You can copy from here when filling out the rest of the page.
County: Georgia.
Overall Project Purpose: These RPs authorize the maintenance, repair,
replacement, improvement, and widening of existing roads, and the construction of new
roads, bridges, culverts, and associated structures. See the enclosed RPs for a
complete description of authorized activities, and the terms and conditions for RP use.
County: Georgia.
Overall Project Purpose: These RPs authorize the maintenance, repair,
replacement, improvement, and widening of existing roads, and the construction of new
roads, bridges, culverts, and associated structures. See the enclosed RPs for a
complete description of authorized activities, and the terms and conditions for RP use.
DEPARTMENT OF THE ARMY
U.S. ARMY CORPS OF ENGINEERS
SAVANNAH DISTRICT
100 W. OGLETHORPE AVENUE
SAVANNAH, GEORGIA 31401-3604
October 5, 2018
Regulatory Branch
SAS-2018-00158
PUBLIC NOTICE
ISSUANCE OF REGIONAL PERMITS
30, 31, 32, 33, 34, AND 35
AUTHORIZING LOCAL, STATE, AND FEDERAL
GOVERNMENT FUNDED TRANSPORTAION PROJECTS
WITHIN THE STATE OF GEORGIA
The Savannah District, U.S. Army Corps of Engineers, by means of this notice is
advertising issuance of Regional Permits 30, 31, 32, 33, 34, and 35, authorizing impacts
to waters of the United States for the construction of public transportation projects,
within the State of Georgia, pursuant to Section 404 of the Clean Water Act (33 U.S.C.
1344), and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403).
Scope: Regional Permits (RP) are a type of General Permit, which may be issued by
the District Commander to authorize activities which are substantially similar in nature
and cause only minimal individual and cumulative environmental impacts (33 C.F.R.
Parts 322.2(f), 325.2(e), and 330). The scope of these RPs include only those activities
considered to be minor in nature and that would result in minimal individual and
cumulative environmental impacts.
Description of Authorized Activities: These RPs authorize the maintenance, repair,
replacement, improvement, and widening of existing roads, and the construction of new
roads, bridges, culverts, and associated structures. See the enclosed RPs for a
complete description of authorized activities, and the terms and conditions for RP use.
Other Authorizations: Any jurisdictional activity that does not meet the terms and
conditions for authorization by these RPs, or that would exceed the limitations of the
RPs, will require project-specific authorization from the Corps in the form of an
Individual Permit (IP). The District Commander may also on a case-by-case basis
require submission of an application for an IP, if it is determined that authorization of a
public transportation project by these RPs would be contrary to the public interest or
potentially result in more than minimal environmental impact.
Inquiries concerning these RPs should be made to the US Army Corps of Engineers,
Regulatory Branch, 100 West Oglethorpe Avenue, Savannah, Georgia, 31401. The
telephone Numbers of the Regulatory Branch are (912) 652-5768 or 1-800-448-2402.
Enclosure - Regional Permits 30, 31, 32, 33, 34, and 35 (w/encls)
CESAS-OP-F
SAS-2018-00158
Effective Date: October 5, 2018
Expiration Date: October 5, 2023
SAVANNAH DISTRICT, U.S. ARMY CORPS OF ENGINEERS
REGIONAL PERMITS 30, 31, 32, 33, 34, AND 35
FOR PUBLIC TRANSPORTATION PROJECTS
WITHIN THE STATE OF GEORGIA
I. AUTHORITY: On the recommendation of the Chief of Engineers, and pursuant to
Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) and Section 404 of
the Clean Water Act (33 U.S.C. 1344), the Savannah District, U.S. Army Corps of
Engineers authorizes the discharge of dredged and/or fill material into the waters of the
United States (U.S.), as described in the below Regional Permits (RPs), within the
geographic limits of the State of Georgia.
II. PURPOSE: The purpose of these RPs is to provide a simplified and expeditious
means for the Corps to authorize certain public transportation projects undertaken by
local, state, and federal government transportation agencies, which require impacts to
streams, wetlands and other waters of the U.S.; and that are similar in nature and result
in minor individual or cumulative impacts to aquatic resources. These RPs authorize
the maintenance, repair, replacement, improvement, and widening of existing public
transportation projects, including interstate highways, state highways, county roads,
urban or suburban roads, railroads, airport taxiways, bicycle paths/lanes, and other
facilities utilized for public transportation; and the construction of new public
transportation projects, and associated structures.
III. AUTHROIZED ACTIVITIES:
RP 30 Maintenance, repair, rehabilitation, and replacement of roads, culverts, bridges,
and associated structures. Minor deviations in the configuration of the structure are
authorized, when due to changes in materials, construction techniques, requirements of
other regulatory agencies, current construction codes, or safety standards. This RP
also authorizes: the removal of accumulated sediment and debris from stream
channels within 100 feet up or downstream of an existing culvert or bridge; and the
removal of previously authorized structures or fills. Impacts to wetlands, streams, and
other waters of the U.S. are limited to the minimum necessary to accomplish a project;
with stream channel modification limited to within 100 feet up and/or downstream of the
existing bridge, culvert, or other structure.
RP 31 Temporary access, bypass, dewatering, and other temporary structures and
fills, including cofferdams, which are necessary to maintain, repair, rehabilitate, replace,
improve, widen, and construct roads, bridges, culverts, and associated structures.
Appropriate measures must be taken to maintain near normal downstream flows and to
minimize flooding. Fills must consist of materials, and be placed in a manner, that will
not be eroded by expected high flows. Following project completion, all temporary
structures and fills must be entirely removed to upland areas, with affected aquatic
resource areas restored to the pre-construction elevation; hydrologic and flow regime;
bed and bank condition; and vegetation condition, as appropriate. Impacts to wetlands,
streams and other waters of the U.S. are limited to the minimum necessary to
accomplish the primary activity; with stream channel modification limited to within 100
feet up and/or downstream of the existing bridge, culvert, or other structure. Temporary
impacts to wetlands and streams authorized by RP 31 are not included in the
cumulative aquatic loss limits for use of RPs 34 and 35.
RP 32 Replacement of bridges with bridges. Impacts to waters of the U.S. are limited
to the minimum necessary to accomplish bridge replacement. Stream channel
modification is limited to 100 feet up and/or downstream of the existing bridge.
RP 33 Replacement of culverts with culverts or bridges. Impacts to waters of the U.S.
are limited to the minimum necessary to accomplish culvert replacement. Stream
channel modification is limited to 100 feet up and/or downstream of the existing culvert.
RP 34 Construction of roads, culverts, bridges, and other structures or fills associated
with improvements to all existing public transportation projects and/or with all new public
transportation projects. Permanent aquatic losses resulting from a single and complete
crossing are limited to: 1,500 linear feet of intermittent and/or perennial stream, and 2
acres of wetland for projects located in the northern Georgia counties; and 1,000 linear
feet of intermittent and/or perennial stream, and 3 acres of wetland, for projects located
in southern counties. Permanent aquatic losses resulting from a total linear
transportation project are limited to 2,000 linear feet of intermittent and/or perennial
stream, and 8 acres of wetland for projects located in northern counties; and 1,500
linear feet of intermittent and/or perennial stream, and 10 acres of wetland for projects
located in the southern counties. Permanent losses of other jurisdictional waters of the
U.S. (e.g., open water, ephemeral streams, and ditches) are limited to the minimum
necessary to accomplish the primary activity. See Table 1 below for a summary of RP
34 and 35 authorized permanent stream and wetland losses.
RP 35 Construction of new public transportation projects that will be part of the state
transportation system; which is limited to State Routes, U.S. Highways, and Interstate
Highways. Permanent aquatic losses resulting from a single and complete crossing are
limited to: 2,000 linear feet of intermittent and/or perennial stream, and 4 acres of
wetland for projects located in the northern Georgia counties; and 1,500 linear feet of
intermittent and/or perennial stream, and 5 acres of wetland, for projects located in
southern counties. Permanent aquatic losses resulting from a total linear transportation
project are limited to: 5,000 linear feet of intermittent and/or perennial stream, and 12
acres of wetland for projects located in northern counties; and 4,000 linear feet of
intermittent and/or perennial stream, and 15 acres of wetland for projects located in the
southern counties. Permanent losses of other jurisdictional waters of the U.S. (e.g.,
2
open water, ephemeral streams, and ditches) are limited to the minimum necessary to
accomplish the primary activity.
NOTES: For the purposes of these RPs, a total linear transportation project includes all
individual single and complete crossings of waters of the U.S., and associated work in
waters of the U.S., located between a project's beginning and ending logical termini.
See Appendix A for a map depicting northern and southern Georgia counties. Table 1
below, summarizes RP 34 and RP 35 authorized permanent stream and wetland losses
for single and complete crossings, and for total linear transportation projects.
Table 1. Maximum Authorized Permanent Aquatic Losses for Uses of RPs 34 and 35
Stream Loss (linear feet)
Wetland Loss (acres)
Single/Complete Crossing
Total Linear
Single/Complete
Total Linear
Project
Crossing
Project
RP 34 North GA Counties
1,500
2,000
2.0
8.0
South GA Counties
1,000
1,500
3.0
10.0
RP 35 North GA Counties
2,000
5,000
4.0
12.0
South GA Counties
1,500
4,000
5.0
15.0
IV. GENERAL CONDITIONS:
1. Activities which are not specified in these RPs or which exceed RP limitations would
require authorization under a Department of the Army individual permit from the Corps.
The Corps may also require Department of the Army individual permit authorization on a
case-by-case basis if it is determined that authorization under the RPs for a specific
project might be contrary to the public interest. For additional information on permits,
please visit http://www.sas.usace.army.mil/Missions/Regulatory.aspx.
2. All activities identified and authorized herein shall be consistent with the terms and
conditions of these RPs. Any activity not specifically identified and authorized herein
shall constitute a violation of the terms and conditions of the applicable RP, which may
result in the modification, suspension, or revocation of the RP, in whole or in part, as set
forth more specifically in General Condition 3, and in the institution of such legal
proceedings as the U.S. government may consider appropriate, whether or not the
permit has been previously modified, suspended, or revoked in whole or in part.
3. In issuing a verification of authorization for use of a RP for a specific project, the
Corps relies on the information and data which the Applicant provides in connection with
a Pre-Construction Notification (PCN). If, subsequent to the Corps' issuance of a
verification of authorization under a RP, such information and data are determined to be
false, incomplete, or inaccurate, the verification of authorization may be modified,
suspended, or revoked, in whole or in part, and/or the Corps may, in addition, initiate
appropriate legal proceedings. Furthermore, one or more of the RPs may be summarily
suspended, in whole or in part, upon a finding by the District Commander that
immediate suspension of the activity authorized herein would be in the general public
interest. Such suspension shall be effective upon receipt by a Permittee of a written
3
notice thereof which shall indicate (a) the extent of the suspension, (b) the reason(s) for
this action, and (c) any corrective or preventative measures to be taken by a Permittee
which are deemed necessary by the District Commander to abate imminent hazards to
the general public interest. The Permittee shall take immediate action to comply with
the provisions of such notice. Within l0 days following receipt of notice of suspension,
the Permittee may request a hearing in order to present information relevant to a
decision as to whether the permit should be reinstated, modified, or revoked. If a
hearing is requested, it shall be conducted pursuant to procedures prescribed by the
Chief of Engineers. After completion of the hearing, or within a reasonable time after
issuance of the suspension notice to the Permittee, if no hearing is requested, the
permit will either be reinstated, modified or revoked.
4. Any modification, suspension, or revocation of a RP shall not be the basis for any
claim for damages against the U.S.
5. Use of these RPs does not authorize interference with any existing or proposed
federal project and the Permittee shall not be entitled to compensation for damage or
injury to the structures or works authorized herein which may be caused by or result
from existing or future operations undertaken by the U.S. in the public interest.
6. If and/or when a Permittee desires to abandon an activity authorized by these RPs,
unless such abandonment is part of a transfer procedure by which a Permittee is
transferring interests herein to a third party, the area must be restored to a condition
satisfactory to the District Commander.
V. SPECIAL CONDITIONS:
1. Transportation projects authorized by these RPs must be funded by federal, state, or
local government (Applicant).
2. For proposed projects that meet the terms and conditions for authorization under
RP 30 or 31, neither submission of a Pre-Construction Notification (PCN) to the Corps,
nor verification for use of these RPs by the Corps is required, provided all of the
following are met: (a) the proposed project would have no effect on federally listed
threatened or endangered species, or listed critical habitat, pursuant to Section 7 of the
Endangered Species Act (ESA); (b) within or adjacent to the proposed project area,
there are no cultural resources that are potentially eligible for listing or listed in the
National Register of Historic Places, pursuant to Section 106 of the National Historic
Preservation Act (NHPA); and (c) the proposed project would impact less than 100
linear feet of stream and/or 0.1 acre or wetlands. Permittees are required to comply
with all applicable terms and conditions for non-notifying uses of RPs 30 and 31.
[NOTE: See Section VI below for Georgia Department of Natural Resources (GDNR)
requirements for non-notifying projects, and projects located in tidal waters.]
4
3. Except for projects that qualify for non-notifying uses of RPs 30 and 31 described
above, prior to conducting work under authority of these RPs, the Applicant must submit
a complete PCN to the Corps, and receive written verification from the Corps that a
proposed project is authorized by RP.
4. Use of RP 35 is only available for construction of new roads that will be part of the
state transportation system; which is limited to State Routes, U.S. Highways, and
Interstate Highways. Prior to use of RP 35, all of the following actions will be
completed: early in the GDOT plan development process (PDP), comments and
recommendations will have been solicited from the resource agencies (Corps, Federal
Highway Administration (FHWA), U.S. Fish and Wildlife Service (FWS), U.S.
Environmental Protection Agency (EPA), National Marine Fisheries Service (NMFS);
GDNR, Georgia Environmental Protection Division (EPD), and Georgia Coastal
Resources Division (CRD); the lead federal agency (LFA) will have completed
consultation pursuant to ESA and NHPA, when required; and pursuant to the Section
404(b)(1) Guidelines of the Clean Water Act, the Corps will have determined that the
project is the least environmentally damaging practicable alternative (LEDPA) that
would meet the basic project purpose. For projects proposed for authorization under
these RPs, the FHWA is the LFA for federally funded projects, and the Corps is the LFA
for state and locally funded projects.
5. A project that is verified by the Corps to be authorized by these RPs will remain
authorized until the scheduled RP expiration date. When a project is verified by the
Corps to be authorized by RP, and authorized work is not initiated or completed prior to
the RP expiration date, the project will be conditionally re-authorized if and when the
RPs are re-issued by the Corps for a subsequent five-year period, provided: (a) the
expired and re-issued RP used to authorized the project are substantively the same;
and (b) the RP authorized project is unchanged. In such cases, the Permittee is not
required to request verification from the Corps that a project that was previously verified
by the Corps to be authorized by RP continues to be authorized by the re-issued RP. A
RP authorized project can only be conditionally re-authorized once. For any RP
authorized project not initiated or completed by the end of the second five-year RP
authorization period, the Permittee must submit a new PCN to the Corps and request
verification of use of RP to complete the project; which will require re-evaluation of the
project by the Corps.
6. No activity authorized by these RPs may cause more than a minimal adverse effect
on Navigation. Any safety lights and signals prescribed by the U.S. Coast Guard
(USCG), through regulations or otherwise, must be installed and maintained at the
Permittee's expense on authorized facilities in navigable waters of the United States.
The Permittee understands and agrees that, if future operations by the United States
require the removal, relocation, or other alteration, of the structure or work herein
authorized, or if, in the opinion of the Secretary of the Army or his authorized
representative, said structure or work shall cause unreasonable obstruction to the free
navigation of the navigable waters, the Permittee will be required, upon due notice from
the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions
5
caused thereby, without expense to the United States. No claim shall be made against
the United States on account of any such removal or alteration.
7. Bridges constructed over navigable waters of the U.S. are subject to the jurisdiction
of the USCG, pursuant to Section 9 of the Rivers and Harbors Act. For projects that
include construction of a bridge over navigable waters, the Applicant must obtain written
approval or waiver from the USCG prior to use of these RPs.
8. These RPs cannot be used in conjunction with other RPs, Nationwide Permits, or an
Individual Permit to authorize any work or activities that would result in greater aquatic
impacts.
9. No RP authorized activity may cause more than minimal adverse effects on tribal
rights (including treaty rights), protected tribal resources, or tribal lands.
10. Certain activities proposed for authorization by RP may also require permission
from the Corps pursuant to 33 U.S.C. 408 (Section 408), because it will alter or
temporarily or permanently occupy or use a Corps federally authorized Civil Works
project. When applicable, these RPs cannot be used to authorize a transportation
project until after the appropriate Corps office has issued Section 408 permission to
alter, occupy, or use the Corps project; and the Corps issues subsequent written
verification that the proposed project is authorized by RP.
11. On a case-by-case basis, use of these RPs may be prohibited in waters of the U.S.
that support anadromous fish, or in waters that previously supported such fish and where
restoration of fish migrations and populations is possible. The established limits for these
waters are identified in Appendix B, and includes adjacent and tributary waters located
within 1,000 feet of these identified waters. Proposed transportation projects that may
impact anadromous fish waters will be coordinated by the Corps with NMFS and/or FWS.
Only those proposed projects that are determined by the Corps, NMFS, and/or FWS to
have minimal impact on anadromous fish waters or their restoration will be authorized by
these RPs.
12. All RP authorized activities must comply with applicable local and state floodplain
management requirements; and applicable requirements of the Federal Emergency
Management Agency that concern construction activities in, or the addition of fill
material to designated floodplains and floodways.
13. All work performed under authority of these RPs is subject to the conditions
contained in the attached Water Quality Certification, issued by EPD, pursuant to
Section 401 of the Clean Water Act.
14. Projects authorized by these RPs may require a variance from EPD prior to
conducting land disturbing activities or placement of materials within the Statemandated buffer, per O.C.G.A. § 12-7-6 of The Erosion and Sedimentation Act of 1975
(E&S Act). Non-exempt construction projects within the buffer and without a buffer
6
variance are in violation of O.C.G.A. 12-7-6, in the E&S Act. Failure to maintain a
stream buffer requires the issuance of a stop work order (O.C.G.A. 12-7-12(d)). Please
see EPD's website, http://www.gaepd.org, or contact the NonPoint Source Program at
(404) 651-8554, for: guidance on buffer determinations and variances; the process of
obtaining a buffer variance; information on what constitutes a minor land disturbing
activity; and additional information on the E&S Act. Applicants should also refer to
EPD's "Streambank and Shoreline Stabilization Guidance," available on the website, for
further information on the preferred, acceptable and discouraged methods of shoreline
stabilization in Georgia.
15. All work conducted under these RPs shall be located, outlined, designed,
constructed, and operated in accordance with the minimal requirements as contained in
the E&S Act. Utilization of plans and specifications as contained in "Manual for Erosion
and Sediment Control, (Latest Edition)" published by the Georgia Soil and Water
Conservation Commission or their equivalent will aid in achieving compliance with the
aforementioned requirements. The latest edition of the manual can be accessed at the
above referenced EPD website.
16. Culverts in Perennial Streams: (Note: Diagrams and pictures of appropriate and
inappropriate culverted stream crossing designs are located in attached Appendix C.)
a. No activity may substantially disrupt the necessary life cycle movements of those
species of aquatic life indigenous to the waterbody, including those species that
normally migrate through the area. If a bottomless culvert cannot be used, then the
crossing should be designed and constructed to minimize adverse effects to aquatic life,
their habitat, and continuity of that habitat, as described below.
b. The dimension, pattern, and profile of the stream above and below a pipe or
culvert should not be modified by altering the width or depth of the stream profile in
connection with the construction activity. The width, height, and gradient of a proposed
culvert should be sufficient to pass the average low flow and the average high flow
without altering flow velocity.
c. Culverts must be designed and constructed in a manner that minimizes
destabilization and head cutting. Destabilizing the channel and head cutting upstream
should be considered and appropriate actions incorporated in the design and placement
of the culvert.
d. The width of the main culvert(s) shall be approximately equal to the average
channel width. Culvert(s) shall not permanently widen/constrict the channel or
reduce/increase stream depth. Multiple box culverts are acceptable to receive base
flows. Multiple pipes or culverts may not be used to receive base flows. Additional
pipes or culverts may be used to receive storm flows, but must be placed at a higher
elevation than the main culvert or baffled.
7
e. Bank-full flows shall be accommodated through maintenance of the existing bankfull cross-sectional area.
f. The upstream and downstream invert of culverts (except bottomless culverts)
installed in perennial streams will be buried/embedded to a depth of 20% of the culvert
height to allow natural substrate to colonize the structure's bottom and encourage fish
movement.
g. Culvert slope shall be consistent with average stream segment slope, but shall not
exceed 4 percent unless additional measures are made to encourage colonization of
natural bed sediments in the bottom of the culvert.
h. Culverts shall be of adequate size to accommodate flooding and sheet flow in a
manner that does not cause flooding of associated uplands or disruption of hydrologic
characteristics that support aquatic sites on either side of the culvert.
i. Where adjacent floodplain is available, floodplain culverts should be used to pass
flow through natural flow paths in the floodplain. Flood flows should not be constricted.
Only in situations where a stream lacks a floodplain or the floodplain is no longer active
due to entrenchment should flood flows be directed to the main culvert.
j. Culverts placed within riparian and/or riverine wetlands must be installed in a
manner that does not restrict the flow and circulation patterns of waters. Culverts placed
across wetland fills purely for the purposes of equalizing surface water do not have to
be buried, but the culverts must be of adequate size and/or number to ensure
unrestricted transmission of water.
k. Culvert extensions should implement the above conditions, where practical, to the
maximum extent practicable to minimize adverse effects to aquatic life, their habitat,
and connectivity of that habitat.
17. For projects that involve the installation of jetties, bulkheads, cofferdams, and other
temporary structures that constrict stream/river flow, channel constriction must not
exceed 33 percent of total stream/river width at any time.
18. Mitigation:
a. The Corps has the discretion to determine the loss and/or change in aquatic
function that would result from a permanent and/or temporary adverse impact to waters
of the U.S. (e.g., fill, flood, clear, excavate, etc.), resulting from an activity authorized by
these RPs, and the type and amount of compensatory mitigation needed to offset this
loss or change. A compensatory mitigation plan is required for projects that result in an
adverse impact to 0.1 acre or more of wetlands and/or 100 linear feet or more of
stream. For a total linear project, if the sum of impacts from all individual single and
complete projects meets or exceeds 0.1 acre of wetland and/or 100 linear feet of
stream, mitigation is required for all impacts that would result from construction of the
8
total linear project. For a linear transportation project (e.g., interstate highway, state
highway, county road, urban and suburban road, railroad, taxiway, etc.) the total linear
project includes all individual single and complete crossings of waters of the U.S. that
are located between the beginning and end of the proposed project.
b. Compensatory mitigation plans must be in accordance with the most recent
version of Savannah District's Standard Operating Procedure (SOP) for mitigation, and
the 2008 Final Compensatory Mitigation Rule (33 CFR Parts 325 and 332).
c. As stated in the 2008 Final Compensatory Mitigation Rule, the preferred method of
compensatory mitigation for impacts to waters of the U.S. is the purchase of credits
from an approved commercial mitigation bank.
d. For the purposes of calculating stream mitigation for RP authorized projects,
impact areas will be in linear feet, with no decimal point (e.g., 100, not 100.1).
e. For the purposes of calculating wetland mitigation for RP authorized projects,
impact areas will be in acres and tenths of acres (e.g., 10.1, not 10.11), with impact
areas rounded up or down to the nearest 10th of an acre. Only for impacts of less than
0.1 acre of wetland will mitigation be calculated for less than 0.1 acre.
19. Public transportation projects proposed for authorization by these RPs that would
potentially result in the destruction or alteration of Essential Fish Habitat (EFH) are
subject to the consultation requirements of the Magnuson-Stevens Fishery
Conservation and Management Act. For such projects, the LFA is responsible for
consultation with the National Marine Fisheries Service (NMFS).
20. Endangered Species:
a. Unless the LFA determines that a survey is not required for a specific project, the
Applicant shall conduct an endangered species survey of the "permit area," and "action
area," which may include downstream reaches of flowing streams that might be
impacted by project construction (sedimentation, increased stormwater, etc.). Surveys
shall be performed in accordance with the ESA. Based on survey results, if the LFA
determines that a proposed project may affect a listed species, the LFA will conduct
Section 7 consultation in accordance with the ESA.
b. Authorization of an activity by these RPs does not authorize the "take" of
threatened or endangered species, or adverse modification of critical habitat, as defined
in the ESA. In the absence of an ESA Section 10 Permit, a Biological Opinion with
"incidental take" provisions, etc., non-lethal or lethal "take" of protected species or
adverse modification of designated critical habitat would be in violation of the ESA.
Information on the location of threatened and endangered species and their critical
habitat can be obtained from the FWS web-page at http://ecos.fws.gov/ipac/ and the
NMFS web-page at http://www.nmfs.noaa.gov/prot_res/eashome.html.
9
c. If while accomplishing an activity authorized by these RPs, threatened or
endangered species are encountered, the Permittee shall immediately stop work and
notify the LFA. The LFA will notify FWS and/or NMFS, as appropriate.
d. If prior to initiating or during completion of work authorized by these RP(s), new
species or critical habitat is federally listed, and the newly listed species or critical
habitat is known to be present in or near the project area, the Permittee shall contact
the LFA. In such cases, if authorized work has not been initiated, the Permittee will not
begin work until notified by the LFA to do so.
e. Activities conducted in the main stem of the following listed Hydrologic Unit Code
(HUC) sections of the Savannah (0306010606), Broad (0306010401 and 0306010403),
Hudson (0306010402), Oconee (0307010202 and 0307010208), and Ocmulgee
(0307010313) Rivers must avoid gravel patches that serve as spawning areas for
anadromous and/or catadromous fish species. In-water activities in and within 0.25 mile
up and downstream of these spawning areas must be avoided to the maximum extent
practical, during spawning seasons and egg development. Spawning season for the
robust redhorse occurs between March 1 and July 1 of each year, in the Broad and
Hudson Rivers. Spawning seasons for sturgeon and robust redhorse occur between
January 16 and June 31 and August 16 and November 16 of each year, in the
Savannah, Oconee, and Ocmulgee Rivers. During PCN review, FWS and/or NMFS will
notify the Corps if a proposed project may be located in or near an important spawning
area. For these projects, the Corps will place appropriate special conditions in the RP
verification letter to the Permittee that are necessary to protect fish spawning and
spawning areas. Activities that result in the physical destruction (e.g., excavation,
discharge of fill, sedimentation, or other alteration) of an important spawning area are
not authorized by these RPs. Designated HUC for the U.S. can be found at this link:
https://water.usgs.gov/GIS/huc.html
21. Cultural Resources:
a. Applicants intending to use these RPs shall have a qualified professional conduct
a Phase I Cultural Resources Survey of the project area, in accordance with NHPA, if
required. Information on identified cultural resources may be available in the Georgia
Archaeological Site Files, at http://archaeologylab.uga.edu/gasf/. If cultural resources
are located on or near a proposed project area, the lead federal agency will conduct
consultation in accordance with the NHPA. For such projects, the Corps cannot verify
the project is authorized by these RPs until after the LFA makes its effect determination
and completes consultation.
b. If any previously unknown historic or archeological resource is discovered while
accomplishing an activity authorized by these RPs, the Permittee shall immediately stop
work and notify the LFA. The LFA will then determine if such a previously unidentified
resource requires consultation pursuant to the NRHP, and initiate consultation if
required.
10
22. Best Management Practices:
a. Activities in waters of the U.S. that serve as breeding areas for migratory birds
must be avoided to the maximum extent practicable.
b. No activity may use unsuitable material (e.g., trash, debris, car bodies, asphalt,
etc.). Material used for construction or discharged must be free from toxic pollutants in
toxic amounts (see section 307 of the Clean Water Act).
c. Heavy equipment working in freshwater wetlands, tidal marsh, mudflats, and
similar aquatic areas must be placed on mats, or other measures must be taken to
minimize soil disturbance.
d. All structures and fills shall be properly maintained to ensure public safety.
e. Borrow sites or sites for stockpiling fill dirt are prohibited within 200 feet of streams
or in any other area of the project site where storm water runoff would likely result in
increased stream sedimentation.
f. Equipment storage, equipment maintenance, supply storage, and use of
pesticides, herbicides, and/or other chemicals should not occur within the 100-year
floodplain or 200 feet from the stream banks or wetland edge, whichever is greater. All
storage and maintenance areas should be protected with secondary containment.
g. Work must be accomplished so that wet (uncured) concrete, concrete curing
water, or flowable fill does not contact surface waters.
h. All contractors, subcontractors, and other personnel performing authorized work
will be made fully aware of all applicable terms and conditions.
i. For new construction, consider the use of bridge designs that span the stream/
river, including pier or pile-supported spans, or designs that use a bottomless arch
culvert with a natural stream bed, which do not hinder the free passage of all life stages
and/or spawning of fish.
j. Where practicable, consider the use of bank stabilization methods that are
beneficial to fish and wildlife (e.g., soil bioengineering or biotechnical design, root wads,
large woody debris, etc.).
k. Avoid the use of plastic monofilament mesh slope matting. Plastic monofilament
material is known to ensnare snakes, other terrestrial and aquatic species and
commonly leads to mortality. The Permittee should consider the use of alternative
natural fibers (e.g., coir, jute, wood fiber, etc.).
l. Where revegetation of temporarily impacted waters of the U.S. is required, the
Permittee will use of native plant species, appropriate to the region and project site.
