Home

Savannah District

Run scraper

Stewart Tate

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

County: Glynn Nearest Named Waterbody: Brunswick Altamaha Canal Overall Project Purpose: To extinguish a 92.4 acre restrictive covenant.

County: Glynn Nearest Named Waterbody: Brunswick Altamaha Canal Overall Project Purpose: To extinguish a 92.4 acre restrictive covenant.

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS SAVANNAH DISTRICT 100 W OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3640

January 28, 2018 Regulatory Branch SAS-2000-07420 SAS-2000-10430 JOINT PUBLIC NOTICE Savannah District/State of Georgia The Savannah District has received a request to amend the Declaration of Covenants and Restrictions (Restrictive Covenant) associated with Corps permit number SAS2000-07420, as follows: Application Numbers: SAS-2000-07420 & SAS-2000-10430 Applicant: Stewart Tate Brunswick Exit 42, LLC 1031 South Caldwell Street, Suite 220 Charlotte, North Carolina 28208 Agent:

Mr. Daniel Bucey Resource & Land Consultants 41 Park of Commerce Drive, Suite 303 Savannah, Georgia 31405

Location of Proposed Work: The restrictive covenant is located east of Interstate 95, near Exit 42 at State Route 99, in the city of Brunswick, Glynn County, Georgia (Latitude 31.2977, Longitude -81.4765). Description of Work Subject to the Jurisdiction of the U.S. Army Corps of Engineers: To extinguish a 92.4 acre restrictive covenant. BACKGROUND Department of the Army Permit SAS-2000-07420 was issued to Wildlife Realty Associates, L.P. on January 15, 2002 for impacts to waters of the US associated with development of a wildlife park both east and west of Interstate 95, near exit 42, at State Route 99. As compensatory mitigation for the proposed impacts, 90 acres of forested wetlands were placed under restrictive covenant. The restrictive covenant was recorded October 3, 2000. However, the above impacts were never undertaken and the permit has since expired.

In addition, on November 11, 2002, DA permit SAS-2000-10430 was issued to the Glynn County Board of Commissioners (GCBOC) to impact 1.71 acres of wetlands for water and sewer line installation through the property. These wetlands were not originally proposed for impact under the first permit. To mitigate for the impacts, the GCBOC permit authorized the preservation of an additional 2.4 acres of wetland to be included in the existing 90-acre restrictive covenant area. The modified restrictive covenant (for 92.4 acres of wetland preservation) was recorded on April 1, 2003. These impacts were constructed and remain in place. The applicant proposes to extinguish the entire 32.4 acre restrictive covenant. To offset the impacts that have occurred from the water and sewer line installation they propose purchasing 11.3 wetland credits from Wilkinson Oconee mitigation bank. Comment Period: Anyone wishing to comment on this application for a Department of the Army Permit should submit comments in writing to the Commander, U.S. Army Corps of Engineers, Savannah District, Attention: Skye H. Stockel, 100 W. Oglethorpe Avenue Savannah, Georgia 31401-3640, no later than 15 days from the date of this notice. Please refer to the applicant's name and the application number in your comments. If you have any further questions concerning this matter, please contact Skye H. Stockel, Regulatory Specialist, Savannah District at (912) 652-5690. Enclosures: 1. Project Drawings- "Mitigation Map for PAWS", Survey for Wildlife Realty Associates, LP, Dated October 3, 2000 2. Project Description 3. Draft Termination of Restrictive Covenant

2

September 18, 2018 Mr. Shaun Blocker Department of the Army Savannah District, Corps of Engineers 100 W. Oglethorpe Ave. Savannah, Georgia 31401-3604 RE:

Extinguishment of Restrictive Covenant SAS-2000-07420

Dear Mr. Blocker; I refer to Department of the Army Permit SAS-2000-07420 issued to Wildlife Realty Associates, L.P. on January 15, 2002 authorizing impacts to waters of the U.S. for the development of a wildlife park both east and west of Interstate 95, near Exit 42 at State Route 99, in Brunswick, Glynn County, Georgia. I also refer to my letter of March 31, 2017 requesting an amendment to extinguish the existing covenant since the authorized work never occurred. Background As compensatory mitigation for proposed impacts for the Life in the Wild Park, Wildlife Realty Associates, L.P. was required to place 90 acres of forested wetland located south of S.R. 99, east of I-95, and west of the Brunswick/Altamaha Canal under restrictive covenant. The preserved area is described in the attached Restrictive Covenant, recorded in the Superior Court of Brunswick on April 1, 2003, and depicted on the plat Shupe Surveying Company, P.C. titled Survey For: Wildlife Realty Associates, L.P., Mitigation Map For P.A.W.S., A Portion Of The Golden Isles Gateway Tract, dated October 3, 2000. On September 11, 2000, a permit (SAS-2000-10430) was issued to the Glynn County Board of Commissioners (GCBOC) to impact wetlands associated with a water and sewer line, a portion of which is located on the subject property. On November 11, 2002, a subsequent authorization was obtained by GCBOC authorizing a revised utility line route that reduced wetland impacts from 2.34 acres to 1.71 acres. To offset the proposed impacts, the GCBOC permit authorized the addition of 2.4 acres of wetland preservation to be added to the existing 90-acre wetland preservation area required under SAS-200007420. A Restrictive Covenant providing perpetual protection of the 92.4-acre wetland area was recorded in the Glynn County Superior Court on April 1, 2003 (copy attached) The impacts authorized under SAS-2000-07420 were never undertaken, and the permit subsequently expired. The impacts authorized under SAS-2000-10430 to GCBOC were constructed and remain in place. Ownership of the subject property changed hands several times, and the current owners, Brunswick Exit 42, LLC, are requesting that the existing covenant be extinguished. To offset the impacts that have occurred from the utility line installation, the current owners will purchase 11.3 wetland credits from Wilkinson Oconee mitigation bank.

As stated in the Department of the Army document titled Amendments to the Declaration Of Covenants And Restrictions, Department of the Army Corps of Engineers, Savannah District, dated January 7, 2004, Item 3, the following items are required: Requirements:

1. The proponent must submit an alternatives analysis. The analysis should state why the impact to protected mitigation property is preferred over alternatives where impacts to property are not protected by a recorded restrictive covenant or conservation easement. Response: An alternative analysis is not required as the applicant is not proposing impacts within an existing protected mitigation property. The property was protected to offset impacts authorized under permit SAS-2000-07420, which never occurred, and the permit expired on November 30, 2005. The impacts associated with the utility line permit SAS-2000-10430 will be compensated for through the purchase of 11.3 wetland credits from Wilkinson Oconee mitigation bank.

2. Mitigation for impact to the restricted area should be at a minimum, a credit ratio double the Corps standard mitigation Standard Operating Procedures ("SOP"). Response: The applicant is not requesting an amendment to impact a protected mitigation property for a separate project. There are no proposals to conduct dredge or fill activities within the subject wetlands, as the owner currently wishes to conduct normal forestry activities. For the impacts that have already occurred outside of the protected mitigation property by GCBOC, but for which 2.4 acres of protected property was provided as compensatory mitigation, the applicant will offset said impacts by purchasing 11.3 wetland credits from Wilkinson Oconee mitigation bank.

3. Submit a written proposal to amend the original (1) permit and/or (2) restrictive covenant stating the alternatives considered, the proposed impacts to the property, (3) the values and functions of the property to be impacted and (4) the proposed mitigation for the impacts to a protected area. Attach copies of the permit and recorded restrictive covenant. Response: The applicant is not requesting an amendment to the original permit, which has long since expired. The applicant proposes to extinguish the covenant for the original permit that required protection of 90-acres of wetland and the additional 2.4 acres of protected area associated with the GCBOC project, for which the impact occurred outside of the protected area. The applicant will purchase 11.3 wetland credits from Wilkinson Oconee mitigation bank to compensate for the utility line impacts.

4. The proposal will go out on Joint Public Notice for comment and/or to the Agencies for comment. The notice should provide information about the alternatives, the proposed impact to the restricted property, and the mitigation proposed. Response: Since the applicant does not propose to conduct impacts to a protected property for a separate project that may have practicable alternatives, it is our opinion that a public notice is not warranted. The applicant is merely proposing to extinguish a covenant for which the authorized impacts never occurred. 2|Page

For the impacts that occurred on wetlands that were not part of the protected area associated with the GCGOC project, the applicant will purchase 11.3 wetland credits from Wilkson Oconee mitigation bank. The functional replacement of the 1.71 acres of wetland impacted by the utility line project through the purchase of mitigation credits is more applicable to current standards, as it would not be feasible under current guidelines to merely protect 2.4 acres of wetland to offset 1.71 acres of impact.

5. If an amendment to a restrictive covenant is approved, the attorney for the permittee should prepare a "First Amendment to Declaration of Covenants and Restrictions." The document should address: (A) The original permit (provide a copy) (B) The existing restrictive covenant (a copy showing book and page numbers of its recorded location at the county record deeds office) (C) A legal description of the property to be extinguished from the restrictive covenant by metes and bounds (D) A platted survey showing property to be extinguished from the restricted area. This can be done as an overlay on the original platted survey. Response: Upon your approval, the applicant's attorney will provide the above referenced information. Attached is a copy of the recorded restrictive covenant, a legal description of the protected property to be extinguished, and a copy of the recorded plat that depicts the area to be extinguished. We trust that this information will assist you in processing this request. If you have any questions or require additional information, please contact us at your earliest convenience.

Enclosures cc:

Stewart Tate; Shaw Tate Land Investments & Management

3|Page

DEPARTMENT OF THE ARMY PERMIT PERMITTEE:

Fowler Center for Wildlife Education, Inc. Attention: Mr. Jim Fowler c/o Mr. William D. Roose 10619 Mason Road Berlin Heights, Ohio 44814

PERMIT NUMBER: ISSUING OFFICE:

200007420 Savannah District U.S. Army Corps of Engineers Post Office Box 889 savannah, Georgia 31402-0889

NOTE: The term "you" and its derivatives used in this permit, means the permittee or any future transferee. The term "this office" refers to the appropriate District or Division office of the U.S. Army Corps of Engineers having jurisdiction over the permitted activity or the appropriate official of that office acting under the authority of the conunanding officer. You are authorized to perform work in accordance with the terms and conditions specified below. PROJECT LOCATION: The 1,925-acre project site is located between Interstate 95 Exits 38 and 42, north of Brunswick, Glynn County, Georgia-. The project site consist of two development tracts that are divided by I-95, with 671 acres comprising the East Tract (latitude 31°17'39" and longitude 81°28'41") and 986 acres comprising the West Tract (latitude 31°17'4" and longitude 81°32'10"). A 268-acre 300' wide access corridor connects the two tracts. The 90-acre wetland mitigation site is located on the East Tract. PROJECT DESCRIPTION: To impact approximately 22.25 acres of wetlands and other waters of the United States to facilitate development of Jim Fowler's "Life in the Wild" Park. The impacts are 10.15 acres of excavation for pond/lake construction and 12.1 acres of fill for the construction of wildlife exhibits, access roads, parking, and conunercial facilities. Construction of water control structures in wetlands or other waters of the U.S. is authorized, necessary to accomplish wetland enhancement work detailed in the approved compensatory mitigation plan.

Check ff / tq I,,, YI I D !!o J''WD p /;;; A

For $ on

PERMIT CONDITIONS:

General Conditions. l. The time limit for completing the work this Individual Permit ends on November 30, 2005. that you need more time to complete the authorized must submit a request for your permit extension at month prior to the above date.

authorized by If you find activity, you least one

2. You must maintain the activity authorized by this permit in good condition and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party in compliance with General Condition 4 below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area. 3. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the federal and state coordination required to determine if the remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places. 4. If you sell the property associated with this permit, you must obtain the signature of the new owner in the space provided and forward a copy of the permit to this office to validate the transfer of this authorization. 5. If a conditioned Water Quality Certification has been issued for your project, you must comply with conditions specified in the certification as Special Conditions to this permit. For your convenience, a copy of the certification is attached if it contains such conditions. 6. You must allow representatives from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit.

2

Special Conditions. 1. Prior to initiating any authorized work in wetlands, the permittee shall initiate the wetland enhancement activities, as described in the attached document entitled "Revised Compensatory Mitigation Plan, Jim Fowler's Life in the Wild Park" dated November 2000. All wetland enhancement work shall be completed within one year of commencement of such work. The permittee shall also commence monitoring and reporting of mitigation enhancement activities, as detailed in the above plan. 2. Within six months of issuance of this permit, and prior to proceeding with any work authorized under this permit, the perrnittee shall submit for review and final approval, a draft "Restrictive Covenant", necessary to perpetually protect and preserve the wetlands identified as compensatory mitigation on the attached drawing titled, "Jim Fowler's 'Life in the Wild Park'", subtitled "Mitigation Plan Map" and dated August 2000. 3. Within six months of this office's final approval of the above draft "Restrictive Covenant", the permittee shall submit a copy of the final documents that have been notarized and recorded in the office of the Clerk of the Superior Court of Glynn County. 4. Within six months of submission of the recorded "Restrictive Covenant", the permittee shall post appropriate signs along all property boundaries of the compensatory mitigation lands above to guard against unauthorized disturbance to this area.

·s. The impacts to jurisdictional wetlands that are authorized by this permit on the 986 acres of this project known as the "West Tract" are based on the preliminary wetland investigation that was performed by the perrnittee's environmental consultant. Prior to initiating any land disturbing work on the west Tract, the permittee shall: perform a formal wetland delineation on this area, consistent with the "1987 Corps of Engineers Wetland Delineation Manual"; submit a survey of this delineation, along with all required supporting documentation; and obtain our final written verification of this delineation. 6. Of the 22.25 acres of wetland impact authorized by this permit, 9.99 acres are located on the West Tract. As discussed at Special Condition Number 5 of this permit, this 9.99 acre wetland impact is an estimate that is based on a preliminary wetland investigation. Once the final wetlands survey for the · 986 acre West Tract has been verified by this office, the pennittee shall superimpose the approved site development plan on this survey and re-calculate wetland impacts. Should the actual wetland impact (i.e., wetland impact based on the verified wetland survey) exceed 9.99 acres, the perrnittee shall submit an amendment to the compensatory mitigation plan necessary to offset 3

this increase in wetland impact. The mitigation plan amendment, if required, shall provide functional replacement of a type and quantity similar to that provided at the 90 acre on-site wetland enhancement area. 7. For any segment of road within the 1,925 project area that contains wetland crossings, the permittee shall submit a construction plan to this office for review and prior approval. The road construction plan shall contain adequate detail necessary to document that unnecessary impacts to wetlands have been avoided, and unavoidable impacts to wetlands have been minimized to the maximum extend practicable. S. The permittee shall insure implementation of and compliance with the stipulations contained in the attached document entitled "Memorandum of Agreement (MOA), Submitted to the Advisory Council on Historic Preservation, Between the U.S. Army Corps of Engineers, Savannah District and the Georgia State Historic Preservation Officer, DA Permit Application 200007420." 9. The permittee shall insure that the project's master drainage plan is designed and implemented to: avoid direct and/or inadvertent drainage of wetlands; and avoid direct or inadvertent water diversion that would result in a reduction of hydrology in wetlands. The permittee shall also insure that secondary road ditches and/or small after-project drainage ditches do not directly and/or inadvertently impact wetlands. 10. The permittee shall use appropriate erosion and siltation controls and maintain them in effective operating condition during construction. All exposed soil and other fills shall be permanently stabilized at the earliest practicable date. The permittee shall insure that project construction and operation comply with all applicable requirements of the Georgia Sedimentation and Erosion Control Act. 11. The permittee shall comply with all conditions included in the attached Section 401 Water Quality Certification. 12. Prior to initiating any work authorized under this permit, the permittee shall insure that the authorized project is in compliance with all applicable rules, requirements and/or regulations· of the Federal Emergency Management Agency pertaining to construction activities in designated flood plains and/or flood ways, and mapping and/or designating changes to any flood plain and/or floodway that may be affected by the activity. 13. Changes in the layout of facilities and infrastructure on upland portions of the project site (i.e., Site Development Plan, Sheet 2) will not require modification of this permit, and the permittee is not required to coordinate such changes with this office. Minor changes the in footprint of authorized wetland impacts may be authorized under this permit, 4

provided: the proposed minor change would result in no additional impact to the specific wetland area (i.e., swapping of wetland impact acreage from one permitted wetland fill site to another is not considered a minor change); and the permittee submits a change request and obtains prior written concurrence from this office. Any proposed change to the project that would result in additional impacts to wetlands would require formal modification of the permit. 14. Until expiration of the permit, the perrnittee shall remain solely responsible for insuring permit compliance within the entire 1,925 acre project area. Furthermore, the permittee shall remain solely responsible for any unauthorized impacts to any wetlands located within the entire project area. In other words, as long as the permit is valid, the permittee shall be solely responsible for all permit compliance and for any unauthorized wetland impacts regardless of property ownership. 15. The permittee shall obtain fill material from a high ground borrow area that is free of contaminants and pollutants. 16. The permittee shall develop and implement a 5-year wildlife hazard monitoring and action plan, for the entire 1,925 project area. At a minimum, this plan shall entail monitoring of the following: excessive ponding of water at the mitigation site; dead and/or dying trees within the mitigation site; increased presence of birds in the mitigation site and/or in wetland pasture areas; and any increase in the resident population of native wildlife that could constitute a hazard to the Glenco Jetport. Should monitoring identify a potential wildlife hazard to the GlenCo Jetport, the permittee shall immediately notify the U.S. Department of Transportation, Federal Aviation Administration (FAA). The permittee shall implement any corrective action deemed necessary by the FAA. 17. This office will consider the permittee's requests for extensions of time to the expiration date of the permit. Factors that this office may consider include, but are not limited to, the following: whether or not the applicant has met all time requirements, as stipulated in the above special permit conditions; whether or not the applicant has violated any permit conditions; whether or not the applicant has completed required compensator·y wetland mitigation; and whether or not unauthorized work in wetlands has occurred within the permit area. Provided that the perrnittee adequately documents that no serious problems have occurred with regard to the above factors, this office will grant five-year extensions to the expiration date of the permit, not to exceed a total of 15 years.

5

18. The perrnittee shall accomplish all work in accordance with the plans and drawings enclosed hereto which are incorporated in and made a part of this permit:

a. Master Plan for the Golden Isles Gateway Tract b. Mitigation Plan Map, Exhibit 7. 5, Augm?t 200

c. Proposed Site Plan, East Tract, Figure l to 2J d. Proposed Site Plan, West Tract, Figure 1 to 2L e. Proposed Site Plan, P.A.W.S. Corridor, Figure 1 & 2 FURTHER INFORMATION: 1. Congressional Authorities: You have been authorized to undertake the activity described above pursuant to Section 404 of the Clean Water Act (33 U.s . c. 1344). 2.

Limits of this Authorization.

a. This permit does not obviate the need to obtain other federal, state, or local authorizations required by law. I""·

b. This permit does not grant any property rights or exclusive privileges. c. This permit does not authorize any injury to the property or rights of others. d. This permit does not authorize interference with any existing or proposed federal projects. 3. Limits of Federal Liability. In issuing this permit, the Federal Government does not assume any liability for the following: a. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes. b: Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest.

c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit. d. Design or construction deficiencies associated with the permitted work. 6

e. Damage claims associated with any future modification, suspension, or revocation of this permit. 4. Reliance on Applicant's Data. The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided. 5. Reevaluation of Permit Decision. This office may reevaluate its decision on this permit at any time the circumstances warrant. Circumstances that could require reevaluation include, but are not limited to, the following: a. You fail to comply with the terms and conditions of this permit. b. The information provided by you in support of your permit application proves to have been false, incomplete, or inaccurate (see 4 above). c. Significant new information surfaces which this off ice did not consider in reaching the original public interest decision. Such a reevaluation may result in a determination that it is appropriate to use the suspension, modification, and revocation procedures contained in 33 CFR 325.7, or enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order which requires you to comply with the terms and conditions of your permit and for the initiation of legal action where appropriate. d. You will be required to pay for any corrective measures ordered by this office, and if you fail to comply with such directive, this office may in certain situations (such as those specified in 33 CFR 209.170) accomplish the corrective measures by contract or otherwise and bill you for the cost. 6. Extensions. General Condition 1 establishes a time limit for the completion of the activity authorized by this permit. Unless there are circumstances requiring either a prompt completion of the authorized activity or a reevaluation of the public interest decision, the U.S. Army Corps of Engineers will normally give favorable consideration to a request for an extension of time limit.

7

Your signature below, as permittee, indicates that you accept and agree to comply with the terms and conditions of this permit .

I \ · II - Z..c:roo

fPERMiEE)

(DATE)

~~~.

This permit becomes effective when the federal official, designated to act for the Secretary of the Army, has signed below.

When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this permit will continue to be binding on the new owner(s) of the property . To validate the transfer of this permit and the associated liabilities with compliance with its terms and conditions, have the transferee sign and date below.

d~,k~ (TRANSFEREE)

(DATE)

llf11-111t,rNI; 6ENG/2.141... ?Att.'1" .v'&~ N 11.. ()LI,_ tr J2. fUJ, Jr..,-f rt.r.SO ct H--r e S , L.. p

8

Attachment B

)

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS P.O. BOX 889 SAVANNAH, GEORGIA 31402~0889

JUL 1 1i 2003 REPLY TO ATIENTION OF:

Regulatory Branch 200007420 . SUBJECT: Permit Modification

Wildlife Realty Associates, LP Attention: Mr. Will Pitts 3 840 Crown Point Road, Suite B Jacksonville, Florida 32257 Dear Mr. Pitts: I refer to the request of April 16, 2003, provided on your behalf by Environmental Services, for modifications to Department of the Anny Permit 200007420, issued· November 14, 2000. The permit authorizes impacts to approximately 22.25 acres of wetlands to facilitate construction of a commercial development adjacent to Interstate Highway 95, Glynn County, Georgia. AUTHORIZED MODIFICATIONS: You are hereby authorized to modify your project in · accordance with the attached plans and drawings, as follows: . · · A. Impact 7.0 additional acres of wetlands at various locations within the tract located on the east side of Interstate Highway 95. The 7 .0 acres of additional wetla:n,d impact, combined with . the originally authorized 22.25 acres of wetland impact, resµlts in a cumulative project wetland impact of 29 .25 acres. The know and approved changes in wetland impacts are as follows, with additional ch~nges in wetland impacts yet to be determined: · · 1. Increase impact for first crossing on the main entrance road from 0.06 to 0.55 acre. 2. Increase impact for a commercial lot from 0.02 acre to 0.26 acre. 3. Decrease footprint of the original spine road impact from 3·. l acres to 2.59 acres, and impact an additio:nal 0.14 acres at a new location along the road . . 4. Decrease a proposed 0.28 acr~ impact to 0.18 acre. 5 . .Impact an additional 0.58_acre along the eastern side of the existing borrow pit. 6. Widen the 25' secondary road to the RV Park to 60' impacting an additional 0.75 acre.

-2-

B. Move the RV Park from the west side of Interstate 95 to the east side. · C. Eliminate the proposed train trestle through wetlands to the RV Park location. D. Construct a second vehicular crossing over the Brunswick-Altamaha Cana\ to be located 2,100 feet south of the main entrance.· · E. Enhance approximately 150 additional acres of on-site wetlands, which are located adjacent to and immediately south of the current on-site mitigation area. F. The completion date for the permit l.s extended from November 30, 2005 to June 30, 2006. .

.

The attached drawings and project description, which show the proposed modifications, supplement and/or partially supersede the original drawings and project description described in Special Condition t 8 of the P.ermit. The following special conditions app.ly to this project:

-

.

A. Within 6 mo:i;i.ths of the date of this permit modHication all property identified as requiring perpetual protection shall be protected by a restrictive covenant. A draft Declaration of · Covenants and Restrictions with exhibits shall be prepared by an attorney for the permit holder and forwarded to the USACE Savannah.District, Office of Counsel, for written approval. All restrictive' covenants should be drafted utilizing the latest version of the USACE Savannah District's inodel document entitled, "Declaration of Covenar:i.ts and Restrictions with Instructions." The model document is lo~ated on the Department of the Anny, Corps of Engineers, Savannah District web site at wWw.sas.usace.arrny.rnil/. Select the yellow box .titled,· "Pe~it Ihfo." Dnder the paragraph entitled, "Savannah District Regulatory Publications,"·scroll down to find the model draft Declaration of Covenants ~nd Restrictions with Instructions. Upon written approval by Office of Counsel, the restrictive covenant will be recorded in the land records Of:Q.ce of the. Clerk of the Superior Court in the county in which the land lies.· A copy of the recorde.d restrictive. coven~t, showing book and page numbers. of its recorded location, shall be provided to Office of Counsel. B. Prior ~o initiating any authorized impacts to· waters of the United States within the vicinity (i.e., viewshed)·ofthe Brunswick-Altamaha C,anal, th~ permittee shall insure implementation of and compliance with the stipulations contained in the document entitled "Memorandum of Agreement (MOA), Submitted to the Advisory Council on Historic Preservation, Between the U.S. Army Corps of Engineers, Savannah District and the Georgia State Historic Preservation Officer, DA Permit Application 200007420." C. As built drawings shall.be submitted to this office within 60 days of completion of the placement of all fill authorizeQ. by this permit. These drawings shall show all fill and mitigation areas.

-3-

This Permit Modification is subject to the terms and conditions of the original permit as .supplemented by the above conditions. You will not depart from the approved location or plans without obtaining prior approval from the Department of tlie Army. This authorization does not convey any property rights, ei~her ill. real estate or material, or any exclusive privileges. It does not authorize any injury to property, invasion of rights, or any infringement of federal, state, local laws, or regulations; riordoes it obviate the requirement to obtain State or local assent required by law for the activity des~ribed herein. It does not affect your liability for a~y ·damages that may be ca:tISed by the work. If this modification is agreeable, sign both the original and duplicate copy. Please retain the ·original for your records and return the signed duplicate to this office. We have enclosed a form, which explains your right to appeal this decision. ill accordance with Title 33, Code of Federal Regulations, Part 331, published in the March 28, 2000, Federal Regjster, Vo~. 65, No. 60, Pages 16486-16503,

for Roger A. Gerber. Colonel, US Army District Engineer Enclosures

----~----------------------------------~-~-----~--------------------------------------~----:---~--------~---------

· .Permittee hereby' accepts. the terms and conditions of this instrument.

Relocated ·RV Area

Legend:

- - - - Project Limits

D D

-Wetlands -Uplands

*Note : New Mitigation Area will begin 50' west of existing Shell Road.

Revised East Tract Key Map

~ENVIRONMENTAL ~ INC. SERVICES,

Georgia Heritage Theme Park Glynn County, Georgia

Pro"ect No. Date:

Scale: Figure 1

ES02016.01 October 2003 1"=1200'

.·

~ENVIRONMENTAL

Georgia Heritage Theme Park

Pro'ect No. Date: Scale:

ES02016.01 October 2003 1"==200'

&i1" I~ ENVIRONMENTAL ~'li'OUT("IO'~ Thlf"'

Georgia Heritage Theme Park Glynn County, Georgia

Pro' ect No. Date: Scale: r-: _____ .... _

ES02016.01 October 2003 1"=200' ""'

'.

"\?!?;! ~;;:

- ~

~ENVIRONMENTAL ~ C:::FRVTrl<'C:::

TNr

Georgia Heritage Theme Park Glynn County, Georgia

Pro"ect No. Date: Scale: c:,.. ........ "' .....

ES02016.01 October 2003

1"=200'

Prepared by and return to: Hunter, Maclean, Exley & Dunn, P.C. Post Office Box 9848 Savannah, Georgia 31412-0048 Please cross-reference to: Restrictive Covenant dated November 22, 2002 and recorded at Deed Book 1097, page 470, Glynn County Records

T

TERMINATION OF RESTRICTIVE COVENANT

AF

THIS TERMINATION OF RESTRICTIVE COVENANT, is made this ___ day of __________, 2018, by and between BRUNSWICK EXIT 42, LLC, a Georgia limited liability company ("EXIT 42"), and the UNITED STATES ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT ("USACE") (collectively, the "Parties"). RECITALS

D

R

WHEREAS, EXIT 42 is the owner of that 92.4 acre +/- portion of property located in Glynn County, Georgia consisting of wetlands, wetland buffers and/or streamside lands (the "Protected Property") by virtue of that certain Limited Warranty Deed dated August 29, 2014 and recorded at Deed Book 3341, Page 119 in the Office of the Clerk of Superior Court, Glynn County ("Glynn County Records"); and WHEREAS, the Protected Property is more particularly shown on that certain Plat prepared by Gary R. Nevill, Georgia Registered Land Surveyor No. 2491, entitled "Mitigation Map for PAWS, A Portion of the Golden Isles Gateway Tract," dated October 3, 2000, and recorded at Plat Book/Cabinet 28, Pages/ Drawer 153-155; and WHEREAS, Wildlife Realty Associates, L.P. ("Wildlife") is the former owner of the Protected Property pursuant to that certain Limited Warranty Deed dated December 14, 2001, and recorded at Deed Book 875, Page 235 in the Glynn County Records; and WHEREAS, during its period of ownership, Wildlife agreed to place restrictions on the Protected Property as mitigation for and in connection with (1) Permit No. 200007420 of January 15, 2002, issued by the USACE to the Fowler Center for Wildlife Education, as agent of Wildlife, authorizing the dredge and fill of wetlands and waters of the United States, and (2) Page 1 of 4 Matters\4825-6195-8776.v5-10/10/18

Permit No. 200010430 of November 12, 2002 issued by the USACE to Glynn County, authorizing the dredge and fill of wetlands and waters of the United States, which restrictions were set forth in that certain Restrictive Covenant dated November 22, 2002 and recorded at Deed Book 1097, Pages 470-480 in the Glynn County Records (the "Restrictive Covenant"); and WHEREAS, the dredge and fill authorized by Permit 200007420 never commenced; and WHEREAS, the dredge and fill authorized by Permit 200010430 impacted 1.71 acres +/of jurisdictional wetlands or waters of the United States; and WHEREAS, EXIT 42, as successor-in-tittle to Wildlife, desires to terminate the restrictions set forth in the Restrictive Covenant and withdraw the Protected Property from the Restrictive Covenant in order that EXIT 42 may obtain the full use and benefit attendant to its ownership thereof; and

T

WHEREAS, the Parties have agreed to terminate the Restrictive Covenant and release the Protected Property from the restrictions set forth therein.

AF

NOW, THEREFORE, the undersigned do hereby declare, agree and consent as follows: 1. EXIT 42 and USACE declare, agree and consent that the Restrictive Covenant is hereby terminated and the Protected Property identified on Exhibit "A" shall no longer be subject to the covenants, conditions and restrictions contained within said Restrictive Covenant.

R

2. On or before [DATE], EXIT 42 shall obtain 11.3 mitigation credits from one or more mitigation banks approved by the USACE for such transactions as mitigation for and in connection with the impacts associated with Permit No. 200010430.

D

3. The Clerk of Superior Court of Glynn County is hereby instructed and authorized to mark said Restrictive Covenant as cancelled on its face in the Glynn County Records. [SIGNATURE PAGES FOLLOW]

[REMAINDER OF PAGE LEFT BLANK]

Page 2 of 4 Matters\4825-6195-8776.v5-10/10/18

IN WITNESS WHEREOF, the undersigned has executed this Termination of Restrictive Covenant on the day and year first above written. BRUNSWICK EXIT 42, LLC, a Georgia limited liability company

By Its

T

Signed, sealed and delivered this ____ day of ____________, 2018 in the presence of:

AF

_____________________________ Unofficial Witness

R

_____________________________ Notary Public My Commission Expires: (AFFIX NOTARIAL SEAL)

D

[ADDITIONAL SIGNATURE PAGE FOLLOWS]

Page 3 of 4 Matters\4825-6195-8776.v5-10/10/18

IN WITNESS WHEREOF, the undersigned hereby consents to and approves the within and foregoing Termination of Restrictive Covenant on the day and year first above written. UNITED STATES ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT

By Its

T

Signed, sealed and delivered this ____ day of ____________, 2018 in the presence of:

AF

_____________________________ Unofficial Witness

R

_____________________________ Notary Public My Commission Expires:

D

(AFFIX NOTARIAL SEAL)

Page 4 of 4 Matters\4825-6195-8776.v5-10/10/18

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas