You can copy from here when filling out the rest of the page.
PROJECT NAME: Saben "SF" Tatum Road.
COUNTY: Fulton
NEAREST NAMED WATERWAY: Line Creek.
OVERALL PROJECT PURPOSE: Construction of an industrial warehouse facility.
PROJECT NAME: Saben "SF" Tatum Road.
COUNTY: Fulton
NEAREST NAMED WATERWAY: Line Creek.
OVERALL PROJECT PURPOSE: Construction of an industrial warehouse facility.
DEPARTMENT OF THE ARMY
U.S. ARMY CORPS OF ENGINEERS
SAVANNAH DISTRICT
1590 ADAMSON PARKWAY, SUITE 200
MORROW, GEORGIA 30260-1777
Regulatory Branch
SAS-2016-01024
October 16, 2018
JOINT PUBLIC NOTICE
Savannah District/State of Georgia
The Savannah District has received an application for a Department of the Army
Permit, pursuant to Section 404 of the Clean Water Act (33 U.S.C. § 1344), as follows:
Application Number: SAS-2016-01024
Applicant: Mr. Mark Shugart
1380 Collingsworth Road
Palmetto, Georgia 30268
Agent:
Mr. Stephen Modica
Gaia Environmental Consulting, LLC
109 Birchwood Pass
Canton, Georgia 30114-7752
Location of Proposed Work: The project site is located northeast of the intersection
of Johnson Road and Tatum Road near the City of Palmetto, Fulton County, Georgia
(latitude: 33.5249, longitude, -84.6323). The property is located within the Upper Flint
River watershed, Hydrologic Unit Code: 0313000502, and the nearest named water
body is Line Creek.
Description of Work Subject to the Jurisdiction of the U.S. Army Corps of Engineers:
The applicant proposes to construct an industrial warehouse facility that will result in
impacts to 560 linear feet of intermittent stream and 0.07 acre of wetland. The
intermittent stream will be impacted from the footprint of the proposed warehouse, and
will be placed in a 12-inch French Drain system. The wetland will be filled with earthen
material resulting from site grading requirements. Specifically, the project as proposed
will include one, 1,928,950 square-foot single-story warehouse, two water quality ponds
and one detention pond, 600 employee parking spaces, and 694 trailer spaces. To
mitigate for adverse impacts to aquatic resources, the applicant has proposed to
purchase 2,721.6 stream credits and 0.4 wetland credits from a U.S. Army Corps of
Engineers approved mitigation bank within the primary service area of the project.
BACKGROUND
This Joint Public Notice announces a request for authorizations from both the U.S.
Army Corps of Engineers and the State of Georgia. The applicant's proposed work may
also require local governmental approval.
STATE OF GEORGIA
Water Quality Certification: The Georgia Department of Natural Resources,
Environmental Protection Division, intends to certify this project at the end of 30 days in
accordance with the provisions of Section 401 of the Clean Water Act, which is required
for a Federal Permit to conduct activity in, on, or adjacent to the waters of the State of
Georgia. Copies of the application and supporting documents relative to a specific
application will be available for review and copying at the office of the Georgia
Department of Natural Resources, Environmental Protection Division, Watershed
Protection Branch, 2 MLK Jr. Drive, Suite 418, Atlanta, Georgia 30334, during regular
office hours. A copier machine is available for public use at a charge of 10 cents per
page. Any person who desires to comment, object, or request a public hearing relative
to State Water Quality Certification must do so within 30 days of the State's receipt of
application in writing and state the reasons or basis of objections or request for a
hearing. The application can be reviewed in the Savannah District, U.S. Army Corps of
Engineers, Regulatory Division.
State-owned Property and Resources: The applicant may also require assent from
the State of Georgia, which may be in the form of a license, easement, lease, permit or
other appropriate instrument.
U.S. ARMY CORPS OF ENGINEERS
The Savannah District must consider the purpose and the impacts of the applicant's
proposed work, prior to a decision on issuance of a Department of the Army Permit.
Cultural Resources Assessment: A Phase 1 Cultural Resources Survey was
completed by R.S. Webb and Associates on October 13, 2016. Findings from the
survey included three structures, one structure complex, and one isolated lithic scatter.
2
The Georgia Department of Natural Resources Historic Preservation Division concurred
with the Corp's "no potential to cause effect" determination by letter on May 25, 2017.
Endangered Species: Pursuant to Section 7(c) of the Endangered Species Act of
1973, as amended (16 U.S.C. § 1531 et seq.), we request information from the U.S.
Department of the Interior, Fish and Wildlife Service, the U.S. Department of
Commerce, National Oceanic and Atmospheric Administration, National Marine
Fisheries Service; or, any other interested party, on whether any species listed or
proposed for listing may be present in the area. This project was informally coordinated
with the U.S. Fish and Wildlife Service (USFWS) for Gulf Moccasinshell (Medionidus
penicillatus), Oval Pigtoe (Pleurobema pyriforme), Shinyrayed Pocketbook (Hamiota
subangulata), and Purple Bankclimber (Elliptoideus sloatianus) on July 23, 2018. The
USFWS concurred with the Corp's "may effect, not likely to adversely effect"
determination for the above listed species.
Public Interest Review: The decision whether to issue a permit will be based on an
evaluation of the probable impact including cumulative impacts of the proposed activity
on the public interest. That decision will reflect the national concern for both protection
and utilization of important resources. The benefit, which reasonably may be expected
to accrue from the proposal, must be balanced against its reasonably foreseeable
detriments. All factors, which may be relevant to the proposal will be considered
including the cumulative effects thereof; among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, historic properties, fish and
wildlife values, flood hazards, flood plain values, land use, navigation, shoreline erosion
and accretion, recreation, water supply and conservation, water quality, energy needs,
safety, food and fiber production, mineral needs, considerations of property ownership
and in general, the needs and welfare of the people.
Consideration of Public Comments: The U.S. Army Corps of Engineers is soliciting
comments from the public; federal, state, and local agencies and officials; Native
American Tribes; and other interested parties in order to consider and evaluate the
impacts of this proposed activity. Any comments received will be considered by the
U.S. Army Corps of Engineers to determine whether to issue, modify, condition or deny
a permit for this proposal. To make this decision, comments are used to assess
impacts on endangered species, historic properties, water quality, general
environmental effects, and the other public interest factors listed above. Comments are
used in the preparation of an Environmental Assessment and/or an Environmental
Impact Statement pursuant to the National Environmental Policy Act. Comments are
also used to determine the need for a public hearing and to determine the overall public
interest of the proposed activity.
Application of Section 404(b)(1) Guidelines: The proposed activity involves the
discharge of dredged or fill material into the waters of the United States. The Savannah
District's evaluation of the impact of the activity on the public interest will include
3
application of the guidelines promulgated by the Administrator, Environmental
Protection Agency, under the authority of Section 404(b) of the Clean Water Act.
Public Hearing: Any person may request, in writing, within the comment period
specified in this notice, that a public hearing be held to consider this application for a
Department of the Army permit. Requests for public hearings shall state, with
particularity, the reasons for requesting a public hearing. The decision whether to hold
a public hearing is at the discretion of the District Engineer, or his designated appointee,
based on the need for additional substantial information necessary in evaluating the
proposed project.
Comment Period: Anyone wishing to comment on this application for a Department
of the Army Permit should submit comments in writing to the Commander, U.S. Army
Corps of Engineers, Savannah District, Attention: Blake Brannon, 1025 Buford Dam
Road, Buford, Georgia 30518, no later than 30 days from the date of this notice.
Please refer to the applicant's name and the application number in your comments.
If you have any further questions concerning this matter, please contact Blake
Brannon, Project Manager, at (678) 422-6570.
Enclosures
1. Location Map
2. Aquatic Resources Map
3. Site Plan and Impact Figure
4
FIGURE
1 -
SITE VICINITY MA P
SABEN TATUM ROAD - MARK
Land Lots 131 & 132 of the ih District
City of Palmetto, Fulton County, Georgia
Gaia Project No. 2018-76
Envl r on m Ant R I
Co n ~ ul tl n o
109 Birchwood Pass, Canton, Georgia 30114-7752
N.T.S.
r
i
l
I
iI
i
I
i
I
~\
STREAM1
(1575 LF/0.60 ac.)
i
WETLAND B
(1.08 ac.)
WETLAND A
(0.19 ac.)
STREAM2
\
(1231 LF/0.35 ac.) )
)
I
~.;
ii
i
i
~I
I
i
I
\
Il
EPHEMERAL CHANNEL A
(530 LF/0.16 ac.)
PROJECT
MELBA
;
I
\i
PROJECT
MARK
I
i
i
I
j
i
i
i
i
EPHEMERAL CHANNEL S
(338 LF/0.03 ac.)
STREAM 3
232 LF (0.07 ac.)
STREAM 5
1014 LF (0.36 ac.)
I
EPHEMERALCHANNELC
(121 LF/0.02 ac.)
I
i
L_------
I
---
Figure4 -WOTUSMAP
STR -MELBA & MARK
~nd Lots 131 & 132 of the fh District
City of Palmetto, Fulton County, Georgia
Gaia Project No. 2018-50
Scale: 1= 100 {Plot Size: 36·48 Inches)
e aia
Env l ronmont· I Con:au l tlno
! \
\\\~
~,
STREAM4
94 LF ( 0.01 ac.)
t~
:::::. ~~
C
:s5'=~~
~~-...:~
11
EPHEMERAL CHANNELD
(76 LF/0.02 ac.)
·
5"~::;;::~ ~
l~f
1~·
1jl
/I
~j~~=i},t
. ii
-
,--- -
"-........._
~--..J/
JOHNSON RD.