11
m. For projects where stormwater would drain to a stream or wetland consider
additional water quality protection through implementation of the Runoff Reduction
performance standard, found in the Georgia Stormwater Management Manual
(https://atlantaregional.org/georgia-stormwater-management-manual/). The Coastal
Supplement to this manual should be used in Georgia's eleven coastal counties
(Chatham, Bryan, Liberty, McIntosh, Glynn, Camden, Long, Effingham, Wayne,
Brantley, and Charlton Counties).
n. In counties that commonly use de-icers for roads or bridges, the use of bridge
scuppers that directly discharge stormwater to streams should be minimized, except
where necessary for safety.
VI. WATER QUALITY CERTIFICATION (WQC) AND GEORGIA COASTAL
MANAGEMENT PROGRAM (GCMP) CONCURRENCE:
1. Tidal waters regulated by CRD are located in the eleven coastal counties (i.e.,
Chatham, Bryan, Liberty, McIntosh, Glynn, Camden, Long, Effingham, Wayne, Brantley,
and Charlton Counties), and generally coincide with the location of tidal waters of the
United States that are regulated by the Corps under Section 10 of the Rivers and
Harbors Act. The map attached at Appendix D depicts the furthest upstream location
on the major rivers on the coast Georgia, where tidal waters are located.
2. For RPs 30, 31, 32, and 33, GDNR issued a conditional WQC and conditional
concurrence with the federal consistency determination under the GCMP, pursuant to
the Coastal Zone Management Act, as follows:
a. For non-notifying use of RP 30 and 31 (i.e., no PCN required) that involve
projects in tidal waters, the Applicant must submit the GDNR Notification Form
(Appendix D) to CRD, and to EPD, a minimum of 30 days prior to initiating authorized
work. [NOTE: For uses of RP 30 and 31 requiring submission of a PCN, the GDNR
form is not required.]
b. For non-notifying use of RP 30 and 31 (i.e., no PCN required) that involve
projects in non-tidal waters, the Applicant must submit the GDNR Notification Form to
EPD, a minimum of 30 days prior to initiating authorized work. [NOTE: For uses of RP
30 and 31 requiring submission of a PCN, the GDNR form is not required.]
c. For RPs 32 and 33, EPD issued conditional WQC and CRD concurred with federal
consistency under GCMP. However, on a case-by-case basis EPD may revoke WQC
for the proposed, project-specific use of these RPs, and require project-specific WQC
concurrence; and CRD may revoke GCMP concurrence for a proposed, project-specific
use of these RPs, and require project-specific CZMA concurrence.
12
3. For uses of RP 34 on projects that involve improvements to existing public
transportation projects, EPD issued conditional WQC and CRD concurred with federal
consistency under GCMP. However, on a case-by-case basis EPD may revoke WQC
for the proposed, project-specific use of these RPs, and require project-specific WQC
concurrence; and CRD may revoke GCMP concurrence for a proposed, project-specific
use of these RPs in the eleven coastal counties, and require project-specific CZMA
concurrence. Use of RP 34 in non-coastal counties does not require GCMP
concurrence or notification to CRD.
4. For uses of RP 34 on projects that involve construction of new public transportation
projects, CRD denied GCMP concurrence in all areas of the eleven coastal Georgia
counties; and EPD denied WQC. CRD and EPD will review PCNs submitted for these
proposed use of RP 34 in the eleven coastal counties, and on a case-by-case basis
provide GCMP concurrence and issue WQC, if appropriate.
5. For RP 35, CRD denied GCMP concurrence in all areas of the eleven coastal
Georgia counties; and EPD denied WQC. CRD and EPD will review PCNs submitted
for use of RP 35 in the eleven coastal counties, and on a case-by-case basis provide
GCMP concurrence, and issued WQC, if appropriate. Use of RP 35 in non-coastal
counties does not require a project-specific GCMP concurrence or WQC.
6. For all proposed uses of RP 35 in tidal waters, for proposed uses of RP 34 that
involve construction of new roads in tidal waters, or for proposed, project-specific uses
of RPs 30, 31, 32, 33, or 34, for which CRD revokes GCMP certification and EPD
denies WQC, the Corps will complete its review, and if appropriate, issue a provisional
verification letter to the Permittee for use of the RP. All Corps' provisional verification
letters will include the following paragraph: "The Georgia Department of Natural
Resources, Coastal Resources Division denied Georgia Coastal Management Program
(GCMP) Certification, pursuant to the Coastal Zone Management Act, for use of the
Regional Permit; and Georgia Environmental Protection Division denied Water Quality
Certification (WQC) pursuant to Section 401 of the Clean Water Act. This letter is the
U.S. Army Corps of Engineer's provisional verification for your use of the Regional
Permit, and does not authorize work in waters of the United States. You must obtain
GCMP Certification and WQC for your project and submit a copy of these certifications
to the Corps, prior to initiating work."
VII. PRE-CONSTRUCTION NOTIFICATION (PCN) REQUIREMENTS:
1. For uses of these RPs on sites located in the eleven coastal counties, the PCN must
include a request for verification as to whether the project site is subject to the Corps'
jurisdiction under Section 10 of the Rivers and Harbors Act.
2. A PCN is required for any project proposed in a State designated primary or
secondary trout stream.
13
3. A PCN is required for any project proposed within 2,000 feet of a National Wildlife
Refuge, any National Park Service Property, a National Estuarine Research Reserve, a
Georgia State Park or an approved mitigation bank.
4. The Applicant shall submit all PCNs to the U.S. Army Corps of Engineers, Attention:
Regulatory Branch, 100 West Oglethorpe Avenue, Savannah, Georgia 31401.
5. The Applicant shall submit all PCNs to EPD in accordance with the requirements of
Appendix E. The Applicant shall submit all PCNs for projects proposed in the above
listed eleven coastal counties, to CRD, in accordance with the requirements of
Appendix E.
6. For the purposes of submitting PCNs for use of these RPs, all documentation of
stream impacts must be calculated and described in linear feet, with no use of tenths,
hundredths or thousandths of linear feet. Round all tenths, hundredths or thousandths
of linear feet to the nearest linear foot.
7. The following information must be submitted for a PCN to be considered complete
for processing:
a. A completed Pre-Construction Notification Check-List (Appendix F).
b. A project description, to include: the basic purpose of the proposed project; direct
and indirect adverse effects to and losses of aquatic resources; for linear projects, a
brief description of the logical termini; for proposed new work on existing projects, a
description/discussion of the existing project; for widening and new alignment projects,
a summary of alternatives considered, and avoidance and minimization measures.
c. For all proposed uses of RP 34, the PCN shall include information concerning the
basic project purpose, alternatives considered, and aquatic resource avoidance and
minimization measures.
d. For uses of RP 35, documentation of compliance with the requirements of Special
Condition 4, and that the project was coordinated with the state and federal resource
agencies, and the Corps has determined that the project is the LEDPA.
e. A request for verification of on-site aquatic resources, consistent with Regulatory
Guidance Letter 16-01; or prior Corps verification of aquatic resources.
f. An endangered species survey report, or documentation of the LFA's
determination pursuant to the ESA.
g. A cultural resources survey report, or documentation of the LFA's determination
pursuant to the NHPA.
14
h. Plan and section view drawings of the project showing the dimensions of the project,
with the streams, wetlands, and other waters of the U.S. that would be impacted. Plans
should also include an illustration of the existing stream dimensions at proposed crossings.
i. A compensatory mitigation plan, if required.
k. For projects that involve in-stream temporary construction activities (i.e., jetty,
bulkhead, cofferdam, or similar structure) where stream or river constriction would be
greater than 25% of the cross sectional area of the critical flow:
(1) A description of how structure(s) will be used and/or staged.
(2) A plan sheet for the project area clearly defining the location of the proposed
structure(s), size (length and width) of the structure(s), the approximate edge of bank,
and the thalweg. For staged projects, a plan sheet for each stage.
(3) A time table for the duration for each stage and the total duration of all stages.
(4) An elevation sheet for each stage, showing the normal stream/river elevation,
the 50-year flood stage elevation, the 100-year flood stage elevation, and the top of
structure elevation.
(5) Estimated natural stream/river flow velocity, and estimated stream/river flow
velocity at each structural stage: at the 2 year storm; at the 5 year storm event; and
when water elevation is at the top (but not overtopping) the structure.
(6) The bank full width of the stream/river at the structure location and the
structure width for each stage.
(7) A description of stream/river bank substrate and stability, stream channel
substrate and stability, and any plans for the control of potential or anticipated project
induced channel scour and/or bank erosion.
(8) Plan for submission of a post-project compliance report to the Corps
document, stage duration, total duration, and that project area restoration and
revegetation, if applicable.
j. For projects that involve installation of a culvert in a perennial stream, the following
information is required: (Note: Diagrams and pictures of appropriate and inappropriate
culverted stream crossings are in attached Appendix C.)
(1) Culvert type and size.
(2) Depth the culvert inlet/outlet will be embedded in the stream bottom.
(3) Designed culvert slope along the stream channel.
15
(4) A profile of the stream bottom (longitudinal profile) beginning at least 50 feet
upstream of the culvert inlet and continuing at least 50 feet downstream of the culvert
outlet. Profile measurements shall begin at the head of a riffle and end at the head of a
riffle. The change in elevation from head of riffle to head of riffle can be used for the
designed slope.
(5) One cross-sectional scale diagram of the stream channel and banks. For new
culverts, the cross-section will be measured at the middle of the proposed culvert
location. For culvert replacement or extensions, the cross-section will be measured
approximately 100' upstream of the project site. The cross-sections shall depict the
stream width and height at the current water elevation, bank-full elevation and floodplain elevation. The X and Y axis on this diagram must be at the same scale.
(6) A scale cross-sectional diagram showing proposed as-built conditions,
including location of the culvert in the channel, channel bottom elevation, road surface
and areas of cut and fill. This diagram shall represent the middle cross-section. The X
and Y axis on this diagram must be at the same scale.
k. For projects that involve road-widening or other activities that would result in the
relocation or modification of an aerial or buried utility line located perpendicular or
parallel to the roadway, the PCN shall include: the utility line owner's name, and
contact information; verification that the utility line owner is aware of the proposed
roadway project; and general information concerning proposed utility line relocation.
VIII. PCN PROCESSING: Within 30 calendar days of receipt of a PCN package, the
Corps will determine if it is complete for processing; and if incomplete, the Corps will
notify the Applicant of additional information needed to complete the PCN. Once the
Corps determines a PCN to be complete, it will be coordinated with FWS, NMFS, EPA,
EPD, and if applicable CRD. The Corps initiates PCN coordination with the resource
agencies by email, on Friday of each week, with a summary of complete PCNs received
that week. The resource agencies have 10 calendar days from receipt of the Friday
email to notify the Corps if they intend to provide substantive, project-specific
comments; and request a copy of the complete PCN package. If a resource agency
requests a copy of the PCN, the agency will have an additional 15 calendar days to
provide comments (25 total days from receipt of the Friday email). The Corps will fully
consider agency comments received within this specified time frame; and document the
administrative record regarding how resource agency concerns and comments were
considered. If an agency does not contact the Corps within 10 calendar day of receipt
of the Friday email, the agency has no comments on the project. Within 45 calendar
days of receipt of a complete PCN the Corps will complete its review and notify the
Applicant by letter concerning whether a proposed project qualifies for authorization
under these RPs. Applicants shall not begin work on a proposed project until after
receipt of the Corps' letter verifying that a project is authorized by RP.
16
IX. FURTHER INFORMATION:
1. Congressional Authorities: Authorization to undertake the activities described above
are pursuant to Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of
the Clean Water Act (33 USC 1344).
2. Limits of this authorization:
a. The RPs do not obviate the need to obtain other federal, state or local
authorizations required by law.
b. These RPs do not convey any property rights, either in real estate or material, or
any exclusive privileges; nor do the RPs authorize any injury to property or invasion of
rights or any infringement of federal, state, or local laws or regulations.
c. The RPs do not authorize injury to the property or rights of others.
d. The RPs do not authorize interference with existing or proposed federal projects.
3. Limits of Federal Liability. In issuing these RPs, the Federal Government does not
assume any liability for the following:
a. Damages to permitted projects or uses thereof as a result of other permitted or
unpermitted activities or from natural causes.
b. Damages to permitted projects or uses thereof as a result of current or future
activities undertaken by or on behalf of the United States in the public's interest.
c. Damages to person, property or to other permitted or unpermitted activities or
structures caused by the activities authorized by these RPs.
d. Design or construction deficiencies associated with permitted work.
e. Damage claims associated with any future modification, suspension, or revocation
of these RPs.
4. Reevaluation of Permit Decision. The Corps may reevaluate its decision on any
activity authorized by these RPs at any time the circumstances warrant. Circumstances
that would require a reevaluation include, but are not limited to, the following:
a The Permittee's failure to comply with the terms and conditions of the RPs.
b. The information provided by the Applicant in support of a PCN proves to be false,
incomplete or inaccurate.
17
Northern and Southern Georgia Counties
Stream and Wetland Impact Limits
Regional Permits 34 and 35
Dade
Catoosa
Fannin
Murray
Whitfield
Walker
Gilmer
Floyd
Pickens
Paulding
Haralson
Dawson
Cherokee
Bartow
Polk
Carroll
Pike
Butts
Lamar
Taylor
Muscogee
Marion
Chattahoochee
Webster
Terrell
Sumter
Clay
Calhoun
Lee
Dougherty
Mitchell
Miller
Seminole
Glascock
Laurens
Dodge
Grady
Thomas
Jeff Davis
Irwin
Coffee
Candler
Tattnall
Bulloch
Cook
Bryan
Long
Liberty
Wayne
Bacon
McIntosh
Pierce
Brantley
Glynn
Ware
Clinch
Lowndes
Effingham
Evans
Appling
Atkinson
Berrien
Brooks
Screven
Telfair
Tift
Colquitt
Jenkins
Treutlen
Lanier
Decatur
Burke
Jefferson
Montgomery
Toombs
Wheeler
Ben Hill
Baker
Early
Richmond
Emanuel
Wilcox
Turner
Worth
McDuffie
Johnson
Bleckley
Pulaski
Crisp
Randolph
Hancock
Wilkinson
Houston
Dooly
Stewart
Quitman
Peach
Columbia
Warren
Twiggs
Macon
Schley
Taliaferro
Washington
Bibb
Crawford
Talbot
Greene
Lincoln
Wilkes
Baldwin
Jones
Monroe
Elbert
Oglethorpe
Putnam
Jasper
Upson
Harris
Clarke
Morgan
Newton
Henry
Hart
Madison
Oconee
Rockdale
Spalding
Meriwether
Troup
Barrow
DeKalb
Fayette
Franklin
Banks
Walton
Clayton
Coweta
Habersham
Stephens
Jackson
Gwinnett
Fulton
Rabun
Hall
Forsyth
Cobb
Douglas
Heard
White
Lumpkin
Gordon
Chattooga
Towns
Union
Charlton
Camden
Echols
Appendix A
Chatham
Anadromous Fish Waters in Georgia
1. Savannah River from the Atlantic Ocean to the Augusta Diversion Dam, including portions of
Ebeneezer, Brier and Butler Creeks. Anadromous fish restoration is in progress on the
Savannah River and the limit of anadromous fish waters may be extended to include Stevens
Creek and the Savannah River to Thurmond Dam. Currently there is limited upstream passage
through the lock at New Savannah Bluff Lock and Dam.
2. Ogeechee River from Ossabaw Sound to the 1-20 Bridge, including portions of Black, Mill,
Ogeechee, Horse, Williamson Swamp, and Rocky Comfort Creeks.
3. Canoochee River from its confluence with the Ogeechee River and its upper branches,
including Lotts, and Little Lotts Creeks above the 1-16 Bridge.
4. Medway River from St. Catherines Sound including Mt. Hope Creek.
5. North Newport River from St. Catherines Sound, including lower portions of Peacock Creek.
6. South Newport River from Sapelo Sound to the Long-McIntosh County line.
7. Darien River from Doboy Sound to include Cathead Creek.
8. Altamaha River from the Atlantic Ocean to its confluence with the Oconee/Ocmulgee Rivers,
including portions of Doctor, Penholoway, Beards, Tenmile, and Cobb Creeks.
9. Ohoopee River from its confluence with the Altamaha River to the US 319 bridge near
Wrightsville, including portions of Rocky and Pendleton Creeks, and Little Ohoopee River to the
U.S. 319 Bridge.
10. Oconee River from its confluence with the Altamaha River to the Lake Sinclair Dam, including
portions of Turkey, Rocky, Big Sandy, Commissioner, and Buffalo Creeks.
11. Ocmulgee River from its confluence with the Altamaha and Oconee rivers to the East Juliette
hydropower dam, including portions of Horse/Alligator, House, Cedar, Bluff, Big, Big Indian,
Echeconnee, and Tobesofkee Creeks.
12. Litt le Ocmulgee River from its confluence with the Ocmulgee River to the dam at Little
Ocmulgee Lake in McRae, including portions of Sugar, and Alligator Creeks.
13. Brunswick River from St. Simons Sound, including portions of Turtle, and Buffalo Rivers.
14. Satilla River from St. Andrew Sound to the GA 158 Bridge west of Douglas, including
portions the Alabaha River and White Oak, Buffalo, Big Satilla, Little Satilla, Colemans, Bishop,
Little Hurricane, Hog, Seventeen Mile, Red Bluff, and Pudding Creeks.
15. Little Satilla River from Jekyll Sound to the U.S. 17 bridge.
16. St. Mary's River from the Atlantic Ocean to near the Florida/Georgia border at the
Highway 2/94 bridge, including portions of South Prong, and Middle Prong.
17. Chattahoochee River from Lake Seminole to George W. Andrews Lock and Dam.
APPENDIX B
Culvert Designs that Restrict Movement of Fish and other Aquatics
Perched Culverts: A perched culvert's downstream end hangs above the stream bottom, so that water
leaving the culvert forms a waterfall at the culvert lip. Perching can occur when culverts are installed on
the stream bottom, rather than imbedded, or from channel scour caused by an undersized culvert.
Poorly-sized or Installed Culverts: Undersized culverts restrict stream flow, particularly during floods.
Water exits at a high velocity, causing channel and bank erosion. Overly-wide culverts spread stream
flow out so depths are too shallow for many fish and other aquatic organisms to swim or move through.
Multiple Pipe Culverts: Culverts with two or more widely-spaced pipes are prone to clogging, which
may inhibit fish movement; increase water velocity in the remaining pipes; cause flooding into roadside
ditches, resulting in problems for roadways; and cause water to scour the channel banks, causing bank
erosion and increased maintenance costs.
APPENDIX C
Aquatic-Passage Friendly Culvert Designs
Bottomless culverts may be a good alternative for fish passage where foundation conditions allow their
construction and width criteria can be met. Culverts should be designed to meet appropriate hydraulic
capacity and structural integrity criteria. Several methods exist for designing culverts for fish passage,
including methods that focus on hydraulic design and stream simulation. The recommendations below
borrow from, but do not replace, these more rigorous culvert design protocols. Culverts designed to
facilitate movement of aquatic species should:
Have a width equal to or slightly greater than the average streambed width
Be installed at a relatively flat gradient
Be embedded below the channel bed at least 20% of the culvert's diameter or rise
Provide adequate flood capacity with extra culverts at bankfull elevation or in the floodplain.
Bottomless or embedded culverts wide enough to carry baseflows without altering stream depth (i.e.,
width equal to or slightly greater than the average channel width).
The culvert is installed at a relatively
flat gradient to allow substrate to
colonize the culvert's interior and
maintain natural flow velocity.
Culverts, set at bankfull elevation (top) or with baffles
constructed at bankfull height carry flood waters but do not
overwiden the channel at baseflows.
APPENDIX C
EXAMPLE DIAGRAMS
PROPER CULVERT INSTALLATION
APPENDIX C
APPENDIX C
LIMITS OF TIDAL WATERS IN GEORGIA
Savannah River: Ebhenezer Landing, RM 49.5
Ogeechee River: Morgan's Bridge
Canoochee River: Savage Creek Mouth
Altamaha River: Fort Barrignton, RM 42
Satilla River: Big Oak & Limerock, RM 67
St. Marys River: Trader Hill
U.S. Army Corps of Engineers
Savannah District
Savannah, GA
k
j
k
j
k
j
k
j
k
j
k
j
0
0
5
5
10
10
20
30
20
40
Kilometers
30
40
Miles
µ
Appendix D
Georgia Department of Natural Resources
Requirements and Notification Procedures
Regional Permits 30, 31, 32, 33, 34, and 35
State of Georgia Buffer Requirements. Regional Permit (RP) authorized projects may require a
variance from the Georgia Environmental Protection Division (EPD) prior to conducting land
disturbing activities or placement of materials within the State-mandated buffer (O.C.G.A. 12-76(b)(15) of The Erosion and Sedimentation Act of 1975). Please visit Georgia EPD's website
(http://www.gaepd.org/), or contact Georgia EPD at (404) 675-6240 or (912) 264-7284 (Coastal
District), for further guidance on buffer determinations and variances. If Georgia EPD or the
appropriate Local Issuing Authority (LIA) has determined that a buffer variance is required for a
project, provide the Georgia EPD assigned buffer variance application file number with your
notification to Georgia EPD. If Georgia EPD or the appropriate LIA has determined that a buffer
variance is not required for the project, submit the determination letter or record of
correspondence received from the Georgia EPD or LIA with your notification to Georgia EPD.
Notification Requirements. For uses of RPs requiring submission of a Pre-Construction
Notification (PCN) to the Savannah District prior to commencing work in waters of the United
States (US), a copy of the PCN with project plans must also be submitted to the Georgia
Department of Natural Resources (DNR), Environmental Protection Division (EPD) and, where
applicable, to the Georgia DNR, Coastal Resources Division (CRD). For RP authorized projects
that do not require submission of a PCN to the Savannah District, a completed copy of the
attached "Georgia Department of Natural Resources Notification Form" must be submitted to
Georgia EPD and, where applicable, to Georgia CRD, prior to commencing work.
Georgia DNR, Environmental Protection Division. For projects located in Georgia EPD's 24County Coastal District (Appling, Atkinson, Bacon, Brantley, Bryan, Bulloch, Camden, Candler,
Charlton, Chatham, Clinch, Coffee, Effingham, Evans, Glynn, Jeff Davis, Liberty, Long,
McIntosh, Pierce, Tattnall, Toombs, Ware and Wayne County), send PCNs and project plans or
Notification Forms to: Georgia DNR Environmental Protection Division, Coastal District,
Attention: Wetland Management Unit, 400 Commerce Center Drive, Brunswick, GA 315238251, Phone: (912) 261-3924, Fax: (912) 262-3160.
For projects in all other counties, send PCNs and project plans or Notification Forms to:
Georgia DNR Environmental Protection Division, Attention: Wetland Management Unit
4220 International Parkway, Suite 101, Atlanta, GA 30354-3902, Phone: (404) 675-1752 Fax:
(404) 675-6244.
Georgia DNR, Coastal Resources Division. For projects located in the 11-County Coastal Area
(Bryan, Brantley, Camden, Charlton, Chatham, Effingham, Glynn, Liberty, Long, McIntosh and
Wayne Counties), send PCNs and project plans or Notification Forms to: Georgia DNR Coastal
Resources Division, Attention: Habitat Management Program Manager, One Conservation Way,
Brunswick, Georgia 31520-8686, Phone: (912) 264-7218, Fax: (912) 262-3131.
APPENDIX E
GEORGIA DEPARTMENT OF NATURAL RESOURCES NOTIFICATION FORM
FOR USE OF REGIONAL PERMITS 30 AND 31 IN GEORGIA THAT DO NOT REQUIRE
PRE-CONSTRUCTION NOTIFICATION TO THE US ARMY CORPS OF ENGINEERS
This form must be completed and mailed, faxed or hand-delivered to the Georgia Department of
Natural Resources ("GDNR") Environmental Protection Division prior to starting construction under
a Regional Permit. For projects occurring in Bryan, Brantley, Camden, Charlton, Chatham,
Effingham, Glynn, Liberty, Long, McIntosh or Wayne counties, this form must also be mailed, faxed
or hand-delivered to the GDNR Coastal Resources Division prior to starting construction under a
Regional Permit. The Coastal Resources Division will contact you within 10 business days to inform
you whether coastal permits or permissions are required. Issuance of any required coastal permits
for work in tidally-influenced marshes or water bottoms will take longer, so you are urged to submit
this form early in the planning stages of your project. Do not begin work until you receive
confirmation that no coastal permit is required or you are issued a coastal permit.
USE OF REGIONAL PERMIT NUMBER(s) _________________________________________________
APPLICANT/OWNER________________________________ Date______________________________
Phone (hm/bus) __________________ FAX_________________ E-Mail_________________________
Address___________________________ City________________ State_____ Zip Code___________
AGENT/CONSULTANT________________________________________________________________
Phone (hm/bus) _________________________ E-Mail_______________________________________
Address ______________________City________________ State_____ Zip Code________________
PROJECT LOCATION/ADDRESS:_______________________________________________________
City____________________ County________________ Subdivision__________________ Lot _____
Latitude/Longitude (if known):__________________ Project Impacts (ft 2) _______ (acres) ________
Stream Impacts (LF) _________ Wetland Impacts (acres) ________
Type of Wetland: [ ] freshwater [ ] tidal marsh or saltwater [ ] unknown
Nearest Named Stream, River or Other Waterbody:________________________________________
This activity may require a variance from Georgia EPD prior to conducting land disturbance activities
or placing materials within the State-mandated buffer [see O.C.G.A. § 12-7-6(b)(15-16) of "The Erosion
and Sedimentation Act of 1975," and visit www.gaepd.org for more information]. Has Georgia EPD or
the appropriate Local Issuing Authority (LIA) determined whether or not a buffer variance is
required? Yes_____ No_____
If Georgia EPD or the appropriate LIA has determined that a buffer variance is NOT required for this
project, please attach a determination letter or record of correspondence from Georgia EPD or the
LIA to this form. If a buffer variance is required, please provide the buffer variance application
number: ______________________________________________________________________________
PROJECT DESCRIPTION______________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
APPENDIX E
US ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT
PRE-CONSTRUCTION NOTIFICATION (PCN) CHECK-LIST
2018 REGIONAL PERMITS 30, 31, 32, 33, 34 AND 35
APPLICANT_______________________________________ Date______________________________
Phone(hm/bus)___________________________ E-Mail_______________________________________
Address_____________________________ City__________________ State_____ Zip Code_________
AGENT/CONSULTANT________________________________________________________________
Phone(hm/bus)___________________________ E-Mail______________________________________
Address_____________________________City___________________ State_____ Zip Code________
PROJECT LOCATION_________________________________________________________________
___________________________________________________________________________________
City______________ County_____________ Latitude________________ Longitude_______________
Nearest Named Stream, River or Other Waterbody___________________________________________
Project Funding: Federal____________ State____________ County___________ City_____________
PROJECT DESCRIPTION (III 3.B) _______________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
PROJECT AREA AND JURISDCITIONAL WATERS IMPACT/LOSS INFORAMTION
PROJECT AREA
TEMPORARY IMPACTS PERMANENT LOSSES
Acres
Linear Feet
Acres
Linear Feet
Acres
Linear Feet
Project Area
N/A
N/A
N/A
N/A
N/A
Upland
N/A
N/A
N/A
N/A
N/A
Wetlands
N/A
N/A
N/A
Open Waters
N/A
N/A
N/A
Perennial Streams
Intermittent Streams
Ephemeral Streams
Man-Made Ditches
APPENDIX F
SUPPLEMENTAL INFORMATION. The questions below concern regulations, terms, and/or special
conditions (SC) that may be applicable to a project proposed for authorization by these RPs. For each
YES answer, the PCN must include information necessary to document that applicable regulations,
terms, and/or SCs will be met.
1. Is the project funded by local, state or federal government? (SC 1)
Yes______ No______
2. Does the project involve construction of a bridge over navigable waters? (SC 7) Yes______ No______
3. Does the project require 408 authorization? (SC 10)
Yes______ No______
4. Will the project impact anadromous fish waters? (SC 11)
Yes______ No______
5. Is the project located in a designated floodplain or floodway? (SC 12)
Yes______ No______
6. Is a Georgia Stream Buffer Variance required for the project? (SC 14)
Yes______ No______
7. Does the project involve construction or replacement of a culvert? (SC 16)
Yes______ No______
8. Is compensatory mitigation required for the project? (SC 18)
Yes ______ No______
9. Are federally protected species present in the project area? (SC 19)
Yes______ No______
10. Has the Corps or FHWA made a Section 7 affect determination?
Yes______ No______
11. Are cultural resources located in or near the project area? (SC 20)
Yes______ No______
12. Has the Corps or FHWA made a Section 106 affect determination?
Yes______ No______
13. Is the project located in tidal wetlands? (SC VI)
Yes______ No______
14. Has a copy of the PCN been submitted to the Georgia CRD? (SC VII)
Yes______ No______
15. Has a copy of the PCN been submitted to the Georgia EPD? (SC VII)
Yes______ No______
16. Will EFH be impacted by the project? (Magnuson Stephenson Act)
Yes______ No______
17. Have proposed project related impacts to aquatic resources been
avoided to the maximum extent practicable? (Section 404(b)(1))
Yes______ No______
IMPORTANT NOTES: All maps and drawings that are attached to this PCN must be submitted on 8 ½ X 11inch paper. Supplemental maps and drawings larger than 8 ½ X 11 may also be submitted for clarity.
2
APPENDIX F