Project Name: SAS-2017-00419 SWITCH Data Center County: Douglas Nearest Named Waterbody: Chattahoochee River Overall Project Purpose: Construction of Data Center

Project Name: SAS-2017-00419 SWITCH Data Center County: Douglas Nearest Named Waterbody: Chattahoochee River Overall Project Purpose: Construction of Data Center

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 WEST OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3604

September 11, 2018 Regulatory Branch SAS-2017-00419

JOINT PUBLIC NOTICE Savannah District/State of Georgia

The Savannah District has received an application for a Department of the Army permit, pursuant to Section 404 of the Clean Water Act (33 U.S.C § 1344), as follows: Application Number: SAS-2017-00419 Applicant: Mr. Jay Liebe, SUPERNAP Atlanta, LLC, 4200 60th Street Southeast, Grand Rapids, Michigan 49512 Agents: Corblu Ecology Group, LLC, Mr. John T. Vermont, 3225 South Cherokee Lane, Building 800, Woodstock, Georgia 30188 Location of Proposed Work: The 97-acre project site is located east of Thorton Road, west of Six Flags Road, south of Factory Shoals Road and north of Douglas Hills Road in Douglas County, Georgia (Latitude 33.6068, Longitude -84.7881). Description of Work Subject to the Jurisdiction of the U.S. Army Corps of Engineers: SWITCH proposes to permit and develop a SWITCHMOD Data Center Campus (Keep Campus), a mission critical, highly secure, state-of-the art data center campus on an approximately 97-acre property located in Douglas County, Georgia. The proposed project consists of grading and development for Phase II and Ill of the KEEP Campus. Approximately 34 acres, Phase I, of the site is currently under development. Phase I was previously submitted and approved under separate local land disturbance permit coverage where no jurisdictional waters impacts occurred. For reference the Phase I project footprint for ATL 1 (the 1st phase in Atlanta) is 433,545 square feet (sq. ft.) inclusive of the building footprint of 253,071 sq. ft. The remaining 63 acres (i.e., Phase II and Ill) is proposed for grading and development of the balance of the KEEP Campus that consists of two SWITCHMOD 250 facilities. Phase ll's project footprint is 483,969 sq. ft. inclusive of the building footprint of 211, 195 sq. ft. Phase Ill's project footprint is 1,012,963 sq. ft. inclusive of the building footprint of 463,758 sq. ft. for a total remaining project footprint of 1,496,932 sq.ft. The proposed development will result in unavoidable impacts to 4,800 linear feet of stream, 0.40-acre of wetland and 1.58-acre of open water/pond. Compensatory mitigation will be acquired from an approved bank(s) in the primary service area per the 2018 U.S. Army Corps of Engineers

(USACE), Savannah District mitigation guidelines (i.e., Middle Chattahoochee - Lake Harding drainage basin; HUC - 03130002). This Joint Public Notice announces a request for authorizations from both the Corps and the State of Georgia. The applicant's proposed work may also require local governmental approval. STATE OF GEORGIA Water Quality Certification: The Georgia Department of Natural Resources, Environmental Protection Division, intends to certify this project at the end of 30 days in accordance with the provisions of Section 401 of the Clean Water Act, which is required for a Federal Permit to conduct activity in, on, or adjacent to the waters of the State of Georgia. Copies of the application and supporting documents relative to a specific application will be available for review and copying at the office of the Georgia Department of Natural Resources, Environmental Protection Division, Water Protection Branch, 2 Martin Luther King, Jr. Drive, Atlanta, Georgia 30334, during regular office hours. A copier machine is available for public use at a charge of 25 cents per page. Any person who desires to comment, object, or request a public hearing relative to State Water Quality Certification must do so within 30 days of the State's receipt of application in writing and state the reasons or basis of objections or request for a hearing. The application can be reviewed in the Savannah District, U.S. Army Corps of Engineers, Regulatory Branch, Albany Field Office, 1104 North Westover Boulevard, Suite 9, Albany, Georgia 31707; or the Piedmont Field Office, 1590 Adamson Parkway, Suite 200, Morrow, Georgia, 30260. State-owned Property and Resources: The applicant may also require assent from the State of Georgia, which may be in the form of a license, easement, lease, permit or other appropriate instrument. U.S. ARMY CORPS OF ENGINEERS The Savannah District must consider the purpose and the impacts of the applicant's proposed work, prior to a decision on issuance of a Department of the Army permit. Cultural Resources Assessment: In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, an analysis for archaeological and historic resources was conducted. R. S. Webb and Associates conducted a Phase I Cultural Resources Survey of the undisturbed portions of the project area. This report will be coordinated with the State Historic Preservation Office. The Corps has NOT made a determination of no effect , no adverse effect, or adverse effect to archaeological or historical resources listed or eligible for listing in the NRHP.

2

Endangered Species: No critical habitat for federally listed threatened or endangered species is located on the project site. The Corps has determined that the project will have no effect on federally listed threatened or endangered species. Pursuant to Section 7(c) of the Endangered Species Act of 1973, as amended (16 U.S.C. § 1531 et seq.), we request information from the U.S. Department of the Interior, Fish and Wildlife Service, the U.S. Department of Commerce, National Oceanic and Atmospheric Administration, National Marine Fisheries Service; or, any other interested party, on whether any species listed or proposed for listing may be present in the area and the potential effects this project may have on those species. Public Interest Review: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and in general, the needs and welfare of the people. Consideration of Public Comments: The Corps is soliciting comments from the public; federal, state, and local agencies and officials; Native American Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Application of Section 404(b)(1) Guidelines: The proposed activity involves the discharge of dredged or fill material into the waters of the United States. The Savannah District's evaluation of the impact of the activity on the public interest will include application of the guidelines promulgated by the Administrator, Environmental Protection Agency, under the authority of Section 404(b) of the Clean Water Act. Public Hearing: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application for a Department of the Army permit. Requests for public hearings shall state, with 3

particularity, the reasons for requesting a public hearing. The decision whether to hold a public hearing is at the discretion of the District Engineer, or his designated appointee, based on the need for additional substantial information necessary in evaluating the proposed project. Comment Period: Anyone wishing to comment on this application for a Department of the Army permit should submit comments in writing to the Commander, U.S. Army Corps of Engineers, Savannah District, Attention: Ms. Holly Ross, 1104 North Westover Boulevard, Suite 9, Albany, Georgia, 31707, no later than 30 days from the date of this notice. Please refer to the applicant's name and the application number in your comments. If you have any further questions concerning this matter, please contact Ms. Holly Ross, Project Manager, Albany Field Office at 648-422-2727 or via email at holly.a.ross@usace.army.mil. Enclosures: 1. Figures 1 ­ 4 Location and Site Mapping 2. Figure 5 Location of alternative sites 3. Alternative site layout 4. Preferred site layout

4

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas