You can copy from here when filling out the rest of the page.
Project Name: SAS-2017-00419 SWITCH Data Center
County: Douglas
Nearest Named Waterbody: Chattahoochee River
Overall Project Purpose: Construction of Data Center
Project Name: SAS-2017-00419 SWITCH Data Center
County: Douglas
Nearest Named Waterbody: Chattahoochee River
Overall Project Purpose: Construction of Data Center
DEPARTMENT OF THE ARMY
U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT
100 WEST OGLETHORPE AVENUE
SAVANNAH, GEORGIA 31401-3604
September 11, 2018
Regulatory Branch
SAS-2017-00419
JOINT PUBLIC NOTICE
Savannah District/State of Georgia
The Savannah District has received an application for a Department of the Army
permit, pursuant to Section 404 of the Clean Water Act (33 U.S.C § 1344), as follows:
Application Number: SAS-2017-00419
Applicant: Mr. Jay Liebe, SUPERNAP Atlanta, LLC, 4200 60th Street Southeast,
Grand Rapids, Michigan 49512
Agents: Corblu Ecology Group, LLC, Mr. John T. Vermont, 3225 South Cherokee
Lane, Building 800, Woodstock, Georgia 30188
Location of Proposed Work: The 97-acre project site is located east of Thorton Road,
west of Six Flags Road, south of Factory Shoals Road and north of Douglas Hills Road
in Douglas County, Georgia (Latitude 33.6068, Longitude -84.7881).
Description of Work Subject to the Jurisdiction of the U.S. Army Corps of Engineers:
SWITCH proposes to permit and develop a SWITCHMOD Data Center Campus (Keep
Campus), a mission critical, highly secure, state-of-the art data center campus on an
approximately 97-acre property located in Douglas County, Georgia. The proposed
project consists of grading and development for Phase II and Ill of the KEEP Campus.
Approximately 34 acres, Phase I, of the site is currently under development. Phase I
was previously submitted and approved under separate local land disturbance permit
coverage where no jurisdictional waters impacts occurred. For reference the Phase I
project footprint for ATL 1 (the 1st phase in Atlanta) is 433,545 square feet (sq. ft.)
inclusive of the building footprint of 253,071 sq. ft. The remaining 63 acres (i.e., Phase II
and Ill) is proposed for grading and development of the balance of the KEEP Campus
that consists of two SWITCHMOD 250 facilities. Phase ll's project footprint is 483,969
sq. ft. inclusive of the building footprint of 211, 195 sq. ft. Phase Ill's project footprint is
1,012,963 sq. ft. inclusive of the building footprint of 463,758 sq. ft. for a total remaining
project footprint of 1,496,932 sq.ft. The proposed development will result in
unavoidable impacts to 4,800 linear feet of stream, 0.40-acre of wetland and 1.58-acre
of open water/pond. Compensatory mitigation will be acquired from an approved
bank(s) in the primary service area per the 2018 U.S. Army Corps of Engineers
(USACE), Savannah District mitigation guidelines (i.e., Middle Chattahoochee - Lake
Harding drainage basin; HUC - 03130002).
This Joint Public Notice announces a request for authorizations from both the Corps
and the State of Georgia. The applicant's proposed work may also require local
governmental approval.
STATE OF GEORGIA
Water Quality Certification: The Georgia Department of Natural Resources,
Environmental Protection Division, intends to certify this project at the end of 30 days in
accordance with the provisions of Section 401 of the Clean Water Act, which is required
for a Federal Permit to conduct activity in, on, or adjacent to the waters of the State of
Georgia. Copies of the application and supporting documents relative to a specific
application will be available for review and copying at the office of the Georgia
Department of Natural Resources, Environmental Protection Division, Water Protection
Branch, 2 Martin Luther King, Jr. Drive, Atlanta, Georgia 30334, during regular office
hours. A copier machine is available for public use at a charge of 25 cents per page.
Any person who desires to comment, object, or request a public hearing relative to
State Water Quality Certification must do so within 30 days of the State's receipt of
application in writing and state the reasons or basis of objections or request for a
hearing. The application can be reviewed in the Savannah District, U.S. Army Corps of
Engineers, Regulatory Branch, Albany Field Office, 1104 North Westover Boulevard,
Suite 9, Albany, Georgia 31707; or the Piedmont Field Office, 1590 Adamson Parkway,
Suite 200, Morrow, Georgia, 30260.
State-owned Property and Resources: The applicant may also require assent from
the State of Georgia, which may be in the form of a license, easement, lease, permit or
other appropriate instrument.
U.S. ARMY CORPS OF ENGINEERS
The Savannah District must consider the purpose and the impacts of the applicant's
proposed work, prior to a decision on issuance of a Department of the Army permit.
Cultural Resources Assessment: In compliance with Section 106 of the National
Historic Preservation Act of 1966 and amendments thereto, an analysis for
archaeological and historic resources was conducted. R. S. Webb and Associates
conducted a Phase I Cultural Resources Survey of the undisturbed portions of the
project area. This report will be coordinated with the State Historic Preservation Office.
The Corps has NOT made a determination of no effect , no adverse effect, or adverse
effect to archaeological or historical resources listed or eligible for listing in the NRHP.
2
Endangered Species: No critical habitat for federally listed threatened or endangered
species is located on the project site. The Corps has determined that the project will
have no effect on federally listed threatened or endangered species.
Pursuant to Section 7(c) of the Endangered Species Act of 1973, as amended (16
U.S.C. § 1531 et seq.), we request information from the U.S. Department of the Interior,
Fish and Wildlife Service, the U.S. Department of Commerce, National Oceanic and
Atmospheric Administration, National Marine Fisheries Service; or, any other interested
party, on whether any species listed or proposed for listing may be present in the area
and the potential effects this project may have on those species.
Public Interest Review: The decision whether to issue a permit will be based on an
evaluation of the probable impact including cumulative impacts of the proposed activity
on the public interest. That decision will reflect the national concern for both protection
and utilization of important resources. The benefit, which reasonably may be expected
to accrue from the proposal, must be balanced against its reasonably foreseeable
detriments. All factors, which may be relevant to the proposal will be considered
including the cumulative effects thereof; among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, historic properties, fish and
wildlife values, flood hazards, flood plain values, land use, navigation, shoreline erosion
and accretion, recreation, water supply and conservation, water quality, energy needs,
safety, food and fiber production, mineral needs, considerations of property ownership
and in general, the needs and welfare of the people.
Consideration of Public Comments: The Corps is soliciting comments from the
public; federal, state, and local agencies and officials; Native American Tribes; and
other interested parties in order to consider and evaluate the impacts of this proposed
activity. Any comments received will be considered by the Corps to determine whether
to issue, modify, condition or deny a permit for this proposal. To make this decision,
comments are used to assess impacts on endangered species, historic properties,
water quality, general environmental effects, and the other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or
an Environmental Impact Statement pursuant to the National Environmental Policy Act.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
Application of Section 404(b)(1) Guidelines: The proposed activity involves the
discharge of dredged or fill material into the waters of the United States. The Savannah
District's evaluation of the impact of the activity on the public interest will include
application of the guidelines promulgated by the Administrator, Environmental
Protection Agency, under the authority of Section 404(b) of the Clean Water Act.
Public Hearing: Any person may request, in writing, within the comment period
specified in this notice, that a public hearing be held to consider this application for a
Department of the Army permit. Requests for public hearings shall state, with
3
particularity, the reasons for requesting a public hearing. The decision whether to hold
a public hearing is at the discretion of the District Engineer, or his designated appointee,
based on the need for additional substantial information necessary in evaluating the
proposed project.
Comment Period: Anyone wishing to comment on this application for a Department
of the Army permit should submit comments in writing to the Commander, U.S. Army
Corps of Engineers, Savannah District, Attention: Ms. Holly Ross, 1104 North Westover
Boulevard, Suite 9, Albany, Georgia, 31707, no later than 30 days from the date of this
notice. Please refer to the applicant's name and the application number in your
comments.
If you have any further questions concerning this matter, please contact
Ms. Holly Ross, Project Manager, Albany Field Office at 648-422-2727 or via email at
holly.a.ross@usace.army.mil.
Enclosures:
1. Figures 1 4 Location and Site Mapping
2. Figure 5 Location of alternative sites
3. Alternative site layout
4. Preferred site layout
4