The Corps is soliciting written comments on the proposed "Draft Monitoring Guidelines
& Performance Standards for Freshwater Wetlands and Non-Tidal Streams, U.S. Army
Corps of Engineers (Corps), Savannah District", dated November 8, 2018.
The Corps is soliciting written comments on the proposed "Draft Monitoring Guidelines
& Performance Standards for Freshwater Wetlands and Non-Tidal Streams, U.S. Army
Corps of Engineers (Corps), Savannah District", dated November 8, 2018.
DEPARTMENT OF THE ARMY
U.S. ARMY CORPS OF ENGINEERS
SAVANNAH DISTRICT
100 WEST OGLETHORPE AVENUE
SAVANNAH, GEORGIA 31401
November 8, 2018
Regulatory Branch
SAS-2017-00592
PUBLIC NOTICE
Savannah District
The U.S. Army Corps of Engineers, Savannah District, Regulatory Branch (Corps), is
proposing a new monitoring metrics and performance standards for evaluating stream
and wetland compensatory mitigation pursuant to Section 404 of the Clean Water Act
(33 USC 1344). This public notice is being distributed to all interested stakeholders to
solicit public input for consideration in the development of these monitoring metrics and
performance standards.
The Corps is soliciting written comments on the proposed "Draft Monitoring Guidelines
& Performance Standards for Freshwater Wetlands and Non-Tidal Streams, U.S. Army
Corps of Engineers (Corps), Savannah District", dated November 8, 2018. Once
finalized, these guidelines would be incorporated into the compendium of documents
that comprise the 2018 Standard Operating Procedure for Compensatory Mitigation,
dated April 27, 2018, and apply to all regulatory actions requiring the evaluation of
compensatory mitigation actions associated with mitigation banks, In-Lieu-Fee
mitigation projects, and permittee responsible mitigation sites. The period for submittal
of written comments will close 60 days from the date of this public notice.
BACKGROUND: The 2008 Mitigation Rule (Rule), [33 CFR 332.5 (a)], states, "The
approved mitigation plan must contain performance standards that will be used to
assess whether the project is achieving its objectives. Performance standards should
relate to the objectives of the compensatory mitigation project, so that the project can be
objectively evaluated to determine if it is developing into the desired resource type,
providing the expected functions, and attaining any other applicable metrics (e.g., acres
improved). In addition, the Rule states [33 CFR 332.6 (a)(1)], states, "Monitoring the
compensatory mitigation project site is necessary to determine if the project is meeting
its performance standards, and to determine if measures are necessary to ensure that
the compensatory mitigation project is accomplishing its objectives. The submission of
monitoring reports to assess the development and condition of the compensatory
mitigation project is required, but the content and level of detail for those monitoring
reports must be commensurate with the scale and scope of the compensatory
mitigation. The mitigation plan must address the monitoring requirements for the
compensatory mitigation project, including the parameters to be monitored, the length of
the monitoring period, the party responsible for conducting the monitoring, the
frequency for submitting monitoring reports to the district engineer, and the party
responsible for submitting those monitoring reports to the district engineer".
1
Pursuant to the regulation-required mitigation plan elements outlined above, the
Corps developed the draft monitoring metrics and performance standards to assist
project sponsors with the evaluation of both freshwater wetland and non-tidal stream
mitigation projects within the State of Georgia
COMMENTS: Anyone wishing to comment on this public notice should submit
comments in writing to the Commander, U.S. Army Corps of Engineers, Savannah
District, Regulatory Branch, Attention: Mr. Justin A. Hammonds, Post Office Box 528,
Buford, Georgia 30515, no later than 60 days from the date of this notice. Please refer
to project number SAS-2017-00592 in your comments.
If you have any further questions concerning this matter, please contact
Mr. Justin A. Hammonds, Mitigation Liaison at (678) 804-5227 or
Justin.A.Hammonds@usace.army.mil.
Enclosure
1. Draft Monitoring Guidelines & Performance Standards for Freshwater Wetlands and
Non-Tidal Streams, U.S. Army Corps of Engineers (Corps), Savannah District
2
Draft Monitoring Guidelines & Performance Standards
for Freshwater Wetlands and Non-Tidal Streams
U.S. Army Corps of Engineers (Corps), Savannah District
(Version 1.0, November 8, 2018)
I.
II.
III.
IV.
V.
VI.
VII.
VIII.
Introduction
General Monitoring Requirements
Evaluation of Normal Precipitation and Growing Season
Freshwater Wetland Monitoring
A. Vegetation Monitoring
B. Prevalence Index
C. Wetland Hydrology Monitoring
D. Large Woody Debris Monitoring
Non-Tidal Stream Monitoring
A. Vegetation Monitoring
B. Vegetation Monitoring In Streamside Vegetation Zones
C. Vegetation Monitoring In Riparian Zones
D. Stream Channel Geomorphology and Stream Hydrology Monitoring
E. Biological Monitoring
F. Stream Water Quality Monitoring
G. Large Woody Debris Monitoring
Freshwater Wetland Mitigation Performance Standards
Non-Tidal Stream Mitigation Performance Standards
References
Appendices
The U.S. Army Corps of Engineers, Savannah District (Corps) has selected the
Hydrogeomorphic (HGM) Approach and the Stream Quantification Tool (SQT) as the
frameworks for standardizing the calculation of mitigation credits for freshwater wetland
and non-tidal stream mitigation projects in Georgia. The Corps has developed both the
Freshwater Wetland HGM for Georgia (GA HGM) and the Georgia Interim SQT (GA
SQT) 1 in Microsoft Excel spreadsheet format which use selected metrics representing
each of the different functional categories outlined in the respective frameworks (i.e.,
HGM and SQT). The evaluation of each underlying measurement in the field is
converted to an index value, between 0.0 and 1.0, based on established performance
curves for each metric. The current performance curves have been developed from a
combination of available regional reference data, published ranges for the selected
The Stream Quantification Tool includes five different functional categories: hydrology, hydraulics,
geomorphology, physiochemical, and biology. In the development of the Georgia Interim SQT, the Corps
made the decision to remove the hydrology and physiochemical functional categories from the
standardized assessment of credit generation.
1
1
(Version 1.0, November 8, 2018)
variables and best professional judgment. The index values have been further informed
by input received during the stakeholder and peer review process. The resulting index
values for all parameters included in the evaluation are combined (generally as
arithmetic means) to produce a single overall index value between 0.0 and 1.0 for each
wetland and stream assessment area. The potential mitigation credit generated by a
project is then based on the difference between the pre-mitigation index value and the
projected post-mitigation index value, taking into account any corresponding difference
in wetland area (acres) and stream length (linear feet). The GA HGM and GA SQT are
available on the Regulatory In-Lieu Fee and Bank Information Tracking System
(RIBITS) website. Users are encouraged to download the latest version of the tools and
all accompanying user manuals and resource documents at the time of intended use, as
periodic updates to these documents are planned.
Users should be aware that there are additional requisite considerations for wetland and
stream mitigation projects in Georgia that are not integrated within the GA HGM and GA
SQT spreadsheets. The GA HGM and GA SQT components of a broader set of
requirements, including interim performance standards described herein, that the Corps
and Interagency Review Team (IRT) will use to evaluate the feasibility of freshwater
wetland and non-tidal stream mitigation proposals and to assess the performance of
freshwater wetland and non-tidal stream mitigation projects implemented in Georgia.
I.
General Monitoring Requirements
Monitoring of all freshwater wetland and non-tidal stream compensatory mitigation sites
must comply with the requirements in this section. The protocols detailed within these
guidelines apply to both baseline and post-construction monitoring activities.
A. A final as-built survey report must be submitted following the completion of all
mitigation activities in the Mitigation Work Plan, including planting, to document
post-construction conditions (i.e., Year 0). Note that an as-built survey does not
necessarily mean a single plan-view map; rather it is comprised of a
compendium of applicable maps, graphs, photos, tables, etc. that thoroughly
document the work performed on the site.
a. As-built survey reports should include pre-construction and postconstruction topographic maps documenting the locations and depths of
excavation and/or fill on the project site, if applicable.
b. As-built survey reports should include photographic documentation at all
proposed permanent monitoring stations (groundwater monitoring wells,
piezometers, stage recorders, biological sampling locations, etc.); a plan
view diagram of all permanent monitoring stations; a copy of the recorded
conservation easement and restrictive covenant (if not already provided to
the Corps); verification of the installation of conservation
easement/restrictive covenant boundary signage; and tabular vegetation
2
(Version 1.0, November 8, 2018)
c.
d.
e.
f.
g.
data (species, caliper size, number of stems planted, and, if applicable,
mapped planting zones for target vegetative communities).
Wetland acreage should be calculated based on the wetland area within
the metes and bounds of the site, as delineated using the 1987 US Army
Corps of Engineers Wetland Delineation Manual and applicable Regional
Supplement.
Any changes to the post-construction wetland acreage relative to the
acreage proposed in the Mitigation Work Plan must be documented and
explained in the as-built survey report.
Stream lengths should be calculated and reported using the stream
centerline, not the thalweg.
Any changes to the stream length relative to the channel length proposed
in the Mitigation Work Plan must be documented and explained in the asbuilt survey report.
As-built survey reports must be provided to the Corps and IRT within 90
days of completion of all mitigation activities on the site, as described in
the Mitigation Work Plan, for the construction milestone.
B. Post-construction monitoring will take place consistent with the schedule outlined
in Tables 1 and 2. General requirements for post-construction monitoring include
the following:
a. Data collection for the first annual monitoring event must take place no
fewer than eight (8) months following the date of the submittal of the asbuilt survey report;
b. The amount of time required to attain performance standards will vary by
target aquatic resource type, mitigation treatment, baseline site conditions,
the degree of pre-construction site preparation and post-construction site
management;
c. All interim performance standards must be fulfilled before the Corps, in
consultation with the IRT, will grant the Sponsor an interim mitigation
credit release;
d. Following the achievement of the final performance standards, final
mitigation credit determination will be based on site conditions at the time
the Sponsor chooses to request the final credit release. Final mitigation
credit determination must be requested within 15 years from the date of
the original as-built survey.
C. All annual monitoring data collected by the Sponsor, to be included in annual
monitoring reports, must also be provided to the Corps and IRT electronically in
one or more organized, unlocked, Microsoft Excel spreadsheets.
D. Unless otherwise specified in the Mitigation Work Plan or Instrument, monitoring
reports must be submitted for all years of the monitoring period. However,
annual monitoring reports may not include data for all performance standards
every year. Monitoring reports for each calendar year must be provided to the
3
(Version 1.0, November 8, 2018)
IRT for review no later than February 1st of the following year. General
requirements for monitoring reports include the following:
a. An executive summary that describes the overall monitoring results,
including hydrologic monitoring, vegetation monitoring, large woody debris
monitoring, geomorphological monitoring, water quality, and
macroinvertebrate monitoring (as applicable), areas of concern (e.g.
exotic/invasive vegetation, stream instability, nuisance herbivory, etc.) and
any adaptive management activities undertaken during the previous year
(e.g. supplemental planting, reconstruction or modification of structural
habitat features, etc.).
b. Results of any monitoring parameters required to demonstrate projectspecific performance standards.
c. Performance standards, as provided in the Mitigation Work Plan or in the
permit conditions, must be restated verbatim in each monitoring report.
d. Each monitoring report should include a discussion/presentation of the
current year's monitoring data in context with data collected during all
previous years. Summary tables must include summary data from all
previous years.
II.
Evaluation of Normal Precipitation and Growing Season
A. Precipitation
Hydrologic data and aquatic biological data should be presented in context with
measured precipitation collected during the monitoring period and normal
precipitation based on the most recent 30-year period of record. Sprecher and
Warne (2000) summarize the principal methods for assessing normal rainfall
conditions. Rainfall must be measured on-site to determine whether there has been
a departure from normal precipitation conditions during the monitoring period.
B. Growing Season
For compensatory mitigation, the presence of wetland hydrology during the growing
season is the general standard for wetland hydrologic monitoring. For the purposes
of assessing the duration of the growing season for wetland compensatory mitigation
sites, the Corps will utilize the median (50% long-term probability) long-term dates of
28°F air temperature reported in the NRCS WETS Tables.
III.
Freshwater Wetland Monitoring
A. Vegetation Monitoring
Vegetative communities of freshwater wetlands will be monitored separately from
those located in upland buffer zones. Wetland vegetative communities include all
areas within the delineated wetland boundary. Upland buffer vegetative
4
(Version 1.0, November 8, 2018)
communities extend from the outer boundary of the wetland vegetative community to
the outer boundary of the zone for which upland buffer mitigation credit is proposed
by the Sponsor.
Alternative vegetation planting and monitoring plans may be approved by the Corps,
in consultation with the IRT, on a case-by-case basis to accommodate specific goals
of the mitigation project. The following requirements apply to all freshwater wetland
mitigation projects that include planting of woody vegetation.
a. Vegetation monitoring should be conducted between August 1st and
October 31st, consistent with the schedule outlined in Table 1. To the
extent practicable, subsequent vegetation monitoring events should be
scheduled as near as possible to the same date(s) as previous monitoring
events.
b. The presence of exotic/invasive species (in all strata) on or immediately
adjacent to the mitigation site should be evaluated during each monitoring
event and noted in the monitoring reports. The reported presence of
invasive species should not be limited to coverage solely within permanent
or random vegetation monitoring plots.
c. A combination of permanent and random fixed-area plots should be used
to monitor wetland and upland buffer zone vegetation, as follows:
i. Plots should be distributed throughout the site and provide a
stratified, random coverage of all vegetation community types reestablished, enhanced, or preserved. Every mitigation treatment
area on the project site shall consist of one or more "monitoring
units" defined by either differing baseline conditions (e.g. soil type,
vegetative communities, hydrologic conditions, etc.) and/or
mitigation treatments (e.g. mitigation objectives, proposed
vegetative communities or hydrologic conditions, etc.). Each
monitoring unit must include both permanent and random
vegetation sampling plots. Note that spatially non-contiguous areas
with comparable soil/hydrologic conditions, mitigation treatment or
target condition will also comprise separate monitoring units.
ii. Permanent plots should comprise at least 50% of the total required
number of plots per monitoring unit. Random plots should be
established prior to each year of vegetation monitoring via random
selection from a grid overlain on each monitoring unit. No
vegetation sampling plot should overlap any portion of any other
vegetative plot. It is recommended that individual monitoring units
be subdivided into approximately equal areas equivalent in number
to the number of random plots to be established therein. Random
plots may then be established in each subdivision, thus ensuring a
spatially wide distribution of plots within each monitoring unit.
iii. Generally, there will be one vegetation sample plot per five (5)
acres of monitoring unit, but under no circumstance will there be
5
(Version 1.0, November 8, 2018)
fewer than two (2) sample plots in any single monitoring unit (1
permanent and 1 random).
iv. The Corps and IRT retain discretion to require supplemental
sample plots if portions of a monitoring unit appear to be
underperforming, and/or also if they are under-represented by
sample plots.
v. The location (GPS coordinates) of random plots must be identified
in the associated annual monitoring report, and the plots must be
marked in the field so they can be inspected by the IRT, if needed.
vi. Plot sizes for the determination of tree stem density and vigor
should be a minimum of 0.1 acre (0.04 ha). Refer to the
Prevalence Index discussion in Section III(B) for a description of
recommended vegetation sample plot design.
vii. For projects that include stream channels, fixed-area wetland plots
should not overlap the stream or the top of stream banks to
safeguard that vegetation monitoring data does not include
streambank live stakes.
d. Vegetation monitoring plots must cumulatively comprise a minimum 2%
area of each monitoring unit on the mitigation site. Exceptions may be
permissible on a case-by-case basis for very small monitoring units or for
large, homogeneous monitoring units. All exceptions to this requirement
shall be specifically justified in the approved Mitigation Work Plan.
e. Wetland vegetation monitoring data collected from the plots must include:
i. Within each permanent vegetative monitoring plot:
1. Tree/shrub species, height, identification as planted vs.
volunteer, and age (based on the year the stem was planted,
or first observed for acceptable volunteers); and,
2. When individual trees reach a height sufficient to measure
diameter at breast height (dbh; stem diameter at 4.5 feet
above ground surface), dbh must also be reported;
ii. Within each random vegetative monitoring plot:
1. Tree/shrub species and height; and,
2. When individual trees reach a sufficient height, dbh must
also be reported;
iii. For both permanent and random plots, all woody stems, including
exotic/invasive species, should be recorded. Exotic/invasive
species will not count toward success of performance standards.
f. Individual plot data must be provided separately for planted and volunteer
species. Plot data should be presented individually per plot, as well as
averaged among plots within individual monitoring units.
B. Prevalence Index
All permanent vegetation monitoring plots and all random vegetation monitoring
plots will include a series of five (5) nested, one-square meter herbaceous
6
(Version 1.0, November 8, 2018)
vegetation quadrats, consistent with the sample plot schematic drawings at
Appendix A. The "alternative herbaceous coverage quadrats" depicted on the
schematic drawings are only to be used if one or more pieces of large woody debris
lie within one or more primary herbaceous quadrats and comprise 10 percent
coverage of the primary quadrat(s).
Percent cover estimates of each species within the five herbaceous quadrats will be
used to calculate the Prevalence Index to assess the relative hydrophytic status of
the existing herbaceous vegetative cover and percent absolute cover of
exotic/invasive species in the herbaceous stratum. The Prevalence Index is a
weighted average wetland indicator status of all plant species in the sampling plot,
based on each species' abundance (absolute percent cover) and their assigned
indicator status (OBL = 1, FACW = 2, FAC = 3, FACU = 4, and UPL = 5) (Lichvar et
al., 2016).
The procedure for calculating the Prevalence Index is available from the Regional
Supplement to the Corps Wetland Delineation Manual: Eastern Mountains and
Piedmont Region, Version 2.0. Gage and Cooper (2010), as well as an applicable
literature review.
C. Wetland Hydrology Monitoring
Monitoring wetland hydrology requires measuring the frequency, depth, and duration
of inundation and/or saturation of upper soil horizon(s) in relation to the ground
surface elevation. The following requirements apply to all freshwater wetland
mitigation projects, which will typically require the installation of monitoring wells,
piezometers, and/or staff gages. Alternative monitoring plans may be approved by
the Corps, in consultation with the IRT, on a case-by-case basis to accommodate
non-standard techniques.
a. Wells and piezometers must be installed in accordance with the techniques
and standards described in ERDC TN-WRAP-05-2, with the exception that
the depth of monitoring well installation should extend to 30 inches below
ground surface. The Soil Characterization Data Form and Monitoring Well
Installation Data Form in ERDC TN-WRAP-05-2 must be submitted to
document compliance with the technical standard (Appendix A & B).
b. Assessment of wetland hydrology requires field classification and mapping
of soils onsite by a Certified Soil Classifier credentialed as a Soil Scientist.
These professionals are identified in the latest listing of Individuals
Approved by Georgia Department of Public Health to Conduct Soil
Investigations throughout Georgia for On-site Sewage Management
Systems.
c. A sufficient number of monitoring wells, piezometers, and/or stage
recorders must be installed to characterize each mitigation monitoring unit.
7
(Version 1.0, November 8, 2018)
i.
Generally, there will be one monitoring well installed per five (5)
acres of monitoring unit, but under no circumstance will there be
fewer than two (2) wells in any single monitoring unit.
ii.
Wells must be installed in representative site conditions (e.g. not
within localized depressions) with appropriate spatial distribution
based on the hydrologic complexity of the area and the targeted
mitigation treatment. Arrangement of wells on transects oriented
perpendicular to topographic gradients, adjacent to hydrologic
alterations, and in proximity of soil and/or vegetative changes are
preferred.
iii.
Piezometers may be required where depth-specific hydraulic
head measurements are necessary to characterize the hydrologic
processes within a given mitigation treatment area (typically to
characterize the vertical component of groundwater flow and to
determine recharge and discharge conditions) or where a
perched water table is present (installed above and below the
impermeable layer).
iv.
Stage recorders should be installed in open water channels (e.g.
streams, ditches, etc.) to document water levels in these features
relative to shallow ground water levels monitored in adjacent
areas. Stage recorders in post-mitigation open water channels
(e.g. restored streams) will document the depth, frequency, and
extent of overbank flood events.
d. Each monitoring well and piezometer must be surveyed to include GPS
coordinates, elevation at ground surface, and elevation at the top of the
riser. These may be relative elevations, if they are all tied to a common
datum. Stage recorders should be surveyed together with corresponding
channel and valley cross-sections, including applicable monitoring wells
and/or piezometers installed on the same transect.
e. All monitoring wells, piezometers, and stage recorders will be equipped
with automated water level loggers. Recommended data collection
intervals are as follows: shallow groundwater wells and piezometers every
eight (8) hours (recorded at 0000, 0800, and 1600 hrs); open water stage
recorders every 15 to 60 minutes.
f. Data collected by non-vented water level loggers (e.g. Onset HOBO,
Solinst Levelogger Edge, In-Situ Level Troll 400, etc.)2 must be corrected
for changes in barometric pressure recorded by one or more dedicated
barometric pressure gages recording at the same interval as the monitoring
well(s) or stage recorder(s). The location of each barometric pressure
gage must be surveyed.
Reference to specific product names or manufacturers does not constitute implicit endorsement,
approval, or disapproval of said products or manufacturers by the Corps.
2
8
(Version 1.0, November 8, 2018)
g. Quarterly maintenance (i.e., every three months) of all monitoring wells,
piezometers, and stage recorders must be documented in annual
monitoring reports and should include the Monitoring Well and Stage
Recorder Maintenance Log (Appendix C) for each individual monitoring
instrument. Any recorded instrumentation drift should be identified during
quarterly maintenance, and the instrument should be appropriately
recalibrated. Data collected should be adjusted to correct for any
documented drift between readings.
h. Individual hydrographs must be provided for each monitoring well,
piezometer, and stage recorder. The hydrograph should include an
overlay depicting on-site precipitation data, climatic range of normal
precipitation, and the 30-day rolling average of precipitation. Hydrographs
for monitoring wells and piezometers should also clearly identify a
reference line at 12 inches below ground surface elevation and a
demarcation for the start and end of the growing season (see Sprecher and
Warne, 2000).
i. Data should be collected and presented for the entire 365-day
monitoring year.
ii. Each monitoring well and piezometer hydrograph should include
the hydrograph from the previous monitoring year.
iii. Hydrographs should be presented in landscape format on 8.5 x 11"
paper, maximizing the x-axis to fill the page. All hydrographs
presented for the same project must be presented at the same
scale.
iv. All hydrology data (corrected for barometric pressure, if applicable)
will be provided electronically to the Corps and IRT for each
monitoring well, piezometer, and stage recorder in Microsoft Excel
format.
i. Inundation and/or saturation within 12 inches of the ground surface
continuously for at least 14 days is referred to herein as a "saturation
event." Each monitoring report should at a minimum include a summary
table that identifies the longest continuous saturation event during the
growing season and the percent of the growing season over which this
event occurred, the number of discrete saturation events equal to or
greater than 14 days duration during the growing season, and the
cumulative number of days during the growing season for which
documented saturation events occurred.
D. Large Woody Debris Monitoring
a. At each wetland vegetative monitoring plot, two 50-foot (15.24-meter)
transects perpendicular to each other should be established, one bearing
9
(Version 1.0, November 8, 2018)
north and one bearing east, originating at the outer boundary of the
sample plot (see Vegetation Plot Schematics at Appendix A).
b. Along each transect, the diameter of each non-living woody stem equal to
or greater than 7.5 centimeters (3 inches) in diameter and 1 meter (3.3
feet) in length that intersects the plane above the entire length of the 50foot transect, must be measured and recorded. The Georgia Interim
Freshwater Wetland HGM Workbook converts these diameters to an
estimated volume per area using a method from the U.S. Department of
Agriculture Forest Inventory Analysis (see the Georgia Interim Freshwater
Wetland Hydrogeomorphic Workbook User Manual for more information).
IV.
Non-Tidal Stream Monitoring
A. Vegetation Monitoring
Streamside vegetative communities will be monitored separately from those located
in the broader riparian zone. Streamside vegetative communities are defined herein
as those rooted in the near-stream zone lying between bankfull elevation and four
(4) meters (approximately 13 feet) laterally from bankfull elevation. By contrast,
riparian vegetative communities extend from the outer boundary of the streamside
vegetative community to the outer boundary of the zone for which riparian vegetative
mitigation credit is sought by the Sponsor.
The following requirements apply to all stream mitigation projects that include
planting of woody vegetation. Alternative vegetation planting and monitoring plans
may be approved by the Corps, in consultation with the IRT, on a case-by-case
basis to accommodate non-standard techniques.
a. Vegetation monitoring should be conducted between August 1st and
October 31st, consistent with the schedule outlined in Table 2. To the
extent practicable, subsequent monitoring events should be scheduled as
near as possible to the same date(s) as previous monitoring events.
b. The presence of exotic/invasive species (in all strata) on or immediately
adjacent to the mitigation site should be evaluated during each monitoring
event and noted in the monitoring reports. The reported presence of
invasive species should not be limited to coverage solely within permanent
or random vegetation monitoring plots.
c. Planting in rows to facilitate mowing between planted species in the
riparian area is acceptable. However, mowing should not take place in
portions of the mitigation bank that are targeted as wetland reestablishment or enhancement. Note that mowed volunteer trees should
not be counted in vegetation data presented in annual monitoring reports.
10
(Version 1.0, November 8, 2018)
d. Herbicides may be used in upland riparian areas to control nuisance
volunteer or exotic/ invasive vegetation, provided that the specific
herbicides proposed for use are identified in the mitigation bank's
maintenance plan. All herbicides must be applied by a licensed applicator
in accordance with product labeling. Any herbicides used near streams,
wetlands, or open water areas must be approved for aquatic use. It is
solely the responsibility of the project Sponsor to apply herbicides in
accordance with all applicable local and federal rules and regulations,
including but not limited to appropriate personal protection equipment for
applicators and necessary controls to prevent off-site migration of
herbicide.
B. Vegetation Monitoring In Streamside Vegetation Zones
a. Monitoring in streamside vegetation zones will be conducted in
assessment areas two (2) meters (6.5 feet) wide centered at each end of
each channel cross-section (See Section IV(D)(b) for instructions for
establishing cross-sections). Each streamside vegetation assessment
area will encompass an assessment area of eight (8) square meters (86
square feet; 0.002 acres) on each streambank at each channel crosssection.
b. Total percent cover of all woody perennial vegetation, excluding vines, that
is rooted in the streamside vegetation zone will be estimated and reported
individually for each assessment area during each vegetation monitoring
event.
c. A modified densiometer will be used to assess percent streamside canopy
closure (Appendix D, Measuring Stream Channel Shading Using a
Modified Convex Densiometer).
C. Vegetation Monitoring In Riparian Zones
a. A combination of permanent and random fixed-area plots should be used
to monitor vegetation in the riparian zone.
i. Plots should be distributed throughout the site and provide a
stratified random coverage of all vegetation community types reestablished, enhanced or preserved on the site. Every mitigation
treatment area on the project site shall consist of one or more
"monitoring units" defined by either differing baseline conditions
(e.g. soil type, vegetative communities, hydrologic conditions, etc.)
and/or mitigation treatments (e.g. mitigation objectives, proposed
vegetative communities or hydrologic conditions, etc.). Each
monitoring unit must include both permanent and random
vegetation sampling plots. Note that spatially non-contiguous
areas with comparable soil/hydrologic conditions, mitigation
treatment or target condition will also comprise separate monitoring
units.
11
(Version 1.0, November 8, 2018)
ii. Permanent plots should comprise at least 50% of the total required
number of plots per monitoring unit. Random plots should be
established prior to each year of vegetation monitoring via random
selection from a grid overlain on each monitoring unit. No
vegetation sampling plot should overlap any portion of any other
vegetative plot. It is recommended that individual monitoring units
be subdivided into approximately equal areas equivalent in number
to the number of random plots to be established therein. Random
plots may then be established in each subdivision, thus
safeguarding a spatially wide distribution of plots within each
monitoring unit.
iii. Generally, there will be one vegetation sample plot per five (5)
acres of monitoring unit, but under no circumstance will there be
fewer than two (2) sample plots in any single monitoring unit (1
permanent and 1 random).
iv. The IRT retains discretion to require supplemental sample plots if
portions of a monitoring unit appear to be underperforming, and/or
if they are under-represented by sample plots.
v. The location (GPS coordinates) of random plots must be identified
in the associated annual monitoring report, and the plots must be
marked in the field so they can be inspected by the IRT, if needed.
vi. Plot sizes for the determination of tree stem density and vigor
should be a minimum of 0.1 acre (0.04 ha). Appendix A includes
vegetation plot schematics that illustrate recommended sample plot
design. Note that for typical upland riparian zones, the 1 squaremeter herbaceous quadrats illustrated in the schematics are
unnecessary.
vii. Neither wetland vegetation monitoring plots, nor riparian vegetation
monitoring plots should overlap streamside vegetation zones, as
defined above.
b. Monitoring plots must cumulatively comprise a minimum 2% area of each
monitoring unit on the mitigation site. Exceptions may be permissible on a
case-by-case basis for very small monitoring units or for large,
homogeneous monitoring units. All exceptions to this requirement shall be
specifically justified in the approved Mitigation Work Plan.
c. Riparian vegetation monitoring data collected from the plots must include:
i. Within each permanent vegetative monitoring plot:
1. Tree/shrub species, height, identification as planted vs.
volunteer, and age (based on the year the stem was planted,
or first observed for volunteers); and
2. When individual trees reach a height sufficient to measure
diameter at breast height (dbh; stem diameter at 4.5 feet
above ground surface), dbh must also be reported;
ii. Within each random vegetative monitoring plot:
1. Tree/shrub species and height;
12
(Version 1.0, November 8, 2018)
2. When individual trees reach a sufficient height, dbh must
also be reported; and
iii. For both permanent and random plots, all woody stems, including
exotic/ invasive species, should be recorded. Exotic/invasive
species will not count toward success of performance standards.
d. Individual plot data must be provided separately for planted and volunteer
species. Plot data should be presented individually per plot, as well as
averaged among plots within individual monitoring units.
D. Stream Channel Geomorphology and Stream Hydrology Monitoring
The monitoring requirements included in this section demonstrate the
effectiveness of mitigation activities that physically alter the existing channel bed
or banks, including any excavation, fill, construction, or installation of materials to
improve channel stability or habitat conditions for aquatic biota. For the purposes
of this document, a "reach" is defined as:
a continuous section of an individual tributary where a similar design
approach is applied and similar morphological characteristics are present; or
an individual tributary between confluences with other tributaries; or
an individual otherwise homogeneous tributary that is bisected by a feature
(either natural or man-made) that changes the physical nature of the tributary.
Examples may include bridge or pipeline crossings, fords, bedrock outcrops,
etc.
a. Channel geomorphology must be monitored annually until interim credit
release and bi-annually thereafter until final credit release (Table 2).
i. It is recommended that stream surveys conducted to assess
baseline conditions, document as-built conditions and for project
performance monitoring generally follow the methodology
contained in the USDA Forest Service Manual, Stream Channel
Reference Sites (Harrelson, et.al., 1994).
b. Permanent, monumented cross-sections must be installed in each unique
stream reach on the mitigation site at an approximate frequency of one per
20 bankfull-widths, measured along the centerline of the channel, or a
minimum of one cross-section every 150 meters (approximately 500 linear
feet) of the reach. Cross-sections should include pools and riffles in
proportions generally consistent with percent-pool and percent-riffle in the
approved mitigation design. The selection of channel cross-section
monitoring stations should always include areas that may be predisposed
to potential problems, such as particularly tight meanders, meanders just
downstream from channel confluence points or areas where in-channel
work corrected existing bank failures.
i.
All channel cross-sections within riffles must include
measurements of Bank Height Ratio (BHR) and Entrenchment
13
(Version 1.0, November 8, 2018)
Ratio (ER), each of which must be documented in monitoring
reports.
ii.
Riffle and pool cross-sections should be co-located with
longitudinal profiles as much as possible.
iii.
Riffle cross-sections should also be surveyed together with stage
recorders, where applicable.
c. Longitudinal profiles will be collected from each unique stream reach on
the mitigation site and will include the thalweg, water surface, bankfull,
grade control structures (cross-vanes, j-hooks, etc.), stage recorders (that
are coincident with the longitudinal profile), and top of bank.
i.
Each longitudinal profile should extend for a channel length of
approximately 40x bankfull width or a minimum of 100 meters
(328 feet) and two full channel meander wavelengths. Beginning
and ending points for longitudinal profiles should both occur at
the head of a riffle.
ii.
Unique longitudinal profiles should be spaced a maximum of
every 300 meters (approximately 1,300 feet) along homogeneous
stream reaches.
d. Continuously recording water level loggers must be installed to document
hydrologic flow permanence and the occurrence of bankfull flow events. A
minimum of one stage recorder must be installed on each tributary on the
mitigation site. Additionally, one stage recorder is required no less than
every 800 meters (approximately 2,640 feet) of channel length on any
homogeneous stream reach.
i.
Stage recorders should be designed, installed, and surveyed to
be capable of documenting the frequency and duration of
overbank events, and should generally be installed within the
glide immediately upstream of riffles.
ii.
Data collected by non-vented water level loggers (e.g. Onset
HOBO, Solinst Levelogger Edge, In-Situ Level Troll 400, etc.)3
must be corrected for changes in barometric pressure recorded
by one or more dedicated barometric pressure gages recording at
the same times as the stage recorder(s). The location of each
barometric pressure gage must be surveyed.
iii.
Quarterly maintenance (i.e., every three months) of all stage
recorders must be documented in annual monitoring reports and
should include the Monitoring Well and Stage Recorder
Maintenance Log (Appendix C) for each individual monitoring
instrument. Any recorded instrumentation drift should be
identified during quarterly maintenance, and the instrument
should be appropriately recalibrated. Data collected should be
adjusted to correct for any documented drift between readings.
Reference to specific product names or manufacturers does not constitute implicit endorsement,
approval, or disapproval of said products or manufacturers by the Corps.
3
14
(Version 1.0, November 8, 2018)
iv.
v.
vi.
vii.
Individual hydrographs must be provided for each stage recorder.
The hydrograph should include an overlay depicting on-site
precipitation data, climatic range of normal precipitation, and 30day rolling average of precipitation (see Sprecher and Warne,
2000).
Data should be collected and presented for the entire 365-day
monitoring year.
Hydrographs should be presented in landscape format on 8.5 x
11" paper, maximizing the x-axis to fill the page. All hydrographs
presented for the same project must be presented at the same
scale.
All hydrology data (corrected for barometric pressure, if
applicable) will be provided electronically to the Corps and IRT for
each monitoring well, piezometer, and stage recorder in Microsoft
Excel format.
E. Stream Biological Monitoring
Macroinvertebrate community monitoring is required for all stream mitigation projects
in Georgia on the schedule indicated in Table 2 to demonstrate anti-degradation
pursuant to applicable water quality standards (i.e. designated uses) and potential
biological improvement. The Sponsor may elect not to continue macroinvertebrate
sampling once anti-degradation has been demonstrated at interim credit release.
However, the Sponsor will then forfeit any potential mitigation credit generation in
the biology functional category of the Georgia SQT.
Macroinvertebrate indicators are inherently sensitive to changes that occur
anywhere within the watershed draining to the mitigation project, such as land use
changes, meteorological changes (droughts, storms, etc.) or pollution entering the
watershed (e.g., herbicide use, fertilizer application, road runoff, etc.). For
macroinvertebrates, there may also be a lag period for re-colonization, and thus
proximity of the mitigation site to intact sources of target macroinvertebrate
community assemblages is an important consideration in site selection.
Macroinvertebrate sampling on perennial streams draining 3.0 square miles in the
Piedmont (Ecoregion 45) or Blue Ridge (Ecoregion 66) in Georgia should be
conducted following the Standard Operating Procedures for the Collection and
Analysis of Stream Benthic Macroinvertebrates for the Clean Water Act, Section 404
Regulatory Program in Georgia (Appendix E), which were modified from the Qual-4
protocols of the North Carolina Division of Environmental Quality, Standard
Operating Procedures for the Collection and Analysis of Benthic Macroinvertebrates
(NCDEQ, 2016).
a. Sampling should be undertaken between April 1 and June 30; Sampling
should be conducted as near as possible to the same date each year
15
(Version 1.0, November 8, 2018)
during the monitoring period to minimize seasonal differences in the data
from year-to-year.
b. If the drainage area of the stream > 3.0 square miles, or if the mitigation
site lies outside of Ecoregions 45 or 66, early consultation and coordination
with the Corps and the IRT will be required to establish biological
monitoring protocols and performance standards.
c. Macroinvertebrate sampling should be conducted on every perennial
tributary greater than 150 meters (approximately 500 feet) in length.
Additional sampling points are required per additional 300-meter increment
of channel length on each homogeneous tributary (i.e., 300m = 1 point,
301m to 600m = 2 points, 601m to 900m = 3 points, etc.).
d. One or more biological reference locations should also be sampled for
comparison purposes. The reference reach(es) should be on a stream or
streams with similar watershed characteristics as the mitigation site (e.g.
drainage size, ecoregion, Rosgen stream type, stream evolution model
phase, watershed land use, etc.) (Rosgen, 1993) (Cluer and Thorne,
2013). The reference location(s) may be located within an on-site
preservation reach, or upstream of the mitigation site if stream conditions
are appropriate, but should not be located downstream of mitigation
activities.
e. Biological sampling data should be presented in the subsequent
monitoring report and include, at a minimum, a list of taxa collected at
each sample station for each sampling event, the habit and functional
feeding group designation of each taxon determined from the Georgia
SQT Macroinvertebrate Traits table available on the Corps RIBITS web
page and the calculations of standardized biological metric values
described in the Georgia Interim Stream Quantification Tool User Manual,
included as Appendix 11.19 of the Savannah District's 2018 Standard
Operating Procedure for Compensatory Mitigation, also available on the
Corps Savannah District's RIBITS web page.
i. Each report should include a summary of the current results and all
past monitoring events in tabular format. Other summary or
comparison statistics may also be acceptable on a case-by-case
basis.
ii. Data for each sample station should be reported separately; that is,
data from multiple sample stations, even those located on the
same tributary or homogeneous reach, should not be pooled
together for analysis or reporting.
16
(Version 1.0, November 8, 2018)
F. Stream Water Quality Monitoring
Water quality monitoring is not required for stream mitigation projects in Georgia.
Early consultation and coordination with the Corps and the IRT will be required to
establish applicable water quality monitoring protocols for those mitigation projects
where existing water quality impairment may be addressed by actions proposed by
the Sponsor.
G. Large Woody Debris Monitoring
Sample reaches for large woody debris (LWD) should extend 100m in length, and
must be permanently located within the same reach or sub-reach limits as the other
geomorphology assessments. Additionally, the 100m stream reach from which the
LWD Index (LWDI) (outlined in the GA SQT) is calculated should represent the
100m segment of the larger assessment reach that will yield the highest LWDI
score. LWD surveys for both project construction and project monitoring should
follow the methodology contained in the Application of the Large Woody Debris
Index: A Field User Manual (Harman, et.al. 2017).
Table 1. Post-construction monitoring schedule for freshwater wetland mitigation
projects in Georgia.
Wetland Monitoring
Parameter
Vegetation
Hydrology
Prevalence Index
Wetland Monitoring
Parameter
Vegetation
Hydrology
Prevalence Index
Large Woody Debris
Years preceding interim credit release
As-Built Continuous Annual Bi-annual
X
X
X
X
X
Years following interim credit release
As-Built Continuous Annual Bi-annual
X
X
X
X
17
(Version 1.0, November 8, 2018)
Table 2. Post-construction monitoring schedule for non-tidal stream mitigation
projects in Georgia.
Stream Monitoring
Parameter
Hydrology
Geomorphology
Channel cross-sections
Longitudinal profiles
Vegetation
Biology
(macroinvertebrates)
Stream Monitoring
Parameter
Hydrology
Geomorphology
Channel cross-sections
Longitudinal profiles
Large woody debris
Vegetation
Biology
(macroinvertebrates)
Years preceding interim credit release
As-Built Continuous Annual Bi-annual
X
X
X
X
X
X
X
X(1)
Years following interim credit release
As-Built Continuous Annual Bi-annual
n/a
X
n/a
n/a
X
n/a
X
n/a
X
n/a
X
n/a
X
Sponsor may initiate biological monitoring at any time following construction, so long as s/he
has at least two consecutive years of biological sampling that demonstrates attainment of interim
success criteria prior to seeking the interim mitigation credit release.
(1)
V.
Freshwater Wetland Mitigation Performance Standards
Performance standards are observable or measurable physical (including hydrological),
chemical and/or biological attributes that are used to determine if a compensatory
mitigation project meets its objectives, (33 CFR 332.2; 40 CFR 230.92). The GA HGM
directly incorporates a suite of performance standards in the assessment of final
mitigation credit generation for wetland mitigation projects. Both interim performance
standards and final performance targets necessary for wetland mitigation projects in
Georgia are described in this section.
A. Wetland and Upland Buffer Zone Vegetation Performance Standards
a. Within planted portions of the mitigation site, there must be a minimum of
150 saplings per acre with a minimum 1-inch dbh at the interim
performance milestone and a minimum 150 trees per acre with a minimum
3-inch dbh at the final performance milestone;
i. For any sapling or tree to count toward meeting the dbh
performance standard, it may be either planted or volunteer, but it
18
(Version 1.0, November 8, 2018)
must be a species from the approved vegetation list included in the
Mitigation Work Plan. Vegetation lists and community composition
should be informed by documented vegetation reference sites.
Other species not included on the planting list may be considered
by the IRT on a case-by-case basis.
ii. Supplemental plantings and volunteers must be present for at least
two growing seasons before counting toward meeting either interim
or final performance standards.
iii. No single species may have a greater density than the equivalent
maximum density of the most common species inventoried within
the reference communities.
iv. In cases where plots are dominated by undesirable volunteer
species, remedial action as specified in the Adaptive Management
Plan or as directed by the Corps and IRT may be required.
b. Exotic/invasive plant species must represent less than 5% of the absolute
vegetative cover across all strata in all monitoring units at both interim and
final performance milestones. The presence of individuals/stems of
exotic/invasive species included on the Category 1 List of the Georgia
Invasive Species Vegetation Task Force, which are of reproductive age,
will preclude all monitoring units from meeting interim performance and/or
final performance milestones. Note, monitoring and tracking of
exotic/invasive species coverage is not limited to only the vegetation
monitoring plots.
c. Dominant species of the uppermost stratum on-site must correspond to the
selected index value in the GA HGM, at interim and final performance
milestone, respectively.
d. The Prevalence Index for herbaceous vegetation in wetland mitigation
areas, must be less than 3.0 in all monitoring units in order to meet interim
and final performance milestones.
B. Wetland Hydrology Performance Standard
The GA HGM uses target wetland soil saturation ranges as performance
standards to document the presence of hydric conditions. The Georgia Interim
Freshwater Wetland HGM Workbook automatically incorporates the applicable
hydrology performance standard based on user assigned workbook entries for
the physiographic region where the project is located and the field-verified soil
type. The Georgia Interim Freshwater Wetland Hydrogeomorphic Workbook
User Manual describes the origin of these target saturation ranges and how they
will be used to evaluate wetland hydrology performance standards.
Wetland hydrology will be evaluated based on growing season conditions
demonstrated for 50 percent or greater of the monitoring years under "normal" or
"drier" rainfall conditions. Wetland hydrology will be evaluated first for the interim
performance milestone, and secondly for final performance. Wetland hydrology
19
(Version 1.0, November 8, 2018)
data collected prior to achieving the interim performance milestone will not be
used as a basis for meeting final performance. The sponsor will be required to
maintain a hydrologic reference coupled with a precipitation gage to account for
climatic variance outside of normal conditions. Extended periods of abnormal
climatic conditions may require an extended monitoring period.
C. Large Woody Debris Performance Standards
The Large Woody Debris (LWD) variable subindex must match the selected GA
HGM LWD value at final performance. Woody debris material must be
comprised of species identified as part of the target wetland vegetative
community. There is not an interim performance standard for LWD.
D. Additional Wetland Performance Standards
The Corps may require additional wetland performance standards on case-bycase basis, dependent upon project goals, objectives, and site conditions.
VI.
Non-Tidal Stream Mitigation Performance Standards
Performance standards are observable or measurable physical (including hydrological),
chemical and/or biological attributes that are used to determine if a compensatory
mitigation project meets its objectives, (33 CFR 332.2; 40 CFR 230.92). The Georgia
Interim SQT directly incorporates a suite of performance standards in the assessment of
final mitigation credit generation for stream mitigation projects. Interim performance
standards and additional final performance targets necessary for stream mitigation
projects in Georgia are described in this section.
A. Streamside Vegetation Performance Standards
a. Within planted portions of streamside vegetation zones, there must be a
minimum of 50 percent woody stem cover at the interim performance
milestone; and
b. Within planted portions of streamside vegetation zones, there must be a
minimum of 80 percent canopy closure at final performance.
B. Riparian Zone Vegetation Performance Standards
a. Within planted riparian zones of the mitigation site, there must be a
minimum of 150 trees per acre with a minimum 1-inch dbh at interim
performance milestone and a minimum 150 trees per acre with a minimum
3-inch dbh at final performance milestone;
i.
For any tree to count toward meeting the dbh performance standard,
it may be either planted or volunteer, but it must be a species from
the approved planting list included in the Mitigation Work Plan.
Other species not included on the planting list may be considered by
the IRT on a case-by-case basis.
20
(Version 1.0, November 8, 2018)
ii.
iii.
iv.
v.
Supplemental plantings and volunteers must be present for at least
two growing seasons before counting toward meeting either interim
or final performance standards
No single species may have a greater density than the equivalent
maximum density of the most common species inventoried within
the reference vegetation communities.
In cases where plots are dominated by volunteer species, remedial
action as specified in the Adaptive Management Plan or as directed
by the Corps and IRT may be required.
Exotic/invasive plant species coverage must be less than 5%
absolute coverage across all strata in all monitoring units at both
interim and final performance milestones. The presence of
individuals/stems of exotic/invasive species included on the
Category 1 List of the Georgia Invasive Species Vegetation Task
Force, which are of reproductive age, will preclude all monitoring
units from meeting interim performance and/or final performance
milestones. Note, monitoring and tracking of exotic/invasive species
coverage is not limited to only the vegetation monitoring plots.
C. Stream Channel Geomorphology and Stream Hydrology Performance Standards
a. Bank height ratio (BHR) must not exceed 1.2 at any riffle cross-section.
b. Entrenchment ratio (ER) must be no less than 2.4 for Rosgen C and E
stream types, and no less than 1.4 for Rosgen A, B and Bc stream types
at any riffle cross-section.
c. Channel cross-sectional area and width/depth ratio should stay within
design ranges throughout the monitoring period.
d. The Large Woody Debris (LWD) variable subindex must match the
selected GA SQT LWD value at final performance. There is not an interim
performance standard for LWD.
e. All stream channels must receive sufficient flow throughout the monitoring
period to maintain an Ordinary High Water Mark (OHWM) in accordance
with the requirements of RGL 05-05, dated December 7, 2005, which
establishes the lateral extent of Corps jurisdiction for non-tidal waters for
CWA Section 404.
f. Continuous surface water flow in all tributaries must be documented to
occur every year under normal climatic conditions consistent with targeted
hydrologic flow regimes (e.g. perennial, intermittent);
g. For intermittent flow conditions, continuous surface water flow must be
documented to occur for at least 90 consecutive days;
h. Perennial flow conditions, pursuant to stream mitigation hydrologic
permanence in Georgia, will require continuous surface water flow 90
percent of a calendar year.
21
(Version 1.0, November 8, 2018)
D. Biological Monitoring Performance Standards
a. Interim and final biological performance standards for stream mitigation
undertaken on perennial streams draining 3.0 square miles in the
Piedmont (Ecoregion 45) or Blue Ridge (Ecoregion 66) in Georgia will be
based on pre-construction (baseline) macroinvertebrate community
assemblages.
i. The cumulative SQT index score at interim and final performance
milestones must be no less than the baseline index score for 50
percent or greater of the monitoring years under normal rainfall
conditions. Benthic macroinvertebrate data collected prior to the
interim performance milestone will not be used as a basis for
meeting final performance. Extended periods of abnormal climatic
conditions will require an extended monitoring period.
b. If the drainage area of the stream > 3.0 square miles, or if the mitigation
site lies outside of Ecoregions 45 or 66, interim and final performance
standards will be determined on a case-by-case basis during early
consultation and coordination with the Corps and the IRT and incorporated
into the final approved Mitigation Work Plan.
E. Water Quality Performance Standards
Interim and final performance standards for water quality for stream mitigation in
Georgia will be determined on a case-by-case basis, as applicable, during early
consultation and coordination with the Corps and the IRT and incorporated into
the final approved Mitigation Work Plan.
F. Additional Stream Performance Standards
The Corps may require other stream performance standards on case-by-case
basis, dependent upon project goals, objectives and site conditions.
VII.
References
Caldwell, P.V., M.J. Vepraskas, J.D. Gregory, R.W. Skaggs, and R.L. Huffman. 2012.
Linking plant ecology and long-term hydrology to improve wetland restoration success.
Trans. Am. Soc. Agricultural and Biological Engineering 54:2129-2137.
Cluer, B. and C.R. Thorne. 2013. A Stream Evolution Model Integrating Habitat
Ecosystem Benefits. River Restoration Applications, 30, 135-154.
Gage, E. and D.J. Cooper. 2010. Vegetation sampling for wetland delineation: a review
and synthesis of methods and sampling issues. ERDC/CRREL CR-10-2. U.S. Army
22
(Version 1.0, November 8, 2018)
Corps of Engineers, Engineer Research and Development Center, Cold Regions
Research and Engineering Laboratory. Hanover, NH.
Georgia Exotic Pest Plant Council. https://www.gaeppc.org/. Accessed July 18, 2018.
Harman, W.A., T.B. Barrett, C.J. Jones, A. James, and H.M. Peel. 2017. Application of
the Large Woody Debris Index: A Field User Manual Version 1. Stream Mechanics and
Ecosystem Planning & Restoration, Raleigh, NC.
Lichvar, R.W., D.L. Banks, W.N. Kirchner, and N.C. Melvin. 2016. The National Wetland
Plant List: 2016 wetland ratings. State of Georgia. Phytoneuron 2016-30: 1-17.
Published 28 April 2016.
National Technical Committee for Hydric Soils (NTCHS). 2015. Hydric Soils Technical
Note 11: Hydric Soils Technical Standard and Data Submission Requirements for Field
Indicators of Hydric Soils. Washington, DC: United States Department of Agriculture
(USDA), NRCS.
NCDEQ. 2016. Standard Operating Procedures for the Collection and Analysis of
Benthic Macroinvertebrates, v5.0, February 2016. North Carolina Department of
Environmental Quality, Division of Water Resources. Raleigh, NC.
(https://files.nc.gov/ncdeq/Water%20Quality/Environmental%20Sciences/BAU/NCDWR
Macroinvertebrate-SOP-February%202016_final.pdf)
Rosgen, D. 1996. Applied River Morphology. Wildland Hydrology, Pagosa Springs, CO.
Smith, D.R., A. Ammann, C. Bartoldus, and M.M. Brinson. 1995. "An approach for
assessing wetland functions using hydrogeomorphic classification, reference wetlands,
and functional indices," Technical Report WRP-DE-9, U.S. Army Engineer Waterways
Experiment Station, Vicksburg, MS. NTIS No. AD A307 121.
Sprecher, S.W. 2000. Installing monitoring wells/piezometers in wetlands, WRAP
Technical Notes Collection (ERDC TN-WRAP-00-02), U.S. Army Engineer Research
and Development Center, Vicksburg, MS. www.wes.army.mil/el/wrap
Sprecher, S.W., and A.G. Warne. 2000. Accessing and using meteorological data to
evaluate wetland hydrology, ERDC/EL TR-WRAP-00-1, U.S. Army Engineer Research
and Development Center, Vicksburg, MS.
Sumner, J.P., M.J. Vepraskas, and R.K. Kolka. 2009. Methods to evaluate normal
rainfall for short-term wetland hydrology assessment. Wetlands. 29(3), 1049-1062,
doi:10.1672/09-026d.1.
23
(Version 1.0, November 8, 2018)
Tiner, R.W. 1999. Wetland Indicators: A Guide to Wetland Identification, Delineation,
Classification, and Mapping. Lewis Publishers. New York. 392 pp.
U.S. Army Corps of Engineers. 2005. Technical Standard for Water-Table Monitoring of
Potential Wetland Sites, WRAP Technical Notes Collection (ERDC TN-WRAP-05-2),
U.S. Army Engineer Research and Development Center, Vicksburg, MS.
U.S. Army Corps of Engineers. 2012. Regional Supplement to the Corps of Engineers
Wetland Delineation Manual: Eastern Mountains and Piedmont Region Version 2.0, ed.
J. F. Berkowitz, J. S. Wakeley, R. W. Lichvar, C. V. Noble. ERDC/EL TR-12-9.
Vicksburg, MS: U.S. Army Engineer Research and Development Center.
USDA, NRCS. 2015. National Engineering Handbook, Part 650, Engineering Field
Handbook, Chap. 19, Hydrology Tools for Wetland Identification and Analysis.
Warne, A.G., and J.S. Wakeley. 2000. "Guidelines for conducting and reporting
hydrologic assessments of potential wetland sites," WRAP Technical Notes Collection
(ERDC TN-WRAP-00-01), U.S. Army Research and Development Center, Vicksburg,
MS. www.wes.army.mil/el/wrap/.
VIII.
Appendices
Appendix A - Vegetation Plot Schematics
Appendix B - Soil Characterization Data Form
Monitoring Well Installation Data Form
Appendix C - Monitoring Well and Staff Gage Maintenance Log
Appendix D - Measuring Stream Channel Shading Using a Modified Convex
Densiometer
Appendix E - Standard Operating Procedures for the Collection and Analysis of
Stream Benthic Macroinvertebrates for the Clean Water Act,
Section 404 Regulatory Program in Georgia
24
(Version 1.0, November 8, 2018)
Appendix A
Vegetation plot schematics
(T1)
N
X
0
Q5
Q1
3.0m
Q2
11.3m
270
A1
A3
Q4
90
Q3
2
1m Quadrat
A2
180
Qx
Herbaceous coverage
quadrats
Ay
Alternative herbaceous
coverage quadrats
X
Start point for large
woody debris transects
(Tx); 50 feet (15.24m)
25
(Version 1.0, November 8, 2018)
X
(T2) 15.24m VLWD
(T1)
N
0
X
Q5
Q1
3.0m
10.0m
270
A1
Q2
A3
Q4
Q3
2
1m Quadrat
A2
180
Qx
Herbaceous coverage
quadrats
Ay
Alternative herbaceous
coverage quadrats
X
Start point for large
woody debris transects
(Tx); 50 feet (15.24m)
26
(Version 1.0, November 8, 2018)
X
90
(T2) 15.24m VLWD
Appendix B
Soil Characterization Data Form & Monitoring Well Installation Data Form
27
(Version 1.0, November 8, 2018)
ERDC TN-WRAP-05-2
June 2005
APPENDIX A. SOIL CHARACTERIZATION DATA FORM
Soil Characterization Data Form
Project Name
Personnel
Horizon
Depths
(inches)
Texture
Date
Soil Pit ID
Matrix Color
(Munsell
moist)
Redoximorphic Features
Color
Abundance
Comments:
28
(Version 1.0, November 8, 2018)
Induration
(none, weak,
strong)
Roots
29
(Version 1.0, November 8, 2018)
Appendix C
Monitoring Well and Staff Gage Maintenance Log
30
(Version 1.0, November 8, 2018)
Monitoring Well Maintenance Log
Well ID # ______________
Coordinates ______________
-
SAS Project # ______________
Personnel ______________
Date Installed ______________
Maintenance History (Dates clogged, cleaned, replaced, etc.) _______________________________________________________
Date/Time
Method of
Measuring
Water Level in
well
Height of
Riser Above
Ground
Surface
Elevation
(GSE)
Depth to
Water From
Top of Riser
Water Level
Below GSE
Automated Level
logger -Water
Level Below GSE
% Difference
Between Automated
Level Logger and
Manual Water Level
Reading
Comments (Instrumentation drift recorded? Pipe checked for clogging? Pipe checked for movement? Vandalism? Well Cap
Missing? Etc.)
31
(Version 1.0, November 8, 2018)
Appendix D
Measuring Stream Channel Shading Using a Modified Convex Densiometer
32
(Version 1.0, November 8, 2018)
Measuring Stream Channel Shading Using a Modified Convex Densiometer
The following standard method is to be used for performing semi-quantitative field
measurements of stream channel shading in streams using a convex densiometer (aka,
Model A spherical densiometer), modified according to Strickler (1959) and USEPA
(2013) (Figure 1). The modification reduces the observations of cover on the sides and
behind the observer, thus minimizing repeated observations of the same component(s)
of cover on the same channel cross-section.
The observer will measure stream channel shading at water's edge at each channel
cross-section throughout the mitigation site.
At each channel cross-section, the observer will take one canopy measurement
at the left bank sampling point and one canopy measurement at the right bank
sampling point. The sample point will be the points on the cross-section at
water's edge (i.e. left edge of water (lew) and right edge of water (rew) and 32.5
cm (12 inches) above the water surface. This will allow for inclusion of shading
from understory species, and also standardizes data collection among observers
and between mitigation sites.
Standing at the lew sampling station, the observer will face the left bank (i.e. he
will be standing in the water). He will ensure that the densiometer stays level
using the bubble level on the densiometer and position his head just outside the
field of view at the bottom of the densiometer. The observer will count the
number of etched-grid intersections on the mirror obscured by overhead
vegetation. There are 17 available intersections (Figure 2). The observer will
record a number (nlew) between 0 (no points covered) to 17 (all points covered).
The observer will then move to the rew sampling station, and repeat the
procedure facing the right bank (nrew).
Stream channel shading is calculated as the ratio of covered intersections ( nlew,
nrew) to total intersections (34) for each channel cross-section.
Percent Channel Shading at Channel Cross-Section = ( nlew, nrew)/34 x 100
References
Strickler, G.E. 1959. Use of the densiometer to estimate the density of forest canopy on
permanent sample plots. U.S.D.A. Forest Service, Pacific Northwest Forest and Range
Experiment Station, Research Note No. 180. Portland, OR.
USEPA. 2013. National Rivers and Streams Assessment 20132014: Field Operations
Manual Wadeable. EPA841B12009b. U.S. Environmental Protection Agency,
Office of Water, Washington, DC.
33
(Version 1.0, November 8, 2018)
J. Sawyers (2011)
Figure 1.
Spherical densiometer modified to leave 17 points of observation at
gridded line intersections.
34
(Version 1.0, November 8, 2018)
J. Sawyers (2011)
Figure 2.
Locations on the face of the densiometer used to assess stream channel
shading (vis a vis canopy coverage).
35
(Version 1.0, November 8, 2018)
Appendix E
Standard Operating Procedures for the Collection and Analysis of Stream
Benthic Macroinvertebrates for the Clean Water Act, Section 404
Regulatory Program in Georgia
36
(Version 1.0, November 8, 2018)
Standard Operating Procedures for the Collection and Analysis of Stream
Benthic Macroinvertebrates for the Clean Water Act, Section 404
Regulatory Program in Georgia
November 2018 (Draft Version 1.0)
1.0
INTRODUCTION
The procedures described in this document establish standard operating procedures for
collecting and analyzing stream benthic macroinvertebrate communities for the Clean
Water Act, Section 404 regulatory program in Georgia.
2.0
PRE-SAMPLING PROCEDURES
2.1
Personnel Qualifications
An experienced benthic biologist trained and skilled in field benthic sampling methods
and organism identification must be present for all sample collections. Personnel must
know insect morphology; be capable of using dichotomous keys; and have knowledge
of the benthic macroinvertebrate taxa found in Georgia and in various stream habitats.
New or inexperienced personnel may be used as team members if close supervision is
provided by the experienced biologist during sample collection, sample picking and
visual collections.
2.2
Equipment and Supplies
Stream mitigation performance standards in the Piedmont and Blue Ridge Ecoregions
of Georgia were generated using data collected according to the "Standard Operating
Procedures for Collection and Analysis of Benthic Macroinvertebrates" in North Carolina
(NCDEQ, 2016). The items listed below are representative of typical equipment and
supplies specified by NCDEQ (2016).
Field Supplies
Triangle frame or D-frame sweep nets with 800-900 micron NitexTM mesh
Sieve buckets with 600 micron mesh (US Standard No. 30)
Wash tubs and picking trays
Forceps
6-dram glass vials with polyseal screw caps
Plastic containers with tightly sealing lids large enough to hold several 6-dram
vials (2/crewmember)
Ethyl alcohol for sample preservation
Labels and collection cards, pencils
Digital camera
37
(Version 1.0, November 8, 2018)
GPS unit
Water quality meter (capable of measuring temperature, dissolved oxygen,
specific conductance and pH)
2.2.1 Calibration and Standardization
All meters and other equipment must be calibrated in the lab or other controlled
environment (e.g., hotel room) and a lab calibration form completed before being taken
into the field each day. Lab calibration forms or field book entries of meter calibration
become part of the sample record. Meters must be checked after sampling each day
using laboratory standards and buffers for specific conductance and pH.
3.0
SAMPLING PROCEDURE
3.1
Overview
The following are primary elements to be considered when performing sampling, which
are also discussed further throughout the document:
Documentation. Proper documentation of site layout and conditions is required.
Photographs facing upstream and downstream from both the start and end of the
sample reach must be taken, and a site sketch should be made that shows any unique
habitats for those basin assessment locations that do not have site sketches. This
sketch should include enough detail that subsequent field crews can return to the same
sampling location.
High Flow Conditions. Most of the sampling methodologies described in this manual
require that freshwater streams or rivers be wadeable for safe and effective data
collection. In addition to safety concerns for field personnel, high water conditions
severely impair sampling efficiency by making some critical habitats inaccessible. If high
water makes sampling conditions unsafe, it is better to return to the site during a more
appropriate flow regime.
Low Flow. Drought conditions can play a major role in altering the composition of the
benthic fauna. Every effort should be made in locations that are susceptible to flow
interruption during droughts to be sure that flow has been continuous prior to sampling.
Flowing water in a stream immediately following a period of rain may mask antecedent
conditions. Prior flow conditions can be difficult to determine, especially in smaller
streams, but USGS flow data from nearby streams and rainfall records from nearby
climate stations should be used to make the best determination of prior flow conditions.
Sampling should be delayed, if possible, when recent flow conditions have been
extremely high or low.
Physicochemical measurements. Water temperature, pH, specific conductance, turbidity
and dissolved oxygen measurements are obtained and recorded.
38
(Version 1.0, November 8, 2018)
Chain of Custody. Sample containers are labeled before leaving the site with waterbody
name, sample reach location, collection card number, initials of collectors, and date of
collection.
3.2
Pre-sampling Site Assessment
3.2.1 Conditions and Flow
The target stream reach for sampling is 100 meters in length. Before sampling a site,
survey the upstream and downstream segments for adequate available habitat and note
any potential adverse conditions that may affect biological communities (e.g.
unrestricted cattle access to the stream, all-terrain vehicle crossings, etc.).
3.2.2 Habitat Assessment
A habitat assessment should be completed for all collections using the directions given
on the habitat assessment form. In most areas, it is obvious whether the
Mountain/Piedmont habitat form (Appendix A) or the Coastal Plain habitat form
(Appendix B) should be used. In some transitional areas, however, a field decision must
be made as to which form to use. If the stream is naturally rocky with a riffle-pool
sequence then the Mountain/Piedmont habitat form should be used, even if the Level IV
ecoregion (Griffith et al., 2001) map puts the site in the coastal plain. The reverse is true
for a naturally sandy, low gradient stream located on the map in the Piedmont, but near
a coastal plain ecoregion.
In addition to above assessment, an evaluation of benthic quality should be performed
and recorded on the benthos collection card at Appendix C. Field observations should
include:
Immediate watershed. Record type of land use, extent of disturbed land, any floodplain
deposition of sediment, any evidence of stream widening and/or infill, presence of
upstream tributaries or dams (including beaver dams), evidence of recent water level
changes such as leaf packs out of water, submerged terrestrial vegetation and/or
sediment on vegetation above water level, any livestock with access to stream, any
point sources and any unique habitats. These observations should generally be limited
to the view-shed of the field crew from the upper end of the sample reach.
Substrate. Two collectors make independent visual estimates of substrate percentages
and the average values are recorded on the collection card. Also note embedded
substrate (interstitial spaces filled with sand); any atypical habitats such as bridge
rubble, large bedrock or other rock outcrops or unusual geological formations, abrupt
changes in slope, presence of normal riffle-pool sequence (riffles spaced at intervals
equal to 5-7 times bankfull stream width), any large areas of unstable coarse sand or
movement of bedload material and amount of substrate covered with periphyton or silt.
39
(Version 1.0, November 8, 2018)
Width. Measure the wetted width of the stream using a tape measure at two points that
are representative of the area sampled. Any unusual characteristics, such as a braided
channel, should also be noted and recorded.
Water. Look for color, odor (especially sewage and/or chlorine), foaming, algal mats,
and oil sheen.
Benthic Community. Note presence of organisms not usually collected such as mussels,
and also any organisms that are very abundant.
The time necessary to collect at a sample reach may vary depending on factors such as
stream size, flow conditions and the degree to which samples are picked in the field.
3.2.3 Physicochemical Measurements
A calibrated water quality sonde or multiple parameter-specific meters should be used
to measure the following: temperature, pH, specific conductance, turbidity and
dissolved oxygen. The five values are recorded on both the habitat form and the
collection card.
3.3
Sample Methods
3.3.1 Sample Period
Samples collected from streams north of the Fall Line in Georgia should be sampled
April 1 to June 30. This includes all of Ecoregions 45, 66 and 67. Streams lying south
of the Fall Line, including all of Ecoregions 65 and 75, should be sampled January 15 to
March 15.
3.3.2 Modified Qual-4 Method
The field sampling method used to assess biological conditions of Georgia streams for
the Clean Water Act, Section 404 regulatory program is modified from the Qual-4
method used by the North Carolina Division of Water Resources (NCDEQ, 2016).
Using the Modified Qual-4 method, four collections are made:
one riffle-kick
one sweep
one leaf-pack
visual
40
(Version 1.0, November 8, 2018)
Invertebrates may be picked from the sample in the field using forceps and picking
trays, and preserved in glass vials containing 95% ethyl alcohol. The Georgia Interim
Stream Quantification Tool relies on proportions of total taxa richness metrics.
Therefore, it is critical that all representative taxa of the entire macroinvertebrate sample
be picked from each of the collections. Alternatively, detritus collected during sampling
may be preserved in the field and returned to the laboratory for picking. In either case,
there is no need to pick and/or retain all individuals of every taxon. Instead, 3-5
specimens of each taxa should be adequate to ensure accurate identification.
3.3.2.1
Riffle-kick Collection
Approximately two square meters of substrate, sampled from at least two unique riffles
in the sample reach, should be disturbed for a typical riffle-kick collection. Rocks that
are highly embedded or too large to be dislodged should be moved by hand, if possible.
Rocks too large to be moved safely should be manually "scrubbed down" to dislodge
organisms. Careful attention should be made throughout the kick to manually dislodge
taxa such as Neophylax, Goera, Glossosoma, Epeorus, Drunella, etc. that are
particularly adept at maintaining robust contact with substrates. In addition, if
Podostemum or other mosses are present on the substrate in your riffle kick, make
certain to "scrub" these "vegetated" surfaces down as numerous unique taxa are
associated with these habitats (e.g., Micrasema).
North of the Fall Line, rocks, cobble, and gravel are typically plentiful and obtaining a
"traditional" riffle-kick in rocky substrate is straightforward. South of the Fall Line (and in
some sandy piedmont streams), rocky substrates are either absent or buried. In such
instances, riffle-kick collections can still be obtained by targeting log jams, stick and leaf
packs, debris dams, sandy runs, and gravel. In such situations, the same general two
meters of bottom substrate should be disturbed to obtain the collection. Before initiating
a riffle-kick, make certain the bottom of the net is in full contact with the bottom of the
stream channel. If there are gaps between the substrate surface and the bottom of the
net, organisms will be missed. This issue is a particular concern in areas of high
velocity. While sampling, it is also a good idea to remove fresh ("un-seasoned")
fragments of leaves, sticks, as well as trash that are likely not harboring organisms.
As in all aspects of benthic macroinvertebrate sampling, extreme caution should be
used in obtaining a kick in turbid water or in water that is exceeding base flow during the
sample. Aside from the obvious safety concerns for the field crew, sampling in turbid
water may mask the presence of some available habitats while sampling in discharges
exceeding base flow may lead either to sampling areas that might be dry during lower
flow conditions or by making some critical habitats inaccessible. In such instances,
careful attention should be made to identify the thalweg and concentrate the riffle kick
collection in these areas.
After the collection has been obtained, it is advisable to fold the net over itself to keep
organisms from escaping and to keep the net as level as possible until it is placed in the
41
(Version 1.0, November 8, 2018)
rinse bucket. Remove non-target taxa, such as fish, mussels and amphibians. Rinse
until the net is free of debris and check for attached organisms. Dump the sample from
the bucket into a tub or tray for picking and make sure to wash the remaining debris
from the bucket into the tub or tray to ensure all material is retained for examination.
3.3.2.2
Sweep Collection
A sweep is defined as a timed 10-minute collection that targets macrophytes, root
mats/undercut banks, and detritus deposits in approximate proportion to their
abundance in the sample reach. Note that the 10-minute timeframe is based on actual
collecting/sampling of habitats; not including the time required to walk between target
habitat types in different areas of the sample reach. If available habitats for sweep
sampling are so limited that 10 minutes of sampling is impractical, describe this on the
benthos collection card (Appendix C).
Not all streams will have the same habitat components, and sweeps of root mats,
undercut banks, detritus deposits and macrophytes should target areas of differing flow
regimes. Obtaining a sweep from only one zone of current velocity should be avoided
and may require a search of the entire reach to find suitable habitat in a variety of
current velocities. In waterbodies where there is a lack of well-developed root mats,
undercut banks or macrophytes, supplemental sweeps can be made on large bedrock
or boulder substrates, particularly if moss or Podostemum is present. An effective way
to do this is to place the sweep net flush to the substrate below the area of interest and
then to mechanically "scrub" the surface. In addition to this supplemental sweep, riffle
areas of substrate that were possibly under-sampled during the kicks (e.g., small gravel)
can also be targeted. Typically, sand or gravel riffles can be kicked by placing the
sweep net downstream of the target area and then disturbing the targeted portion of the
substrate. In addition, in areas of slack flow (typically near the shoreline) look for silty
areas, and within these areas of silt deposition look carefully for holes (the diameter of a
small nail) that could indicate the presence of burrowing mayflies. Running your sweep
net a few inches into this silt will likely result in the collection of these taxa.
Given their close proximity to the surface of the water, root mats, undercut banks, and
macrophytes are particularly susceptible to temporary drying or brief inundation related
to droughts or spates. Therefore, if sampling is being conducted during periods of
higher-than-normal flows, it is imperative to compensate for the temporary inundation of
apparent habitat that (while currently wetted) was likely dry before the increased
discharge. In such instances, it is advisable to conduct your sweep from depths deeper
than normal.
Regardless of flow levels, it is always advisable with this collection type to collect from
the habitat starting downstream and working in the upstream direction. This practice
will prevent sediment from being introduced into uncollected habitat downstream. In
general, the cumulative amount of material collected in the sweep net should be just
slightly larger than a softball. When the collection is complete, dump the material from
42
(Version 1.0, November 8, 2018)
the net into the tub or tray making sure to backwash the remaining debris from the net
into the tub or tray to ensure all material is processed. A careful examination of the net
should be made to remove any attached organisms.
3.3.2.3
Leaf-pack Collection
The investigator should not expend too much effort searching for leaf-packs in areas of
reduced flow unless that is the only flow regime present. Careful attention should be
made to the condition of the leaf material comprising the pack. Fresh material should
not be targeted. If collected together with suitable material, it should be discarded
during the elutriation process. Leaf packs should be comprised of well-conditioned
material, generally brown to dark brown in color. Black leaves, consistent with anoxic
conditions, should be avoided unless that is the only material present. Often when
working in the mountains, Rhododendron is the dominant leaf type--particularly in small
streams and at higher altitudes. While this material (if properly conditioned) is suitable,
it is not ideal, and reasonable effort should be expended in obtaining deciduous leaf
material. Similarly, when working in the coastal plain, American holly (Ilex opaca) is
often a large constituent of leaf pack material. While this is suitable substrate if
conditioned, effort should also be made to target deciduous material when possible.
Sticks are often collected with leaf material, but are not the primary target of this
collection. Unless it is the only material present, grass clippings and other weedy debris
should not be used as part of this collection type. Obtaining a leaf-pack during high
flows can be problematic as material currently in flow may actually have been only very
recently deposited and thus not consistently exposed to water and not adequately
conditioned. To avoid this condition, always target leaf-packs in the deepest areas of
the flow to ensure maximum exposure to water. Avoid taking your entire collection from
just one area within the sample reach. It is always best to take from multiple leaf packs
(regardless of type) from various areas throughout the reach to ensure as
representative a collection as possible.
In general, half the volume of the wash bucket is sufficient for a typical leaf-pack. More
material is acceptable, but will result in more time spent in the elutriation process. In
either case, elutriation is a crucial step in order to reduce the volume of the sample to a
manageable size for picking. To elutriate a sample, submerge the bucket to a
maximum of about two inches from the top of the bucket and grab a small handful of
material. Work the material between your fingers while rapidly washing it in the
standing water of the wash bucket. Washing should be a vigorous process and is
intended (along with working the material in your hand) to dislodge invertebrates from
the leaf material and to deposit them into the rinse bucket. Repeat this process until the
volume of the sample in the bucket is reduced to about two to three inches in depth.
During the elutriation process, it is advisable to rinse the elutriated material by filling the
bucket to within one inch of the top and rotating the bucket by the handle rapidly
clockwise and counterclockwise until the water is drained. This technique is particularly
useful in silty or muddy conditions since rinsing the collection of excessive silt will result
43
(Version 1.0, November 8, 2018)
in clearer water in the picking tray and thus, an easier and more accurate field pick of
the sample.
3.3.2.4
Visuals
Ideally, three investigators participate in this portion of the field collection, which is done
after all other collections have been made and field-picked. Approximately 10 minutes
should be allotted for visual collections, for a cumulative visual collection occurring over
a 30-minute period. If a two-member (or one-member) crew is performing the
collection, then the time spent on this collection by each investigator should be
increased as appropriate to total a combined 30 minutes. Often, in areas of very poor
habitat or very poor diversity, 10 minutes will provide more than enough time to obtain a
representative collection. In areas of high habitat heterogeneity or very high diversity,
even 15 minutes may not allow for enough time to obtain a good collection.
The intent of the visual collection is to specifically target microhabitats that were either
not sampled within any of the other collection methods or were under-collected.
Examples generally include very large substrates (e.g., logs and boulders) in areas of
very high or very low flow. For example, the undersides of rocks in pools and areas of
slow flow, as well as cracks and crevices in rocks in the same areas should be
examined closely. Rotate the rock in multiple orientations to make maximum use of
ambient light and to reduce glare. This approach will promote finding small or cryptic
taxa. Also, it is often helpful to gently splash water onto substrate surfaces as the
disruption of the brief surface tension will reveal the presence of many small organisms
that are otherwise hard to see.
In areas of high to medium flows, pay close attention for the presence of mineral-cased
caddisflies that are often recessed into rock crevices (e.g., Neophylax) or sometimes
found firmly adhered to the surface of the rock (e.g., Glossosoma). These taxa are
often not dislodged during the riffle-kick collections, so effort must be made to target
them during visuals. Similarly, many mayflies (e.g., Epeorus) that are adapted to
clinging tightly to surfaces in fast current will sometimes not be dislodged during the
riffle-kick and thus, must be searched for during visual collections.
It is strongly advised to pack at least three extra vials to be used solely for visual
collections; this prevents loss in the event of a dropped vial. Visual collections are
made at the end of the assessment in order to facilitate the identification of undersampled habitats. Time spent on visual collections (per investigator and cumulative)
should be noted on the benthos collection card (Appendix C).
4.0
DATA PROCESSING
The Georgia Interim Stream Quantification Tool (GA SQT) utilizes assessment metrics
based on proportions of total taxa richness, rather than actual percentages of organisms
present in the sample. Consequently, while all representative taxa in the entire
44
(Version 1.0, November 8, 2018)
macroinvertebrate sample (i.e. all four collections per sample reach) must be picked for
identification to obtain accurate taxa richness data; actual enumeration of all specimens
per taxa is not required.
Each taxon must be identified and assigned to its respective habit and trophic habit
listed on the "Georgia SQT Macroinvertebrate Traits" table available on the Corps
Savannah District's Regulatory In-Lieu Fee and Bank Information Tracking System
(RIBITS) web page. Taxa missing from the above-referenced table must be assigned
habit and trophic habit following nomenclature in Poff et al. (2006) (Table 1). Existing
databases compiled by Vieira et al. (2006) and should be consulted first. Taxa absent
from each of these references may be assigned habit and trophic habit based on other
commonly accepted references (e.g. Merritt et al., 2008), so long as the reference is
identified within the sample record.
Table 1.
Habit and trophic habit nomenclature, following Poff et al. (2006).
ID
1
2
3
Habit
Burrower
Climber
Sprawler
ID
1
2
3
4
5
6
Clinger
Swimmer
Skater
4
5
Trophic Habit
Collector-Gatherer
Collector-Filterer
Herbivore (Scraper,
Piercer)
Predator
Shredder (Detritivore)
The proportion of total genus-level taxa richness of the sample comprising each habit
and trophic habit is computed. A list of all sampled taxa and corresponding habit and
trophic habit designations must be provided to the Corps and IRT in a single Microsoft
Excel worksheet. The same workbook should also include additional dedicated
worksheets (aka "tabs") reflecting the electronic transfer of all field data collected on
habitat sheets (Appendices A or B, as applicable) and the benthos collection card
(Appendix C). Thus, one Microsoft Excel workbook (aka "file") per sample reach should
contain three worksheets representing a complete digital record of the sample site, its
sampled macroinvertebrate community assemblage and its physicochemical and habitat
conditions.
4.1
Piedmont and Blue Ridge Ecoregions
In the Piedmont (Ecoregion 45) and Blue Ridge (Ecoregion 66), the following selected
metrics are utilized in the GA SQT:
45
(Version 1.0, November 8, 2018)
Proportion Genus-level EPT4 Richness
Proportion Genus-level Clinger Richness
Proportion Genus-level Shredder Richness
Proportion Genus-level Burrower Richness
The proportion-based values of the reference dataset were standardized according to
the percent-of-standard method (Barbour et al. 1999) using "ceilings" and "floors" to limit
the influence of biological assemblages corresponding to values outside of the 95th
percentile and 5th percentile. Standardization equations in Table 2, use the specific
"ceiling" and "floor" values for each assessment metric in each ecoregion as presented
in Table 3. If a standardized assessment metric value for any given sample is greater
than 100 (i.e. a data value above the 95th percentile of the reference data), it must be
corrected to equal 100. Similarly, if a standardized assessment metric value is less
than 0 (i.e. a data value below the 5th percentile of the reference data), it must be
corrected to equal 0.
The "Georgia Stream Quantification Tool" Microsoft Excel workbook, available on the
Corps Savannah District's RIBITS web page, automates these calculations. Users are
required only to enter the "raw" proportion-based values for the above-referenced four
assessment metrics into the "Field Value" cells of the spreadsheet, and those values
are then standardized by the spreadsheet.
Table 2.
Standardization equations for benthic macroinvertebrate measurement
methods for the Piedmont and Blue Ridge ecoregions.
Standardized Proportion
Genus-level EPT
Richness
Standardized Proportion
Genus-level Clinger
Richness
Standardized Proportion
Genus-level Shredder
Richness
Standardized Proportion
Genus-level Burrower
Richness
4
=
=
=
=
( -)
(-)
* 100
( -)
(-)
* 100
( -)
(-)
* 100
(- )
(-)
* 100
Equation (1)
Equation (2)
Equation (3)
Equation (4)
Taxa in the Ephemoptera, Plecoptera and Trichoptera orders (i.e. mayflies, stoneflies and caddisflies).
46
(Version 1.0, November 8, 2018)
Table 3.
Ceiling and floor values used to standardize raw proportion metrics
according to Equations 1 through 4.
Metric
Proportion Genus-level EPT
Richness
Proportion Genus-level
Clinger Richness
Proportion Genus-level
Shredder Richness
Proportion Genus-level
Burrower Richness
4.2
Ceiling
Floor
Ceiling
Floor
Ceiling
Floor
Ceiling
Floor
Piedmont
43.4
9.7
48.0
24.0
16.2
3.3
30.0
14.6
Blue
Ridge
66.7
16.4
56.9
20.0
23.3
7.7
30.3
8.2
Coastal Plain Ecoregions
<<< Under development >>>
5.0
REFERENCES
Barbour, M.T., J. Gerritsen, B.D. Snyder and J.B. Stripling. 1999. Rapid Bioassessment
Protocols for Use in Streams and Wadeable Rivers: Periphyton, Benthic
Macroinvertebrates and Fish, Second Ed. EPA-841-B-99-002. U.S. Environmental
Protection Agency; Office of Water; Washington, D.C.
Griffith, G.E., J.M. Omernik, J.A. Comstock, S. Lawrence, and T. Foster, T. 2001.
Ecoregions of Georgia: Corvallis, Oregon, U.S. Environmental Protection Agency (map
scale 1:1,500,000).
Merritt, R.W., K.W. Cummins and M.B. Berg (eds). 2008. An Introduction to the Aquatic
Insects of North America. Fourth edition. Kendall Hunt Publishing Co. Dubuque, IO.
NCDEQ. 2016. Standard Operating Procedures for the Collection and Analysis of
Benthic Macroinvertebrates. North Carolina Department of Environmental Quality,
Division of Water Resources. Raleigh, North Carolina. February 2016.
Poff, N.L., J.D. Olden, N.K.M. Vieira, D.S. Finn, M.P. Simmons and B.C. Kondratieff.
2006. Functional trait niches of North American lotic insects: traits-based ecological
applications in light of phylogenetic relationships. Journal of the North American
Benthological Society 25(4): 730-755.
47
(Version 1.0, November 8, 2018)
Vieira, N.K.M., N.L. Poff, D.M. Carlisle, S.R. Moulton II, M.K. Koski, and B.C.
Kondratieff. 2006. A database of lotic invertebrate traits for North America: U.S.
Geological Survey Data Series 187. http://pubs.water.usgs.gov/ds187
6.0
APPENDICES
Habitat Assessment Field Data Sheet: Mountains/Piedmont Streams (Ecoregions 45, 66
and 67)
Habitat Assessment Field Data Sheet: Coastal Plain Streams (Ecoregions 65 and 75)
Benthos Collection Card
48
(Version 1.0, November 8, 2018)
Appendix A Mountain/Piedmont Habitat Assessment Form
10/2018
Habitat Assessment Field Data Sheet
Mountain/ Piedmont Streams
TOTAL SCORE________
Directions for use: The observer is to survey a minimum of 100 meters of stream, preferably in an upstream direction starting above the bridge pool and the
road right-of-way. The segment which is assessed should represent average stream conditions. To perform a proper habitat evaluation the observer needs to get
into the stream. To complete the form, select the description which best fits the observed habitats and then circle the score. If the observed habitat falls in
between two descriptions, select an intermediate score. A final habitat score is determined by adding the results from the different metrics.
Stream_______________________Location/road: ___________________________Lat/Long___________________________ County_______________
Date_______________Site#_______________Basin______________________HUC8__________________________ Ecoregion____________________
Drainage Area (sq mi)__________ Observer(s)______________________________________________________________________________________
Water Quality: Temperature_______0C
pH________ DO _______mg/l
Specific conductance______µS/cm Turbidity_______ntu
Physical Characterization: Visible land use refers to immediate area that you can see from sampling location - include what you estimate driving thru
the watershed in watershed land use.
Visible Land Use:
______%Forest
Commercial ______%Industrial
Watershed land use :
______%Residential
______%Active Pasture
_______% Active Crops
_____%Fallow Fields ______%
______%Other - Describe:_____________
Forest Agriculture Urban Animal operations upstream
Width: (meters) Wetted_________ Channel (at top of bank)_______ Bankfull _______
Stream Depth: (m) Avg______Max _____
Bank Height (from deepest part of riffle to top of bank): (m)________
Bank Angle: _________ º or NA
(Vertical is 90º, horizontal is 0º. Angles > 90º indicate slope is towards mid-channel, < 90º indicate slope is away
from channel. NA if bank is too low for bank angle to matter).
Channelized Ditch
Deeply incised-steep, straight banks Both banks undercut at bend
Recent overbank deposits
Bar development
Channel filled in with sediment
Buried structures
49
Exposed bedrock
Appendix A Mountain/Piedmont Habitat Assessment Form
Excessive periphyton growth
Heavy filamentous algae growth Green tinge
Sewage smell
Manmade Stabilization: N Y: Rip-rap, cement, gabions Sediment/grade-control structure Berm/levee
Flow conditions : High Normal Low
Turbidity: Clear Slightly Turbid Turbid Tannic Milky Colored (from dyes)
Good potential for Wetlands Restoration Project?? YES NO Details____________________________
_________________________________________________________________________________________
Channel Flow Status
Useful especially under abnormal or low flow conditions.
A. Water reaches base of both lower banks, minimal channel substrate exposed ............................
B. Water fills >75% of available channel, or <25% of channel substrate is exposed........................
C. Water fills 25-75% of available channel, many logs/snags exposed.............................................
D. Root mats out of water.................................................................................................... ...............
E. Very little water in channel, mostly present as standing pools.....................................................
Weather Conditions:_______________________________________________ Photo Nos: ____________________________
Remarks:
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
I. Channel Modification
Score
A. channel natural, frequent bends........................................................................................................
5
B. channel natural, infrequent bends (channelization could be old)......................................................
4
C. some channelization present.............................................................................................................. 3
D. more extensive channelization, >40% of stream disrupted............................................................... 2
E. no bends, completely channelized or rip rapped or gabioned, etc..................................................... 0
Evidence of dredging Evidence of desnagging=no large woody debris in stream Banks of uniform shape/height
Remarks_____________________________________________
Subtotal____
II. Instream Habitat: Consider the percentage of the reach that is favorable for benthos colonization or fish cover. If >70% of the reach is rocks, 1 type is
present, circle the score of 17. Definition: leafpacks consist of older leaves that are packed together and have begun to decay (not piles of leaves in pool areas).
Mark as Rare, Common, or Abundant.
____Rocks ____Macrophytes ____Sticks and leafpacks ____Snags and logs ____Undercut banks or root mats
50
Appendix A Mountain/Piedmont Habitat Assessment Form
AMOUNT OF REACH FAVORABLE FOR COLONIZATION OR COVER
>70%
40-70%
20-40%
Score
Score
Score
4 or 5 types present.................
20
16
12
3 types present.........................
19
15
11
2 types present.........................
18
14
10
1 type present...........................
17
13
9
No types present.......................
0
No woody vegetation in riparian zone
Remarks________________________________________
<20%
Score
8
7
6
5
Subtotal_____
III. Bottom Substrate (silt, sand, detritus, gravel, cobble, boulder) Look at entire reach for substrate scoring, but only look at riffle for embeddedness, and
use rocks from all parts of riffle-look for "mud line" or difficulty extracting rocks.
A. substrate with good mix of gravel, cobble and boulders
Score
1. embeddedness <20% (very little sand, usually only behind large boulders).........................
15
2. embeddedness 20-40%..........................................................................................................
12
3. embeddedness 40-80%..........................................................................................................
8
4. embeddedness >80%.............................................................................................................
3
B. substrate gravel and cobble
1. embeddedness <20%............................................................................................................
14
2. embeddedness 20-40%.........................................................................................................
11
3. embeddedness 40-80% ........................................................................................................
6
4. embeddedness >80%............................................................................................................
2
C. substrate mostly gravel
1. embeddedness <50%............................................................................................................
8
2. embeddedness >50%............................................................................................................
4
D. substrate homogeneous
1. substrate nearly all bedrock............................................................................................. ......
3
2. substrate nearly all sand ........................................................................................................
3
3. substrate nearly all detritus....................................................................................................
2
4. substrate nearly all silt/ clay...................................................................................................
1
Remarks__________________________________________________________________________________Subtotal_____
IV. Pool Variety Pools are areas of deeper than average maximum depths with little or no surface turbulence. Water velocities associated with pools are
always slow. Pools may take the form of "pocket water", small pools behind boulders or obstructions, in large high gradient streams, or side eddies.
A. Pools present
Score
1. Pools Frequent (>30% of 200m area surveyed)
a. variety of pool sizes...............................................................................................................
10
b. pools about the same size (indicates pools filling in)............................................................
8
51
Appendix A Mountain/Piedmont Habitat Assessment Form
2. Pools Infrequent (<30% of the 200m area surveyed)
a. variety of pool sizes...............................................................................................................
b. pools about the same size......................................................................................................
B. Pools absent............................................................................................................................................
6
4
0
Subtotal_____
Pool bottom boulder-cobble=hard Bottom sandy-sink as you walk Silt bottom Some pools over wader depth
Remarks_________________________________________________________________________
Page Total_____
V. Riffle Habitats
Definition: Riffle is area of reaeration-can be debris dam, or narrow channel area.
Riffles Frequent
Score
A. well defined riffle and run, riffle as wide as stream and extends 2X width of stream.... 16
B. riffle as wide as stream but riffle length is not 2X stream width .................................... 14
C. riffle not as wide as stream and riffle length is not 2X stream width ............................. 10
D. riffles absent................................................................................................................... 0
Channel Slope: Typical for area Steep=fast flow Low=like a coastal stream
Riffles Infrequent
Score
12
7
3
VI. Bank Stability and Vegetation
A. Erosion
1. No, or very little, erosion present ........................................... 7
2. Erosion mostly at outside of meanders ................................... 6
3. Less than 50% of banks eroding ............................................. 3
4. Massive erosion ...................................................................... 0
Erosion Score_____
B. Bank Vegetation
1. Mostly mature trees (>12" DBH) present .............................. 7
2. Mostly small trees (<12" DBH) present, large trees rare ...... 5
3. No trees on bank, can have some shrubs and grasses ............ 3
4. Mostly grasses or mosses on bank ......................................... 2
5. Little or no bank vegetation, bare soil everywhere ................ 0
Vegetation Score______
Remarks_______________________________________________________________________________
Subtotal_____
Subtotal______
VII. Light Penetration Canopy is defined as tree or vegetative cover directly above the stream's surface. Canopy would block out sunlight when the sun is
directly overhead. Note shading from mountains, but not use to score this metric.
Score
A. Stream with good canopy with some breaks for light penetration .............................................
10
B. Stream with full canopy - breaks for light penetration absent.....................................................
8
C. Stream with partial canopy - sunlight and shading are essentially equal....................................
7
D. Stream with minimal canopy - full sun in all but a few areas.......................................................
2
E. No canopy and no shading.............................................................................................................
0
52
Appendix A Mountain/Piedmont Habitat Assessment Form
Remarks____________________________________________________________________________
Subtotal______
VIII. Riparian Vegetative Zone Width
Definition: Riparian zone for this form is area of natural vegetation adjacent to stream (can go beyond floodplain). Definition: A break in the riparian zone is any
place on the stream banks which allows sediment or pollutants to directly enter the stream, such as paths down to stream, storm drains, uprooted trees, otter
slides, etc.
FACE UPSTREAM
Lft. Bank Rt. Bank
Dominant vegetation: Trees Shrubs Grasses Weeds/old field Exotics (kudzu, etc)
Score
Score
A. Riparian zone intact (no breaks)
1. width > 18 meters.....................................................................................
5
5
2. width 12-18 meters...................................................................................
4
4
3. width 6-12 meters.....................................................................................
3
3
4. width < 6 meters......................................................................................
2
2
B. Riparian zone not intact (breaks)
1. breaks rare
a. width > 18 meters.........................................................................
4
4
b. width 12-18 meters.......................................................................
3
3
c. width 6-12 meters.......................................................................
2
2
d. width < 6 meters.........................................................................
1
1
2. breaks common
a. width > 18 meters.........................................................................
3
3
b. width 12-18 meters......................................................................
2
2
c. width 6-12 meters.......................................................................
1
1
d. width < 6 meters.........................................................................
0
0
Remarks________________________________________________________________________
Subtotal______
Page Total_______
Disclaimer-form filled out, but score doesn't match subjective opinion-atypical stream.
53
TOTAL SCORE_______
Appendix A Mountain/Piedmont Habitat Assessment Form
Supplement for Habitat Assessment Field Data Sheet
Diagram to determine bank angle:
90º
45º
135º
Typical Stream Cross-section
Extreme High Water
Normal High Water
Normal Flow
Upper Bank
This side is 45º bank angle.
Lower
Bank
Stream Width
54
Appendix A Mountain/Piedmont Habitat Assessment Form
Site Sketch:
Other comments:__________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
55
Appendix B Coastal Plain Assessment Form
Habitat Assessment Field Data Sheet
Coastal Plain Streams
10/2018
TOTAL SCORE________
Directions for use: The observer is to survey a minimum of 100 meters of stream, preferably in an upstream direction starting above the bridge pool and the
road right-of-way. The segment which is assessed should represent average stream conditions. To perform a proper habitat evaluation the observer needs to get
into the stream. To complete the form, select the description which best fits the observed habitats and then circle the score. If the observed habitat falls in
between two descriptions, select an intermediate score. A final habitat score is determined by adding the results from the different metrics.
Stream_______________________Location/road: ___________________________Lat/Long___________________________ County______________
Date_______________ Site#_______________ Basin______________________ HUC8_____________________ Ecoregion________________________
Drainage Area (sq mi)___________ Observer(s)______________________________________________________________________________________
Water Quality: Temperature _______C
pH________ DO _______mg/l
Turbidity_______ntu
Specific conductance ________µS/cm
Physical Characterization: Visible land use refers to immediate area that you can see from sampling location. Check off what you observe driving thru
the watershed in watershed land use.
Visible Land Use:
______%Forest
______%Residential
_____%Fallow Fields ______% Commercial ______%Industrial
______%Active Pasture
_______% Active Crops
______%Other - Describe:_____________
Watershed land use Forest Agriculture Urban Animal operations upstream
Width (meters): Wetted_________ Channel (at top of bank)_______ Bankfull_______ Stream Depth (m): Avg______Max ______
Bank Height (from deepest part of channel to top of bank): (m)________
Flow conditions : High Normal Low
Channel Flow Status :
Useful especially under abnormal or low flow conditions.
A. Water reaches base of both banks, minimal channel substrate exposed ......................................
B. Water fills >75% of available channel, or <25% of channel substrate is exposed........................
C. Water fills 25-75% of available channel, many logs/snags exposed.............................................
D. Root mats out of water.................................................................................................... ..............
56
Braided channel
Appendix B Coastal Plain Assessment Form
E. Very little water in channel, mostly present as standing pools.....................................................
Turbidity: Clear Slightly Turbid
Turbid
Tannic Milky Colored (from dyes) Green tinge
Channelized ditch
Deeply incised-steep, straight banks Both banks undercut at bend
Recent overbank deposits
Excessive periphyton growth
Manmade Stabilization: N
Channel filled in with sediment
Sewage smell
Bar development
Heavy filamentous algae growth
Y: Rip-rap, cement, gabions Sediment/grade-control structure Berm/levee
Weather Conditions:_______________________________________Photo Nos: _______________________________
Remarks:____________________________________________________________________________________________
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
TYPICAL STREAM CROSS SECTION DIAGRAM
Typical Stream Cross-section
Extreme High Water
Normal High Water
Normal Flow
Upper Bank
Lower
Bank
Stream Width
This side is 45º bank angle.
57
Appendix B Coastal Plain Assessment Form
I. Channel Modification
A. Natural channel-minimal dredging................................................................................
B. Some channelization near bridge, or historic (>20 year old), and/or bends beginning to reappear..
C. Extensive channelization, straight as far as can see, channelized ditch..........................
D. Banks shored with hard structure, >80% of reach disrupted, instream habitat gone........
Remarks_______________________________________________________________________________
Score
15
10
5
0
Subtotal____
II. Instream Habitat: Consider the percentage of the reach that is favorable for benthos colonization or fish cover. If >50% of the reach is snags, and 1 type is
present, circle the score of 16. Definition: leafpacks consist of older leaves that are packed together and have begun to decay (not piles of leaves in pool areas).
Mark as Rare, Common, or Abundant.
____Sticks ____Snags/logs ____Undercut banks or root mats ____Macrophytes ____Leafpacks
AMOUNT OF REACH FAVORABLE FOR COLONIZATION OR COVER
>50%
30-50%
10-30%
<10%
Score
Score
Score
Score
4 or 5 types present.................
20
15
10
5
3 types present.........................
18
13
8
4
2 types present.........................
17
12
7
3
1 type present...........................
16
11
6
2
No substrate for benthos colonization and no fish cover............................................0
No woody vegetation in riparian zone
Remarks________________________________________
Subtotal_____
III. Bottom Substrate (silt, clay, sand, detritus, gravel) look at entire reach for substrate scoring.
A. Substrate types mixed
1. gravel dominant...................................................................................................................
2. sand dominant.....................................................................................................................
3. detritus dominant................................................................................................................
4. silt/clay/muck dominant................................................................................................... ..
B. Substrate homogeneous
1. nearly all gravel..................................................................................................................
2. nearly all sand .......................................................................................................... ..........
3. nearly all detritus................................................................................................................
4. nearly all silt/clay/muck................................................................................................. ....
Score
15
13
7
4
12
7
4
1
Remarks__________________________________________________________________________________Subtotal_____
58
Appendix B Coastal Plain Assessment Form
IV. Pool Variety Pools are areas of deeper than average maximum depths with little or no surface turbulence. Water velocities associated with pools are
always slow.
A. Pools present
Score
1. Pools Frequent (>30% of 100m length surveyed)
a. variety of pool sizes...............................................................................................................
10
b. pools about the same size (indicates pools filling in)............................................................
8
2. Pools Infrequent (<30% of the 100m length surveyed)
a. variety of pool sizes...............................................................................................................
6
b. pools about the same size.......................................................................................................
4
B. Pools absent
1. Deep water/run habitat present............................................................................................................
4
2. Deep water/run habitat absent............................................................................................ ................
0
Subtotal_____
Remarks_________________________________________________________________________
59
Page Total_______
Appendix B Coastal Plain Assessment Form
V. Bank Stability and Vegetation
A. Erosion
1. No, or very little, erosion present ......................................... 10
2. Erosion mostly at outside of meanders ................................... 6
3. Less than 50% of banks eroding ............................................. 3
4. Massive erosion ...................................................................... 0
Erosion Score_____
B. Bank Vegetation
1. Mostly mature trees (>12" DBH) present ............................ 10
2. Mostly small trees (<12" DBH) present, large trees rare ...... 7
3. No trees on bank, can have some shrubs and grasses ............ 4
4. Mostly grasses or mosses on bank......................................... 3
5. Little or no bank vegetation, bare soil everywhere ................ 0
Vegetation Score______
Remarks_______________________________________________________________________________
Subtotal______
VI. Light Penetration (Canopy is defined as tree or vegetative cover directly above the stream's surface. Canopy would block out sunlight when the sun is
directly overhead).
Score
A. Stream with good canopy with some breaks for light penetration .............................................
10
B. Stream with full canopy - breaks for light penetration absent.....................................................
8
C. Stream with partial canopy - sunlight and shading are essentially equal.....................................
7
D. Stream with minimal canopy - full sun in all but a few areas.......................................................
2
E. No canopy and no shading.................................................................................................................
0
Subtotal______
Remarks_____________________________________________________________________________________________
VII. Riparian Vegetative Zone Width
Definition: A break in the riparian zone is any area which allows sediment to enter the stream. Breaks refer to the near-stream portion of the riparian zone
(banks); places where pollutants can directly enter the stream.
Lft. Bank
Score
A. Riparian zone intact (no breaks)
1. zone width > 18 meters.....................................................................................
2. zone width 12-18 meters...................................................................................
3. zone width 6-12 meters.....................................................................................
4. zone width < 6 meters......................................................................................
B. Riparian zone not intact (breaks)
60
5
4
3
2
Rt. Bank
Score
5
4
3
2
Appendix B Coastal Plain Assessment Form
1. breaks rare
a. zone width > 18 meters.........................................................................
b. zone width 12-18 meters.......................................................................
c. zone width 6-12 meters.......................................................................
d. zone width < 6 meters.........................................................................
2. breaks common
a. zone width > 18 meters.........................................................................
b. zone width 12-18 meters......................................................................
c. zone width 6-12 meters.......................................................................
d. zone width < 6 meters.........................................................................
Remarks____________________________________________________________________
4
3
2
1
4
3
2
1
3
2
1
0
3
2
1
0
Subtotal______
Page Total________
TOTAL SCORE ___________