BOAT SLIP, DOCKS, HOUSE BOAT AND BULKHEAD IN BAYOU PIERRE PART IN ASSUMPTION PARISH

NAME OF APPLICANT: Timmie J. Gaudet, 146 Coon Road, Pierre Part, Louisiana 70339. LOCATION OF WORK: In Bayou Pierre Part and an adjacent access canal, Section 38, T12S-R13E, at 146 Coon Road in Pierre Part, Louisiana within Assumption Parish, within the Terrebonne Basin in hydrologic unit (HUC 08090302), as shown on the attached drawings (Latitude 30.017563 N, Longitude -91.185106 W). The work described below was partially completed prior to obtaining a Department of the Army permit and was in violation of Section 301 of the Clean Water Act. All legal issues concerning the unauthorized work have since been deferred. CHARACTER OF WORK: This project was previously placed on Public Notice from 29 August 2016 to 18 September 2016 however, modifications to the original project have been made which require additional notice. The applicant has requested Department of the Army authorization to construct and maintain residential improvements to include a boat ramp, boat dock, bulkhead and pier. Additionally, the applicant has proposed to moor a house boat within the access canal adjacent to Bayou Pierre Part. The proposed boat ramp, proposed boat dock and houseboat are to extend no more than 20 linear feet water ward into the access canal to Bayou Pierre Part. Approximately 235 linear feet of bulkhead and a pier extending 12 linear feet water ward into Bayou Pierre Part has been constructed. Approximately 0.06 acres of waters of the U.S. will be permanently impacted by structures and fill for the boat ramp. It is presumed that the applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. Any further reduction would limit usage of the property and, therefore function deeming the project impracticable. No wetlands will be impacted by this project.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas