ,' , : ~ :
'
,'
·
"'
r
r
1
I
'"'
" ; l 1~ :
\
"'
,'-- ,' , ·. : : ; r .
· --·~
I
~
~· '
' :1 1 .. ,-., .~..,·~
'
'
..~ ~.. ·
·/ '' ,' , , ' ,,/ .. ,
/,
.. ,;~-trti
..,, .
. '·
" :, , .~..· .fa
""'
. .,,.,
I
~·
.: ~
I
''
' C'\.
/ ,' / .... ..;..,,;./ ! . /:'f'">:i·
:" .· J
"""'~\,
~ I
~
1
I
f
'
. ~ ~ :r?:'.''
\
I I
1.
\ ..
\
'
I
" ... . . .
,
,;·
I
I
I
-- ---- Contours
--·-· Shoreline
.......
Boat House
: · · ·· ; Prism 062716
Docks
c:::==:J Boat House
Survey Complete in July 2016 with
dGPS ·and, lead:1fnes. Tidal adjusted,.......,
to Columbla·Rfver Batum (Feet)
LJRamps
__,.
Feet
c=J 'Nin9.Docks
0
37.5
75
150
225
Harbor 1 LLC, Portland OR. Maintenance Dredging. Existing Depths, August 29, 2016.
NWP-2016-199
Page 5/9
Enclosure
300 11
~@z
"'
.----...----
I
I
I
i'
1
~·
~:72 l'" ·.-·
· · · I 1. 1
' ·
.1
·,
E ', ~
I
I
I
I
II
'"
·
·
.
·
,
"" :·:. ·m¥a.
··!m11u
.;.
11 111 ..._
-~-
I
~
I
\
'
I'
r
.I
i
'
..L
T
t
r
-4
1
: ·-
.. ....
I,
l
I
I
I
· '-,
.:
·
· -···- ·
H'
11.: 11
f ' ) ;:lnniu-; A
: "··-·. .
:.· ~ ~ l
l
1e
:~ ~~
fi . ' . ' '', .. q,
I-"
·ap,1, :· ' : ' -~ /
' :' -. 7 '; j fl'"rt " "iC'.-,._
.
v_
,
,
,, ..
~ ~--- ij DT -~~Gj~~·~~::jut·:~~,~:·~~:_ i_'_·__ ~· -- -..~:___· --~J ~~.· :~~.:~· ~ .0.,:, i·~. ~, i <:>'fill;~
~·,,1··:.~
; ,· .
1
.- , 1
8
,.·
11
__.-u·-.. -------
: :; ' .·
I
' :. ~
,
:
'
i
,.... ,
,-·,_,
·:
11
i
I
· "·
'
0
,,
···
- .
..........
I
:·
......... ...
·---.
;
,
'I
! ... ..,
·
· ·.
... :
..
~·
l
.
(\J
~
-
.. ..
..·
·~ 1··.:.;.' 1 ··,:·
.' ".':\\:~~,:~'-;
1
"""" «.:""" '" "'~&
'
' ;; :
,,
,1
,
'
·
' .
',
'..'
'
; · '·
,'
·
·
·
.
, ' ' ; .:
~~ ~
; ', '. ·, :: \ \
O
0
'
t :. ". ' j'' · Lr1·
'·...
L
,
,
' ' .
· · , ·· · ,· · , · · · " '
.' ·
'
I
I
I
~
------ Cooto1.1ra
--·-· Shoreline
Ii
Boat House
.,,,,· Ptis.m 062716
Ooc1k s
Boat House
L J Ramps
L J WingOocKs
I
Harbor 1 LLC, Portland OR.
Maintenance Dredging.
Dredge Footprint, August 29, 2016.
NWP-2016-199
ICJ
'
)
'
'
:.~-· ~·
~:..,.. q,. ' ·~·:' .'
... J'\ ' \·-. :. 1··i ··;. I;IF
·, ·: ·' ; -~
,·
:<:f"
·,
/f . ', ~'./:91:
L·i
··
' '!
·~
~·
'
,. .... ,':
· · .:
...../ . .. ·"/
,. : '
' .
· ·::~.~(!)·~
.~
·
u : ~ J..· .· .:·:::..
: ' ·'" :'.:'/ ~· !j '..:--...
'
'
~
' '
', ,, · '·J ,
I
I
'
\
\
·i f .·: ·: 1· ._ .
I
:
I
1.
:·
;
:
I
'
·'
'
'
·
,
\.
,
'
··
I
I ' ·;
· 1·,·
I
j
·
'. ·,
J
I ,1
'. "
'
~·/,~,
',. '
' ', \;· ........
~
J
.......
.....
·
..................
I
' <;µ.,' ,' ;'.:.;-- · -.
__, ·' ,.- .· ,·. , / ,
·
,
- -
:·
J..> ; / ,/ ~·,;:-::: : :
· :
. _ ·· .,·
: ·~
.......
'~ I
' ... ·. "'· : 1. \~/
··········;·
·O·o···········T"
~ ~ '~!..
.. ·: O···o '.~a··
, ·······iaOo···OOOO· ·· ·i······oooo,oooe····················· ·· ····· ··i··o··· ··o ~:
- - .. __ ,.-
· .
:
i'
I
,- -- ·:
.......... ,· .. ,....J...- 1......:
,
, .
··. :
." '
.
'
.,
1-- ' i
-. . .
·-,
·._::·
_,...
--------1-. ------ ........... ..... , __ ,_.
,_
;
: -...........
----- -----.. ___ __, - -- ,
ourer B
i
,
·~:"',<1>.,
!\. ".,"
.....- / .· ' ' ;/?
Olirer A
I
'-'1;
. .
.
I
I
· \-.:··............~:··::::::·:::::-·::···z···::· :.
o
·-. --- ~-:---- ···--1·-'·--
lnn'·e r B ·' :·,/·,
("ii
11
···1
1
'
·
', . ..--· ..
1
_ ____ - --
/ ': l :·--.._____,,................_. _
: ··
:
!
D
---
.,,
,.
I
·
\II .··i ..,
i
.
I/
I
('(!)
~llr---
'
'
r7~n~~~~~mm~~~~n~~~~~~~~~~~~~~~-~~-~~-~~~~~~---~~~~~-~' '
:·· ... ; ~~i·
.:
!
I'
I
.1!JSi'
J'
l
l
·11 jJ' ' " .... .... ;. '· ' 1
~,..z/ U. :-J / ]{ JI._:· __,; II ·tr..-' II · If,.~
· ' ~'-1 1
I
-----------
·
"'
'' ··' "·'
1
DD ~ ~ ~
[
-
t
ol1~
SuNey complete in July 2016 with
dGPS and lead lines. Tidal adjusted
to Columbia River· Datum (Feet)
I
0
Page 6/9
~
Feet
37.5
75
150
225
Enclosure
3001
~@/
Vi . . . ·
-....... ,.
Transect
' ... __
Maximum
Dredging
····- -Depth :~/
..
_. ......., ----
·'
.";~!'.
..
;,,
.......................
_
-
~
Ma~rriium,
!
I
~e~giRg
··--·-··'
I
Depth -6
, 1,
·j ;
..
fI
, ,. - '
.
~
· / -·:
.--·-
·'
~-
I
I
~
·
I
.-
I
i
I
'
,
'
........ -...
-.. .....
"M;i.:kimu
!
I
.
-~
Dredging
I
I
......
I
I
I
- - ---· Contours
Survey
--·-· Shoreline
EJi,.v;:ition
.......
. Bo::a HOOSI:
-4 - -2
: ···· ; Prism 062716
Docks·
LJ Bo:uHoose
LJR3mps
L J WingDocks
,0
-2 - 0
-
- ~--4
-
-e--o
.Sur1ey complete in July 2016 with
-10--8
- - -15 --10
-20 - -15
-25 - -20
<-25
dGPS ' and J.ea_d lines. Tidal adjus11
Harbor 1 LLC, Portland OR.
Maintenance Dredging.
Dredge Footprint, Aug 29, 2016.
NWP-2016-199
-
to Columbia River Datum (Feet)
..
_,,.~
.,
Feet
0
37.5
Page 7/9
75
150
225
300
Enclosure
~*~)
< ·: 0--.
rt:
23
"'
Depth (Feet CRD)
x
x
25
Oisposnl Pipe
· · · · · . Channel
c:J
·
27
AJter~tive
(Nnviqn~io ri of)
x2Q
Oispos)(21
C ] Pri=$rn
'1,,,,
x
19
l(
20
17 ·
)(
x
19
x
21
i<
18
>i
l<
20
24
~4
23
'""
2!
:
,.24 i
)(
24:
x
x
24
x
21
)(
22
21
x
)(
19
20
x
)(
27
27
)(
26
x
x
24
"24
x
x
24
18
26
x
22
lC
23
21
24
~5
!<
)(
22
26
)(
I(
x
~
:
-·.··.
:
:
)(
-
21
ii
·--·-=
30
)(
22·
27 .
x
.27
)('
24
)(
QS
lC
23
)(
~
29
>(
-30
·11
)(
0
1N1EbtBC · 03Po
..c:=-..==::11111......~F~ee~t======~~~....--:~
0
31
.K
;c -
l(
x
IC
"
,25
')
l(
19
31
x
25
)(
25
)(
25
·
23
21
x
20
24
~
)(
)I
K
t24
20
J(
20
19
I(
21
~ I(
)(
I(
lC
':.
23
24
x
24
21
~
20
18
x
20
~
20
)(
' 20
..
20
"
24
27
'/(
x
-::,,
"
24
)(
25
21
"24
<:.....
x
x
)(
"
25
'11,,
)(
C:=J faXk)tS
)(
2-1
25
x
25
)(
1111111
26
145
290
580
870
1, 1GO
1NJE01
-00100
Harbor 1 LLC, Portland OR. Maintenance Dredging. Disposal Sites, Aug 29, 2016.
NWP-2016-199
Page 8/9
Enclosure
Disposal Transects
North Shore
South Shore
Tra nsect C
0
-5
- - - River Bottom
CJ
<:;
u.
0
-10
u
-15
a:
Maximum Fill
~ -20
-25
-30
----------------------------------------,.?---------l=vpect,----- .
~,-
<:;
0
----- Fill
~
~
----------0
100
200
300
400
-1 r-: 11
500
600
700
Distance {Feet)
North Shore
South Shore
Transect D
0
-5
- -- River Bottom
CJ
CJ
u.
0
sa:
-15
Maximum Fill
.i::
0.
-20
------------===--~--- ---::...-:~~~=- - --"':.::.::.
c)(.µt:c..l:ed Fill
o;
0
----- Fill
-10
-25
-30
0
100
200
400
300
500
Distance (Feet)
Harbor 1 LLC, Portland OR. Maintenance Dredging. Disposal Site Transects, Aug 29, 2016.
NWP-2016-199
Page 9/9
Enclosure
600
700
PUBLIC NOTICE
Application for Permit
Issue Date: October 14, 2016
Expiration Date: November 14, 2016
US Army Corps of Engineers No: NWP-2016-199
Oregon Department of State Lands No: 59085-RF
30-Day Notice
Interested parties are hereby notified the U.S. Army Corps of Engineers, Portland District
(Corps) has received an application for a Department of the Army permit for certain work in
waters of the United States, as described below and shown on the attached plans. The Corps
is soliciting comments on the proposed work.
Applicant:
Harbor 1 LLC
Attention: Milton O. Brown
9320 NE Hwy 99
Vancouver, WA 98665
Email: mobinv@comcast.net
Telephone: (360) 574-6255
Applicant's Agent: Harbor 1 LLC
Attention: Kathy Harrison
9320 NE Hwy 99
Vancouver, WA 98665
Email: kharrison@mobinv.net
Telephone: (360) 566-8192 ext. 20
Location: The project site is located at One Harbor Marina, 3307 NE Marine Drive, Portland,
Oregon. The site is in Section 1, Township 1 North, Range 1 East.
Latitude and Longitude: 45.6005 North, 122.63108 West
Waterway: The project is located on the Columbia River at River Mile 108.4.
Project Purpose: The project purpose is to maintain design depth in the marina.
Project Description: The proposed project is to conduct maintenance dredging of the Harbor
One Marina and conduct in-water placement of dredged material. Approximately 21,500 cubic
yards (CY) of material will be dredged over a five year period. Dredging would occur to a
maximum depth of -8 feet (ft) Columbia River Datum (CRD) in an area of approximately
175,150 square feet (4.02 acres). Dredged material will be placed at two designated in-water
placement sites in the Columbia River approximately 1,000 to 2,000 ft to the northeast of the
dredge area. The site of the proposed disposal area is at a depth of approximately -22 ft CRD
or deeper. The disposal site is located on the outside edge of the navigation channel.
Corps No. NWP-2016-199
Page 1 of 6
Dredging would be conducted using a 10-inch or 12-inch cutter head suction dredge operated
from a floating barge. The dredge slurry would be transported to the proposed disposal site
within the Columbia River, using a floating pipeline. The pipeline would be anchored in position
in multiple locations and would be clearly marked to identify navigational hazards to other river
users. The discharge end of the pipe would be attached to a small anchored barge or pontoon
and placed about three to five feet above the river bottom.
Dredging is proposed to take place between November 1 and December 31. The project will
take approximately 70 days to complete. The marina currently contains 264 slips, no additional
slips will be added with the proposed work. Hydrographic surveys will be performed by the
applicant of both the dredging and the in-water placement areas prior to and after dredging to
confirm and verify dredged depths and accurate placement of dredged material.
Dredged Material Testing: The proposed dredged material will be evaluated in accordance
with the Sediment Evaluation Framework for the Pacific Northwest (SEF). The interagency
Portland Sediment Evaluation Team (PSET) implements the SEF for the Corps Portland
District. The PSET will determine if sediment testing is required for this project. Project
sediments may require physical, chemical, and/or biological testing to support the permit
application evaluation. The PSET will evaluate the applicant's sediment testing results and
determine if project sediments are suitable for unconfined, aquatic disposal or exposure.
The proposed project includes future maintenance dredging. Prior to each maintenance
dredging cycle the applicant would be required to coordinate with the Corps and the PSET to
determine if additional sediment testing is required.
Mitigation: The applicant proposes to avoid and minimize impacts from the project by
conducting work within the November 1 to December 31 in-water work window and implement
construction best management practices to limit turbidity such as deployment of silt curtains
and controlled cutter head operation.
The applicant did not propose compensatory mitigation in the permit application. The Corps
will determine the type and amount of compensatory mitigation necessary to offset
environmental losses from the proposed project.
Drawings: Nine (9) drawings are attached and labeled Corps No. NWP-2016-199. Copies of
this public notice have been mailed or otherwise physically distributed. To access the
electronic version of this public notice, go to the Portland District website at
http://www.nwp.usace.army.mil/ and select Regulatory Branch Permit Information. At the
Regulatory page select Regulatory Public Notices.
Authority: The proposed project will be evaluated under the following:
Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting
navigable waters of the United States.
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material
into waters of the United States.
Clean Water Act Section 404(b)(1) Guidelines: The described discharge will be evaluated
for compliance with guidelines promulgated by the U.S. Environmental Protection Agency
Corps No. NWP-2016-199
Page 2 of 6
under authority of Section 404(b)(1) of the Clean Water Act. The 404(b)(1) Guidelines are the
substantive criteria used in evaluating discharges of dredged or fill material into waters of the
United States. The source of the fill material would be the material dredged from the Harbor
One Marina.
Water Quality Certification: Section 401 of the Clean Water Act (33 U.S.C. 1341) requires
applicants to obtain a water quality certification for proposed discharges into waters of the
United States. A permit for the described work will not be issued until certification has been
issued or is waived from the certifying state. Attached is the state's notice for a water quality
certification.
Endangered Species: Section 7 of the Endangered Species Act (ESA) (16 U.S.C 1536)
requires federal agencies to consult with the National Marine Fisheries Service (NMFS) and/or
U.S. Fish and Wildlife Service (USFWS) on all actions that may affect a species listed (or
proposed for listing) under the ESA as threatened or endangered or that may adversely modify
designated critical habitat. The Corps' preliminary review indicates the described activity may
affect an endangered or threatened species or designated critical habitat. The Corps will
initiate consultation under Section 7 of the ESA. The Corps will complete the required
consultation prior to finalizing a permit decision.
Essential Fish Habitat: Section 305(b)(2) of the Magnuson-Stevens Fishery Conservation
and Management Act (MSA) as amended (16 U.S.C 1855), requires Federal agencies to
consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by
the agency, that may adversely affect Essential Fish Habitat (EFH). The Corps' preliminary
review indicates the described activity would adversely affect EFH at the project location or in
the vicinity. The Corps will initiate consultation under Section 305(b)(2) of the MSA. The Corps
will complete the required consultation prior to finalizing a permit decision.
Historic Properties/Cultural Resources: Section 106 of the National Historic Preservation
Act of 1966, as amended (16 U.S.C. 470), requires Federal agencies to consult with the
appropriate State and/or Tribal Historic Preservation Officer to take into account the effects of
actions they undertake or permit on historic properties listed in or eligible for listing in the
National Register of Historic Places. The Corps' preliminary review indicates the described
activity is not located on property registered or eligible for registration in the latest published
version of the National Register of Historic Places. The permit area has been so extensively
modified by modern development that little likelihood exists for the proposed project to affect
an undisturbed historic property or any other type of cultural resource.
This notice has been provided to the State Historic Preservation Office (SHPO), interested
Native American Indian Tribes, and other interested parties. If you have information pertaining
to cultural resources within the permit area, please provide this information to the Corps' project
manager identified at the end of this notice to assist in a complete evaluation of potential
effects.
State and Local Authorizations: It is unknown if the applicant has applied for additional state
and local authorizations.
Public Hearing: Any person may request in writing within the comment period specified in this
notice that a public hearing be held to consider this application. Requests for public hearings
shall state with particularity the reasons for holding a public hearing.
Corps No. NWP-2016-199
Page 3 of 6
Evaluation: The decision whether to issue a permit will be based on an evaluation of the
probable impact, including cumulative impacts, of the described activity on the public interest.
That decision will reflect the national concern for both protection and utilization of important
resources. The benefit, which reasonably may be expected to accrue from the described
activity, must be balanced against its reasonably foreseeable detriments. All factors, which
may be relevant to the described activity will be considered including the cumulative effects
thereof; among those are conservation, economics, aesthetics, general environmental
concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain
values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production, mineral needs,
consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and
officials; Indian Tribes; and other interested parties in order to consider and evaluate the
impacts of the proposed project. Comments received will be considered by the Corps to
determine whether to issue, modify, condition or deny a permit for this proposal. Comments
are used in the preparation of an Environmental Assessment and/or an Environmental Impact
Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing.
Submitting Comments: Interested parties are invited to provide comments on the proposed
project. Comments may be submitted by conventional mail or email. All comments received
will be considered in determining whether authorizing the work would be contrary to the public
interest.
Either conventional mail or e-mail comments must include the Corps reference number as
shown on page 1 and include the commenter's name and address. In order to be accepted, email comments must originate from the author's e-mail account and must include on the subject
line of the e-mail message the Corps reference number. All comments received will become
part of the administrative record and are subject to public release under the Freedom of
Information Act including any personally identifiable information such as names, phone
numbers, and addresses.
Additional information about the proposed project may be obtained from the Corps Project
Manager listed below. All comments, whether by conventional mail or email, must be received
no later than the expiration date of this public notice to ensure consideration. Comments should
be submitted to the following mailing address or email address:
U.S. Army Corps of Engineers
Regulatory Branch
Margaret Chang
P.O. 2946
Portland, Oregon 97208-2946
Email: Margaret.Chang@usace.army.mil
Telephone: (503)808-4041
Corps No. NWP-2016-199
Page 4 of 6
PUBLIC NOTICE
Oregon Department of Environmental Quality (DEQ)
Water Quality 401 Certification
Notice Issued: October 14, 2016
Written Comments Due: November 14, 2016
Corps of Engineers No: NWP-2016-199
Oregon Department of State Lands No: 59085-RF
WHO IS THE APPLICANT: Harbor 1 LLC, Attn: Milton O. Brown
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers
public notice.
WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the
proposed project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants
for Federal permits or licenses to provide the Federal agency a water quality certification from
the State of Oregon if the proposed activity may result in a discharge to waters of the state.
DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice
on the proposed project.
WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as
a result of the proposal are available for examination and copying at Oregon Department of
Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region,
700 NE Multnomah Street, Suite 600, Portland, Oregon 97232. Other project materials are
available by contacting the Corps per the attached public notice.
Scheduling an appointment will ensure that water quality documents are readily accessible
during your visit. To schedule an appointment please call DEQ Water Quality at Northwest
Region at (503) 229-5263.
Any questions on the water quality certification process may be addressed to the 401 Program
Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People with
hearing impairments may call the Oregon Telecommunications Relay Service at 1-800-7352900.
Corps No. NWP-2016-199
Page 5 of 6
PUBLIC PARTICIPATION:
Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that "The Corps
provides public notice of and opportunity to comment on the applications, including the
application for certification, provided that the department (DEQ), in its discretion, may provide
additional opportunity for public comment, including public hearing."
Written comments:
Written comments on project elements related to water quality must be received at the Oregon
Department of Environmental Quality by 5 p.m. on the date specified in the upper right section
on page one of this notice. Written comments may be emailed, mailed or faxed as described
below:
Email - 401publiccomments@deq.state.or.us
Mail - Oregon Department of Environmental Quality, Northwest Region
700 NE Multnomah Street, Suite 600
Portland, Oregon 97232
Attn: 401 Water Quality Certification Coordinator
Fax - (503) 229-6957
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the
public comment period. Following this review, certification of the proposal may be issued as
proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you
submit comments during the comment period. Otherwise, if you wish to receive notification,
please call or write DEQ at the above address.
ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large
print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at
(503) 229-5317 or toll free within Oregon at 1-800-452-4011 to request an alternate format.
People with a hearing impairment can receive help by calling the Oregon Telecommunications
Relay Service at 1-800-735-2900.
Corps No. NWP-2016-199
Page 6 of 6