You can copy from here when filling out the rest of the page.
PROJECT NAME: Gainesville Inland Port
COUNTY: Hall
NEAREST WATERBODY: North Oconee River
PROJECT PURPOSE: Intermodal Transportation
PROJECT NAME: Gainesville Inland Port
COUNTY: Hall
NEAREST WATERBODY: North Oconee River
PROJECT PURPOSE: Intermodal Transportation
DEPARTMENT OF THE ARMY
U.S. ARMY CORPS OF ENGINEERS
SAVANNAH DISTRICT
1590 ADAMSON PARKWAY, SUITE 200
MORROW, GEORGIA 30260-1777
Regulatory Division
SAS-2018-00428
December 27, 2018
JOINT PUBLIC NOTICE
Savannah District/State of Georgia
The Savannah District has received an application for a Department of the Army
Permit, pursuant to Section 404 of the Clean Water Act (33 U.S.C. § 1344), as follows:
Application Number: SAS-2018-00428
Applicant: Mr. Tim Evans
Hall County Development Authority
Post Office Box 374
Gainesville, Georgia 30503
Agent:
Mr. Brandon Smith
Hodges, Harbin, Newberry, and Tribble, Incorporated
17 Park of Commerce Boulevard, Suite 110
Savannah, Georgia 31405
Location of Proposed Work: The project site is located north of the intersection of
White Sulphur Road and Hillcrest Drive in the City of Gainesville, Hall County Georgia
(latitude: 34.3557, longitude: -83.7571). The property is located within the Upper North
Oconee River watershed, Hydrologic Unit Code: 0307010104, and the nearest named
water body is the North Oconee River.
Description of Work Subject to the Jurisdiction of the U.S. Army Corps of Engineers:
The applicant proposes to construct a rail intermodal facility which would include
unloading facilities, parking, transfer truck turnarounds, employee common areas, and
other support facilities. Specifically, the project would include: four lead tracks
connecting the facility to the adjoining Norfolk Southern main rail line; intermodal offload
facility with several intermodal cranes; approximately 2.5-miles of circulation roadway;
approximately 4.5-miles of yard and storage tracks; approximately 12-acres of container
storage; 30-feet of fill, on average, at a 2H: 1V earth fill slope; small administration
building and parking; and, one secure checkpoint for truck entrance/exit. The proposed
project would impact 16.7 feet of ephemeral stream, 673.2 feet of intermittent stream,
2,592.7 feet of perennial stream, and 0.32-acres of wetland. Impacts to aquatic
resources would result from site grading to accommodate buildings and associated
infrastructure. To mitigate for adverse impacts to aquatic resources, the applicant has
proposed to purchase 10,928 stream credits and 2 wetland credits from Rose Creek
Mitigation Bank, 11,816.5 stream credits from Greensboro Mitigation Bank, and 4,192.5
stream credits from Pritchett Mitigation Bank, all of which are within the primary service
area of the proposed project.
BACKGROUND
This Joint Public Notice announces a request for authorizations from both the U.S.
Army Corps of Engineers and the State of Georgia. The applicant's proposed work may
also require local governmental approval.
STATE OF GEORGIA
Water Quality Certification: The Georgia Department of Natural Resources,
Environmental Protection Division, intends to certify this project at the end of 30 days in
accordance with the provisions of Section 401 of the Clean Water Act, which is required
for a Federal Permit to conduct activity in, on, or adjacent to the waters of the State of
Georgia. Copies of the application and supporting documents relative to a specific
application will be available for review and copying at the office of the Georgia
Department of Natural Resources, Environmental Protection Division, Watershed
Protection Branch, 2 MLK Jr. Drive, Suite 418, Atlanta, Georgia 30334, during regular
office hours. A copier machine is available for public use at a charge of 10 cents per
page. Any person who desires to comment, object, or request a public hearing relative
to State Water Quality Certification must do so within 30 days of the State's receipt of
application in writing and state the reasons or basis of objections or request for a
hearing. The application can be reviewed in the Savannah District, U.S. Army Corps of
Engineers, Regulatory Division.
State-owned Property and Resources: The applicant may also require assent from
the State of Georgia, which may be in the form of a license, easement, lease, permit or
other appropriate instrument.
U.S. ARMY CORPS OF ENGINEERS
The Savannah District must consider the purpose and the impacts of the applicant's
proposed work, prior to a decision on issuance of a Department of the Army Permit.
Cultural Resources Assessment: Environmental Services, Incorporated conducted a
Phase 1 Cultural Resources Survey in May, 2018. No cultural resources were
discovered within the project area. No resources listed on the National Register of
2
Historic Places or potentially eligible historic structures were found within 2,000 feet of
the project location.
Endangered Species: Pursuant to Section 7(c) of the Endangered Species Act of
1973, as amended (16 U.S.C. § 1531 et seq.), we request information from the U.S.
Department of the Interior, Fish and Wildlife Service, the U.S. Department of
Commerce, National Oceanic and Atmospheric Administration, National Marine
Fisheries Service; or, any other interested party, on whether any species listed or
proposed for listing may be present in the area. The applicant provided the Information,
Planning, and Conservation System Report (IPaC). Habitat for Indiana Bat (Myotis
sodalis) and Northern Long-Eared Bat (Myotis septentrionalis) could potentially exist
within the project site. The U.S. Fish and Wildlife Service provided a recommendation
to the applicant on October 24, 2018, that the project may affect, but would not likely
adversely affect the above listed bat species as long as tree clearing occurred outside
of May 16 through July 31.
Public Interest Review: The decision whether to issue a permit will be based on an
evaluation of the probable impact including cumulative impacts of the proposed activity
on the public interest. That decision will reflect the national concern for both protection
and utilization of important resources. The benefit, which reasonably may be expected
to accrue from the proposal, must be balanced against its reasonably foreseeable
detriments. All factors, which may be relevant to the proposal will be considered
including the cumulative effects thereof; among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, historic properties, fish and
wildlife values, flood hazards, flood plain values, land use, navigation, shoreline erosion
and accretion, recreation, water supply and conservation, water quality, energy needs,
safety, food and fiber production, mineral needs, considerations of property ownership
and in general, the needs and welfare of the people.
Consideration of Public Comments: The U.S. Army Corps of Engineers is soliciting
comments from the public; federal, state, and local agencies and officials; Native
American Tribes; and other interested parties in order to consider and evaluate the
impacts of this proposed activity. Any comments received will be considered by the
U.S. Army Corps of Engineers to determine whether to issue, modify, condition or deny
a permit for this proposal. To make this decision, comments are used to assess
impacts on endangered species, historic properties, water quality, general
environmental effects, and the other public interest factors listed above. Comments are
used in the preparation of an Environmental Assessment and/or an Environmental
Impact Statement pursuant to the National Environmental Policy Act. Comments are
also used to determine the need for a public hearing and to determine the overall public
interest of the proposed activity.
Application of Section 404(b)(1) Guidelines: The proposed activity involves the
discharge of dredged or fill material into the waters of the United States. The Savannah
3
District's evaluation of the impact of the activity on the public interest will include
application of the guidelines promulgated by the Administrator, Environmental
Protection Agency, under the authority of Section 404(b) of the Clean Water Act.
Public Hearing: Any person may request, in writing, within the comment period
specified in this notice, that a public hearing be held to consider this application for a
Department of the Army permit. Requests for public hearings shall state, with
particularity, the reasons for requesting a public hearing. The decision whether to hold
a public hearing is at the discretion of the District Engineer, or his designated appointee,
based on the need for additional substantial information necessary in evaluating the
proposed project.
Comment Period: Anyone wishing to comment on this application for a Department
of the Army Permit should submit comments in writing to the Commander, U.S. Army
Corps of Engineers, Savannah District, Attention: Mr. Blake Brannon, 1590 Adamson
Parkway, Suite 200, Morrow, Georgia 30260-1777, no later than 30 days from the date
of this notice. Please refer to the applicant's name and the application number in your
comments.
If you have any questions concerning this matter, please contact Mr. Blake Brannon,
Project Manager, at (678) 422-6570.
Enclosures
1. Location Map
2. Aquatic Resources Map
3. Final Conditions Plan Sheet/Drawing
4
q
"
PROJECT BOUNDARY
(+/- 282.71 ACRES)
Legend
Project Area
File: S:\ArcGIS\Project Lighthouse\Maps\Figure1-VicinityMap.mxd
Figure 1 - Vicinity Map
1
Date: 5/29/2018
0.5
0
GRAPHIC SCALE IN MILES
1
Northeast Georgia
Intermodal Facility
Gainesville/Hall County
Development Authority
Hall County, Georgia
Wetlands
Name Acres
MA
0.33
ME
0.02
MZ
0.06
MD
0.02
FD
0.06
FB
0.15
FC
0.02
FA
0.02
FE
0.02
Total - 0.70 Acres
Streams
Type
Name Feet
Ephemeral
EA
27.51
Ephemeral
EZ
67.41
Intermittent SFF
123.29
Intermittent IB
469.92
Intermittent IC
342.10
Intermittent ID
501.85
Intermittent IE
42.06
Intermittent IZ
121.51
Intermittent IY
53.03
Intermittent IMA
105.47
Intermittent SFI
194.49
Perennial
SMF
653.71
Perennial
SFE
2026.17
Perennial
SFC
2194.18
Perennial
SMB
182.45
Perennial
SFB
186.96
Perennial
SFD
2834.86
Perennial
SMG
362.69
Total - 10489.66
q
PROJECT AREA
(+/- 282.71 ACRES)
"
Legend
Project Area
Waters of the U.S.
Ephemeral Channel (94.91 Feet)
Intermittent Stream (1,953.73 Feet)
Perennial Stream (8,441.02 Feet)
Wetlands (0.70 Acres)
Figure 6 - Delineation Map
2,000
1,000
0
GRAPHIC SCALE IN FEET
2,000
Northeast Georgia Intermodal Facility
Gainesville/Hall County Developement Authority
Hall County, Georgia
Stream Impact
Type
Feet
Ephemeral EZ
16.67
Intermittent IE
42.06
Intermittent ID
501.85
Intermittent SFF
123.29
Intermittent IY
5.96
Perennial SFC
158.94
Perennial SFD
865.28
Perennial SMF
645.03
Perennial SFE
923.48
Total
3,282.56
q
PROJECT BOUNDARY
(+/- 282.71 ACRES)
"
Wetland Impact
Type
Acres
ME
0.02
FB
0.15
FA
0.02
FE
0.02
FD
0.06
MZ
0.05
Total
0.32
Legend
Project Area
Waters of the U.S.
Ephemeral Channel (94.91 Feet)
Intermittent Stream (1,953.73 Feet)
Perennial Stream (8,441.02 Feet)
Wetlands (0.70 Acres)
Wetland Impacts (0.32 Acres)
Stream Impacts (3,282.56 Feet)
Figure 8 - Preferred Alternative
2,000
1,000
0
GRAPHIC SCALE IN FEET
2,000
Northeast Georgia Intermodal Facility
Gainesville/Hall County Developement Authority
Hall County, Georgia