Project Name: 2007-01096 Warner Robbins Frangibility Zone County: Houston Nearest Named Waterbody: Horse Creek - Ocmulgee Overall Project Purpose: Military development of frangibility zone on airport runway

Project Name: 2007-01096 Warner Robbins Frangibility Zone County: Houston Nearest Named Waterbody: Horse Creek - Ocmulgee Overall Project Purpose: Military development of frangibility zone on airport runway

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 WEST OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3604

February 22, 2019 Regulatory Branch SAS-2007-01096

JOINT PUBLIC NOTICE Savannah District/State of Georgia

The Savannah District has received an application for a Department of the Army permit, pursuant to Section 404 of the Clean Water Act (33 U.S.C § 1344), as follows: Application Number: SAS-2007-01096 Applicant: Mr. Dick Campbell, Medvolt. 104 Park Drive, Warner Robbins, Georgia 31088 Agents:

Geotechnical & Environmental Consultants, Incorporated

Location of Proposed Work: Warner Robbins Air Force Base, Warner Robbins, Houston County, Georgia Description of Work Subject to the Jurisdiction of the U.S. Army Corps of Engineers: The proposed Mandatory Frangibility Zone (MFZ) is located on approximately 18.9 acres in Warner Robins, Houston County, Georgia. The project will involve clearing the Mandatory Frangibility Zone (MFZ), removal and reinstallation of the approach lighting systems and foundations, removal and replacement of the chain link fence (gate and posts to be made frangible), construction of a 10' wide gravel service drive, and improvement of the existing stormwater drainage features (to include concrete headwalls, storm junction boxes, and reinforced concrete pipes). The current land use is undeveloped land with a gravel access road, approach lighting structures, and a paved road running through a portion of the project area. The project proposes to fill 15.9 acres of wetland and pipe 625 linear feet of perennial stream in order to construct the frangibility zone. The applicant used the 2018 mitigation SOP to calculate 95.5 wetland credits and 5,063 stream credits as compensatory mitigation for the proposed impacts. BACKGROUND This Joint Public Notice announces a request for authorizations from both the Corps and the State of Georgia. The applicant's proposed work may also require local governmental approval.

STATE OF GEORGIA Water Quality Certification: The Georgia Department of Natural Resources, Environmental Protection Division, intends to certify this project at the end of 30 days in accordance with the provisions of Section 401 of the Clean Water Act, which is required for a Federal Permit to conduct activity in, on, or adjacent to the waters of the State of Georgia. Copies of the application and supporting documents relative to a specific application will be available for review and copying at the office of the Georgia Department of Natural Resources, Environmental Protection Division, Water Protection Branch, 2 Martin Luther King, Jr. Drive, Atlanta, Georgia 30334, during regular office hours. A copier machine is available for public use at a charge of 25 cents per page. Any person who desires to comment, object, or request a public hearing relative to State Water Quality Certification must do so within 30 days of the State's receipt of application in writing and state the reasons or basis of objections or request for a hearing. The application can be reviewed in the Savannah District, U.S. Army Corps of Engineers, Regulatory Branch, Albany Field Office, 1104 North Westover Boulevard, Suite 9, Albany, Georgia 31707; or the Piedmont Field Office, 1590 Adamson Parkway, Suite 200, Morrow, Georgia, 30260. State-owned Property and Resources: The applicant may also require assent from the State of Georgia, which may be in the form of a license, easement, lease, permit or other appropriate instrument. U.S. ARMY CORPS OF ENGINEERS The Savannah District must consider the purpose and the impacts of the applicant's proposed work, prior to a decision on issuance of a Department of the Army permit. Cultural Resources Assessment: A review of the National Register Information System (an online server associated with the National Register of Historic Places) determined that there are no historic properties located within a mile of the project area. The project area is previously disturbed. Endangered Species: An office review of the U.S. fish and Wildlife Service's Information, Planning, and Conservation System (IPaC) determined that there are four species listed. The Gopher Tortoise (Gopherus Polyphemus), Canby's Dropwort (Oxypolis canbyi), Harperella (Ptilimnium nodosum), and Relict Trillium (Trillium reliquum) are listed on the threatened, endangered or candidate species list. Pursuant to Section 7(c) of the Endangered Species Act of 1973, as amended (16 U.S.C. § 1531 et seq.), we request information from the U.S. Department of the Interior, Fish and Wildlife Service, the U.S. Department of Commerce, National Oceanic and Atmospheric Administration, National Marine Fisheries Service; or, any other interested party, on whether any species listed or proposed for listing may be present in the area and the potential effects this project may have on those species.

2

Public Interest Review: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and in general, the needs and welfare of the people. Consideration of Public Comments: The Corps is soliciting comments from the public; federal, state, and local agencies and officials; Native American Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Application of Section 404(b)(1) Guidelines: The proposed activity involves the discharge of dredged or fill material into the waters of the United States. The Savannah District's evaluation of the impact of the activity on the public interest will include application of the guidelines promulgated by the Administrator, Environmental Protection Agency, under the authority of Section 404(b) of the Clean Water Act. Public Hearing: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application for a Department of the Army permit. Requests for public hearings shall state, with particularity, the reasons for requesting a public hearing. The decision whether to hold a public hearing is at the discretion of the District Engineer, or his designated appointee, based on the need for additional substantial information necessary in evaluating the proposed project. Comment Period: Anyone wishing to comment on this application for a Department of the Army permit should submit comments in writing to the Commander, U.S. Army Corps of Engineers, Savannah District, Attention: Ms. Holly Ross, 1104 North Westover Boulevard, Suite 9, Albany, Georgia, 31707, or by email to: Holly.A.Ross@usace.army.mil, no later than 30 days from the date of this notice. Please refer to the applicant's name and the application number in your comments. 3

If you have any further questions concerning this matter, please contact Ms. Holly Ross, Project Manager, Albany Field Office at 648-422-2727 or via email at holly.a.ross@usace.army.mil. Enclosures: 1. Figures 1 ­ 5 Location Mapping 2. Findings of No Significant Impact (5 pages) 3. Aquatic Resource Impacts map

4

0 qPublic.netTM Houston County, GA Overview

Legend

0

Parcels

N

A Parcel ID 00120A 001000 Exempt OassCode Taxing District Robins Ai r Force Base Robins Ai r Force Base Acres 6690.1

(Note: Not to be used on ega documents)

Date created: 12/10/2018 Last Data Up oaded: 12/10/2018 6:03:58 AM

._. Schneider

Deve oped byL ~..JI'

GEOSPATllU..

Owne

US GOVT-ROBINS AFB

Physical Address Assessed Value Land Value Improvement

UNITED STATES OF AMERICA BYTHESECRETARYOFTHEAIRFORCE 2261 HUGHES AVE, STE 155 JBSA LACKLAND TX 78236 HWY247 Va ue $1046287000 Va ue $8.02812e+008 Va ue $1.81e+008

Value Accessory Value

Va ue $62475e+007

Last2Sales Date Price Reason Q ual 1/27/2016 23 u

1Y

~ ~IL

~

~

...

~

~ .....I.I..£

~

~

_ _ 14

~

:r. ~

-a.I.!-

o ... ~

rJ· ~ ~

I

~

~~

V\

:.z: 0

~

- i-~---· 9"--r--_ _,,,__

n . ...

£MAKER WAY ~

-!=!;

4M

~

~

~

~

~

~ ~

-:::

~

~ ~

~

~ ~

~ ~

~

~ --...a

l

N

600'

Figure 1 U.S.G.S. Topographic Map WRAFB Southern Frangibility Zone Warner Robins Air Force Base Warner Robins, Houston County, Georgia GEC Project No. 180596.240 Approximate Scale: As Shown

514 Hillcrest lndush>IBolAevard, Macon, GA 31204 · Phone: (478) 757-1606 · Fax: (478) 757-1608

Source: Warner Robins SE, GA Quadrangle (2017)

5031 t.ilgen Co...i, Columbus, GA 31907 · 1"1one:{706) 569--0000 · Fax: (706) 569-0940

GEC GEOTECHNICAL -

--- & ---

ENVIRONMENTAL C 0

NS U LT AN T S,

IN C

Horse Creek

Ri<:hard Ray Boulevard

Subject Property

l

Third St

:;on Blvd

1-------11

1,000'

Figure2 Location Map WRAFB Southern Frangibility Zone Warner Robins Air Force Base Warner Robins, Houston County, Georgia GEC Project #180596.240 Scale: As Shown Source: Google Maps

I

N

l

GEC GEOTECHNICAL - - - - & - - - E .N VIRONMENTAL C ONSUl..TA N TS.

INC

514 Hillcrest lndush>IBolAevard, Macon, GA 31204 · Phone: (478) 757-1 606 · Fax: (478) 757-1608 5031t.ilgen Co...i, Columbus, GA 31907 · 1"1one:{706) 569--0000 · Fax: (706) 569-0940

1--------11 200 ' Figure 3 Aerial Map WRAFB Southern Frangibility Zone Warner Robins Air Force Base Warner Robins, Houston County, Georgia GEC Project #180596.240 Scale: As Shown Source: Google Earth Website (2015)

GEC GEOTECHNICAL - - - - & - - - E .N VIRONMENTAL CO N SUl..T AN TS.

IN C

514 Hillcrest lndush>IBolAevard, Macon, GA 31204 · Phone: (478) 757-1 606 · Fax: (478) 757-1608 5031 t.ilgen Co...i, Columbus, GA 31907 · 1"1one:{706) 569--0000 · Fax: (706) 569-0940

Figure 4 Flood Insurance Rate Map (FIRM) WRAFB Southern Frangibility Zone Warner Robins Air Force Base Warner Robins, Houston County, Georgia GEC Project #180596.240 Scale: As Shown Source: FEMA Map Service Center Website

GEC GEOTECHNICAL - - - - & - - - E .N VIRONMENTAL CO N SUl..T AN TS.

IN C

514 Hillcrest lndush>IBolAevard, Macon, GA 31204 · Phone: (478) 757-1 606 · Fax: (478) 757-1608 5031 t.ilgen Co...i, Columbus, GA 31907 · 1"1one:{706) 569--0000 · Fax: (706) 569-0940

FINDING OF NO SIGNIFICANT IMPACT/ FINDING OF NO P RACTICABLE ALTERNATIVE SOUTHERN FRANGIBILITY ZONE AND GRADED CLEAR ZONE COMPLIANCE IMPROVEMENTS AT ROBINS AIR FORCE BASE, GEORGIA Pursuant to the Council on Environmental Quality regu lations for implementing the procedural provisions o f the National Environmenta l Policy Act (NEPA) (40 Code of Federal Regulations (CFR] 1500-1508) and the United States Air Force (USA F) Regu lation 32 CFR Part 989, the 781" Civil Engineer Group, Sustainment & Restoration Section has prepared an Environmental Assessment (EA) to identify and evaluate potential effects w ith making improvements in the Southern Frangibility Zone and Graded C lear Zone (GCZ) at the southern end o f Robins Air force Base (AFB) runway.

PURPOSE AND NEED (EA§ 2. 1, pages 3 to 4): The southern mandatory frangibility zone ( MFZ) ("southern frangibility zone") and the southern GCZ located at the south end o f the Robins AFB runway currently contain several sa fety hazards, which are in violation of Department of Defense airfield and heliport planning and design requirements found in Un ified Fac ilities Criteria 3-260-01. The southern MFZ consists mainly of seasonally flooded wetlands located within the I 00-year floodplain. This aquatic environment attracts w ildlife such as ducks, geese, hawks, and wad ing birds, all of which create a substantial risk to the safety o f emergency crews and equipment, pilots, aircrew, and aircraft from Bird/ Wildlife Aircraft Strike Hazards ( BASH). Additionally , the wet, nutrient-rich environment provide idea l conditions for rapidly growing trees such as willow and maple. The presence of these fast growing trees and other folia ge ensure related obstacles will constantly occur and require continued pesticide usage. Th is area is also hazardous to aircrews and aircraft in the event of a mishap, as emergency crews and their equipment are susceptible to injury/damage and delay in gaining access to downed aircrews and aircraft. In addition, the location of Beale Drive w ithin the southern GCZ violates requirements listed in Air Force Instruction (AF I) 32-7063 for pennissible land uses withi n a GCZ as well as Air Force Handbook (AFH) 32-7084. To address these violations, Robins AFB programmed a sustainment, restoration and modernization (S RM) action (SRM Project # UHHZl44033). Due to budget constraints, Robins has been issued airfield wa ivers by Air Force Materiel Command in order to remain in compl iance with these requirements. Beginning in 2006, Robins AFB began addressing airfield requirements in earnest and sought to reduce waivers as much as poss ible. A series o f projects were identified to bring the southern GCZ into compliance with UFC 3 260-01 and to address wildlife encroachment issues caused by adjacent wooded areas. As these GCZ projects moved forward, an oversight o f the MFZ requirements was identified in 201 4. Using wa ivers was considered but due to the presence of concrete weir, the extent o f the embankment at Richard Ray Boulevard in that area and the wildlife habitat that continually created wildlife encroachment issues, it was decided that these non-compliant items were not acceptable and they needed to be mitigated. Then, funding became available in Fi scal Y car 20 17 to address identified hazards in the MFZ. The purpose of the Proposed Action is to eliminate flight and emergency operation hazards in the southern MFZ and GCZ and to eliminate hazards and delays to emergency crews responding to incidents within the southern MFZ and GCZ. The need for the Proposed Action is to protect the safety of emergency crews/equipment, pi lots/aircrew, and aircraft, and to eliminate recurring sources of sa fety hazards and related obstacles.

DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVES PROPOSED ACTION (EA§ 2.3.2, pages 11 to 13): Under the Proposed Action, tlight operation haz.ards in the southern MFZ and GCZ would be eliminated. This would be accomplished by realigning part of Beale Drive, removing non-frangible obstacles in the southern MFZ, and filling in wetlands within the southern MFZ to eliminate BAS! I attractors and improve emergency response capabilities in the event of a mishap. Implementation of the Proposed Action would result in filling and grading approximately 15 acres ofjurisdictional wetlands within the southern MFZ and GCZ. To compensate for unavoidable loss of these wetlands, Robins AFB will purchase wetland mitigation credits from an established wetlands mitigation bank . The wetlands will be filled and graded to

Finding ofNo Significant Impact I Finding ofNo Practicable Alternative Sowhern Frangibility Zone and Graded Clear Zone Compliance Improvements Robins AFB

minimize BASH attractors, minimize safety issues in the event of a mishap, remove non-frangible obstacles, and eliminate vegetation that can quickly grow to exceed height requirements. This el iminates safety hazards associated with constantly recun-ing obstacles in wetland/noodplain areas. A detailed topographic survey was pcrfom1ed for portion of Beale Drive located within the southern GCZ, and a new roadway alignment was designed. The new alignment removes this roadway from the southern GCZ and ties it back into the existing roadway, aligning at two end points (EA Figure I, page 6). The southern GCZ will meet the requirements of AF I 32-7063 and AFl-I 32-7084 upon rea lignment of Beale Drive. NO-ACTION ALTERNATIVE CEA§ 2.4, page 14): Under the No-Action Alternative, wetlands would remain and attendant flight operation hazards in the southern MFZ and GCZ would continue. Beale Drive would not be rea ligned to eliminate prohibited roads within the GCZ; prohibited, non-frangible structures in the southern MFZ would not be eliminated; and BASH attractors would not be eliminated to improve emergency response capabilities in the event of a mishap. Increased safety protection for emergency crews/equipment, pilots/aircrew, and aircraft would not occur. The presence of fast-growing trees and other fo liage in wetland areas would continue and require appl ication of pesticides. Robins AFB would continue to apply for airfield waivers in order to remain compliant with UFC 3-260-01 standards for airfield obstructions and frangibility. ALTERNATTVES CONSIDERED BUT ELIMINATED FROM DETAILED STUDY (EA§ 2.5, pages 14 to 16): Two alternatives for completing the Proposed Action were considered but not carried forward for fu1ther analysis because they failed to meet the selected project criteria as presented in § 2.2 of the EA. The first alternative considered removing the steel and concrete weir and continuing to remove, top, and/or grind trees and their stumps within the southern MFZ. Natural and man-made airfield obstructions not meeting the fran gibi lity requ irements wou ld be eliminated and woody debris would be removed periodically. Beale Drive would be realigned to remove the roadway from the GCZ. This alternative was removed from further consideration because it wou ld not minimize the potential for increased safety risk in the event of a mishap and it wou ld not address BASH. The second alternative considered use of a wetland-approved herbicide to control tree growth in these areas. The steel and concrete weir wou ld be removed and Bea le Drive wou ld be realigned to remove the roadway from the southern GCZ. This alternative was removed from further consideration because it would not minimize the potential for increased risk in the event of a mishap and would not address BASH. Furthcnnore, it would vio late the USAF Model Pesticide Reduction Plan guidelines. In both alternatives, the recurrence of wetland disturbance to maintain safety requ irements resulted in a MFZ wetland continuously subject to regenerating obstacles such as fast-growing trees and other foliage.

ENVIRONMENTAL EFFECTS

Implementation of the Proposed Action would have no effect on drinking water/wastewater supplies, hazardous materials/waste, toxic materials, cultural resources, socioeconomics, and transportation/safety. There arc no drinking water wells located within the vicinity of the Proposed Action. While no industrial wastewater is generated within the boundaries of the southern MFZ and GCZ, industrial and sanitary wastewater is pumped through a force main that crosses the southern CZ and discharges to the Ocmulgee River. No solid waste is currently generated here due to land use restrictions placed on the MFZ and GCZ. Hazardous materials/waste are neither stored nor generated within the Proposed Action area. Aircraft de-icing is occasionally required in the vicinity of the runway and taxiway, but this occurs within a window of roughly two weeks per year. Implementation of the Proposed Action wou ld not generate new sources of industrial waste streams. o asbestos and/or lead based paint material is located within the Proposed Action area. The two closest restoration sites to the Proposed Action area are a landfill located to the southwest of the southern MFZ and So lid Waste Management Unit 57 located near the Beale Drive proposed road realignment area. Both sites are undergoing cleanup activities and long term groundwater monitoring in accordance with the records of decision approved by the United States Environmental Protection (USEPA) corrective action plans as well as by Georgia Department of Natura l Resources, Environmental Protection Division (GA DNR EPD). Groundwater wells in the Proposed Action area would be protected during construction activities. These wells may need to be extended to remain Page 2of5

Finding ofNo S ignificant Impact I Finding ofNo Practicable Alternative Sowhern Frangibility Zone and Graded Clear Zone Compliance lmprove111e111s Robins AFB

accessib le and useable depending if ground elevation changes. If this were to occur, Robins AFB wi ll coordi nate w ith the Air rorce Civi l Engineer Center. This coordination will also be required if the wel ls along Beale Drive road realignment have to be abandoned. Two National Register of Historic Places (NRHP)-eligible properties, Building 12 and the Strategic Air Command (SAC) Alert Apron, are located in the vicinity of the new route for Beale Drive. Building 12, a historic Cold War Era structure determined to be eligible for listing on the NRHP, is located on the southern end of the airfield just east of the runway. Surveys identified no archaeological/cultural resources materia l and ind icated there is little potential for undiscovered archaeologica l deposits w ith in either the Proposed Action area or along the proposed new route for Beale Drive (Appendix B). No known areas of religious or sacred significance to the thirteen federally recognized tribes have been identified on Robins AFB (Appendix C). No residential or commercial property is located in the vicinity of the Proposed Action area due to navigational and safety requirements; therefore, there would be no impacts to Environmental Justice. Based on the scope of the Proposed Action, environmental analyses within the EA determined there would be temporary, shorl-terrn im pacts to the physica l env ironment (surface waters, floodplains/wetlands, storm water, soils and groundwater), air qua lity, noise, and biologica l resources. Overal l, environmental analyses did not identify any significant impacts to any of the above resources. In addition, no significant cumu lative impacts caused by implementation of the Proposed Action when combined with other past, present, and reasonably foreseeable actions occun·ing at Robins AFB were identified (EA§ 4.9, pages 63 to 70).

PHYSICAL ENVIRONMENT (EA§§ 3.1 and 4.1 ; pages 19 - 25 and 41 - 51): Temporary impacts are anticipated on surface waters, storm water, floodplain/wetland areas, soils, and groundwater during construction activities of the Proposed Action, which would cease upon completion of the project. During construction, the selected contractor will implement best management practices (BMPs) to control soil erosion as required by the GADNR EPD, Water Quality Control General Permit for Storm Water Discharges Associated with Construction Activity for Stand Alone Construction Projects. Disturbed areas will be stabil ized and reseeded to further minimize erosion and sed iment transport. Majority of the Proposed Action fa lls w ithin the I 00-year floodplain of the Ocmulgee River. Approx imately fi~een acres of seasona lly and sem i-permanently ju risdictional wetlands ex ists within the proposed site. Although some adverse effects on floodpla in and wetland areas will occur as a result of this action , these impacts will be offset by compensatory mitigation through the purchase of credits in a qualifying mitigation wetlands bank. Robins AFB selected contractor will be required to submit an Individual Permit application to the U.S. Army Corp of Engineers, Savannah District Office, which will include a Jurisdictional Determination Request, project plans including sediment and erosion control to minimize impacts to wetlands, and a description of the alternatives eval uated in this document. As part of this permitting process, the contractor will also secure a 40 I Water Quality Certification from GADNR EPD. Because two of the identified projects involve filling wetlands areas, the combined impacts would contribute slightly to a cumulative efTect on wetland and floodplain resources. Existing storm water infrastructure will remain in place or will be replaced with improved strnctures. These controls will continue through the life of the project. The remaining floodplain contains sufficient storage capacity to handle displaced flood waters; therefore, cumulative effects from the loss of flood water storage capacity in the Ocm ulgee River floodplain are considered to be insignificant. With these mitigations in place, there wou ld be no signi ficant impact to the physica l environment from the Proposed Action. A TR QUALITY {EA§§ 3.2 and 4.2. pages 26 to 27 and 52 to 53): Air quality in Houston County, which includes Robins AFB, is currently classified as in attainment for all criteria air pollutants under the Clean Air Act (CAA). Conformity ana lysis is not required. Machinery used to fill and grade the project area and relocate Beale Drive would temporari ly increase emissions of carbon monox ide (CO), hydrocarbons, nitrogen oxides (NOx) and fugitive dust em issions, which were determined to be below de minimus levels under the CAA . The Proposed Action would not result in an increase in stationary or mobile air emissions fol lowing completion of construction activities. An Air Conformity Applicability Model (ACAM) analysis determined the Proposed Action would result in 685 tons/year of greenhouse gas emission , which is less than the significant emission rate of 75,000 tons/year guidance provided by USEPA. The ACJ\M file is found in Append ix E of the EA and is incorporated

Page 3of5

Finding ofNo Significant Impact I Finding of No Practicable Alternative Sowhern Fra11gibility Zone and Graded Clear Zo11e Compliance Improvements Robins AFB

by reference. Based on th is ana lysis, there would be no significant impacts to air quality from the Proposed Action. NOISE ENVIRONMENT {EA§§ 3.4 and 4.4, pages 31to32 a nd page 56): Filling and grad ing in the project area would result in a temporary increase in vehicle/construction equ ipment noise in the immediate vicinity of the project area. These noise impacts are compatible with the airfield and adjacent areas. The relocation of Bea le Drive would bring traffic closer to an existing building that is utilized on a part-time basis for official business. Both temporary and permanent noise increases would be insignificant in comparison to the ex isting noise environment, which is dominated by fli ght line activities. During construction, aircraft operations wi ll be temporary redirected to the north end of the runway until project completion. This may result in a temporary increase in noise in the area immediately north of the runway; however, there arc no sensiti ve receptors located there. Overall, there wou ld be no significant impacts from noise with implementation of the Proposed Action. BIOLOGICAL ENVIRONMENT {EA§§ 3.5 and 4.5, pages 32 to 35 and page 56): Biological resources within the project area would be temporarily impacted by noise and traffic resulting from construction operations. These impacts would be minimal since wildlife in the immediate area of the airfield are accustomed to such an environment. With the exception of the American alligator, which is protected under the Endangered Species Act as threatened due to similarity of appearance with several species of crocod iles and caimans, there are no other threatened, endangered or sensitive plant or animal species or their habitats located within the Proposed Action area. State-protected plant spec ies of concern do occur on Robins AFB, but no populations have been identified within the project area. Populations of the Atlantic sturgeon are believed to spawn within the Ocmulgee River, approximately 60 river kilometers downstream of the Proposed Action. As such, Robins AFB conducted in formal consultations with USFWS, the ational Marine Fisheries Service (NMFS), and GADNR Wildlife Resources Division in the spring of 2016 (Append ix C). All agencies concurred with Robins AFB ·s ''No Effect" determination on threatened and endangered species with implementati on of the Proposed Action. Concerning any loss of feeding and nesting habitat to the American alligator due to Iii ling in the wetland areas, USFWS and NMFS agreed purchasing credits in a regulatory-approved wetlands mitigation bank would address any habitat lose to this species. There would be no significant impacts to biologica l resources from the Proposed Action with incorporation of wetland/floodp lain mitigations into the action. WETLAND/FLOODPLA IN MITIGATIONS As the proponent for this action, the 781" Civil Engineer Group, Sustai nment & Restoration Section is responsible for ensuring the wetland/floodplain mitigations identified above and throughout the EA are fully funded , in place, and being carried out, as identified in this document and within the Mitigation and Monitoring Plan (MMP). The MMP wi ll be deve loped subsequent to this document and will include regulatory permitting requirements as they become avai lable and the anticipated mitigation schedule along with completion date(s). The MM P is a living document and as such will be updated by Robins AFB throughout the life of the proj ect. It is expected mitigation monitoring wi ll generally consist of on-the-ground inspections and any subsequent actions necessary to address deficiencies discovered during the inspections. The EA refers to the use of BMPs. For this document and in compliance with USAF regulations, BM Ps as identified within the EA will be carried forwa rd and monitored in the MMP. PUBLIC NOTICE/CONSULTATION/SIMILAR CONTACTS The draft EA and draft FON SI/FON PA were made available to the public for a 30-day review period on June 17, 2015 in the Houston Home Joumal. In addition copies of the draft documents were o made available to federally recognized tribes. No comments were received. Copies of all federal/state agencies, tribal consultations, and public review are found within Appendix C of the EA.

Page 4of5

Finding ofNo Significant Impact I Finding ofNo Practicable Alternative Sowhern Frangibility Zone and Graded Clear Zone Compliance Improvements Robins AFB

FINDING OF NO SIGNIFICANT IMPACT Based on rny review of the facts and analysis summarized above and conta ined with in the attached EA, I find the proposed decision to make improvements in the Southern Frangibility Zone and GCZ at the southern end of the Robins A FB run way will not have a significant impact on the natural or human environment; therefore, an environmental impact statement is not required. This analysis fulfills the requirements of the N ational Env ironmental Policy Act, the President's Council on Environmental Quality 40 C S .R. §§ 1500 - 1508 and the USA F EIA P regulation 32 C.F.R § 989.

FINDING OF NO PRACTICABLE ALTERNATIVE Pursuant to the requirements of Executive Orders 11988, Floodplain Management, as amended by Executive Order 13 690 on January 30, 20 15 and 11990, Protection of Wetlands, and considering all supporting informat ion, I find there is no practicable alternative to conducting these construction activities within the floodplain and j uri sdictional wetland areas as described in the attached EA and that the Proposed Action includes all practicable measures to minimize harm to the env ironment. T his finding both fulfills requirements of the referenced Executi ve Orders and EIAP regulation, 32 CFR § 989. 14 for a Finding of No Practicable Alternative.

?:;>D RONA LD J. ON D ERKO, P.E. Command Senior Civil Engineer Logist ics, Civil Engineering and force Protection

Page 5of 5

Date

MAY

1a\ ?/

100'

400'

200'

LEGEND:

0

= Approximate Project Area (~18 .9 acres) t·:·:·:·:·:·:·:I = Impacted Wetland Area (~1 5 .9 acres) =Perennial Stream (-625 LF) -

SCALE: 1" = 200'

600'

800'

-

Impact Map WRAFB Southern Frangibility Zone Warner Robins Air Force Base Warner Robins, Houston County, Georgia GEC Project No. 180596.240

GEC GEOTECHNICAL - - - - & - - - ENVIRONMENTAL C 0

N S U LT A NT S.

l NC

514 Hil:reS Industrial Bouevard, Mooin. GA 31204 · Rlone: (47a 757.1 003 · Fax: (471757-1003 5031 Mlgen Court, Colurrbu& Gf\31907 · Phcne (700) $9.(!00 · Fa< (7C6) $9.(B40

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas