The applicant proposing to amend Permit SWG-2010-00632 to include the construction of a 400-foot-long bulkhead.
Full Public Notice Project Plans
PROJECT DESCRIPTION: The applicant is proposing to amend Permit SWG-2010-00632 to include construction of a 400-foot-long bulkhead. The bulkhead would be steel sheet pile capped with concrete. The bulkhead would be placed at the approximate mean high water mark, at or near the toe of existing riprap, with minor variances needed because of existing shoreline irregularities.