Home

New Orleans District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

CONSTRUCTION OF THE TERREBONNE - BAYOU VISTA TRAMSMISSION LINE IN ASSUMPTION AND TERREBONNE PARISHES

NAME OF APPLICANT: Entergy Louisiana, LLC, c/o T. BAKER SMITH, LLC, Attn: Michael Trahan, P.O. Box 2266 Houma, LA 70361. LOCATION OF WORK: Centered approximately 12 miles west northwest of Houma, Louisiana between Allemand and Amelia, Louisiana, in Assumption and Terrebonne Parishes, within the Terrebonne Basin, in hydrologic unit (HUC 08090302), as shown on the attached drawings. CHARACTER OF WORK: The applicant has requested Department of the Army authorization to clear and place fill and caissons for the construction of the Terrebonne-Bayou Vista 230Kv Transmission Line. The planned route will follow an existing corridor, established access routes will be used, and staging areas will be matted. The line will be 24 miles in length and 238 caisson supported structures will be installed for the transmission line. The line will cross over Tiger Bayou, Donner Canal, Bayou L’Ours, and Bayou Boeuf. Approximately 0.1 acre jurisdictional forested wetlands will be filled by the caisson structures, approximately 123 acres of jurisdictional forested wetlands will be cleared and maintained as right-of-way (ROW), and approximately 21 acres of jurisdictional herbaceous emergent wetlands will be temporarily impacted during the construction of this project. The applicant has stated that the wetlands onsite were avoided in the planning stages and the route was configured to avoid wetland areas to the maximum extent possible. The applicant proposes to purchase in-kind mitigation credits from a Coastal approved mitigation bank. Currently there are not enough mitigation credits available in the Terrebonne Basin to fulfill mitigation requirements for this project. Therefore, applicant proposes to purchase in-kind mitigation credits from the Laurel Valley Mitigation bank which is located in the Barataria Basin, approximately 12 miles away from the start of this proposed transmission line project.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas