Home

Savannah District

Run scraper

Notice of Availability of a Draft Integrated Post Authorization Analysis Report (PAAR) and Supplemental Environmental Assessment (SEA)

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Notice of Availability of a Draft Integrated Post Authorization Analysis Report (PAAR) and Supplemental Environmental Assessment (SEA), Fish Passage at New Savannah Bluff Lock and Dam (NSBLD), and Draft Finding of No Significant Impact (FONSI) to evaluate proposed changes to the Fish Passage feature of the Savannah Harbor Expansion Project (SHEP). This SEA supplements the July 2012 Final Environmental Impact Statement (FEIS)

Notice of Availability of a Draft Integrated Post Authorization Analysis Report (PAAR) and Supplemental Environmental Assessment (SEA), Fish Passage at New Savannah Bluff Lock and Dam (NSBLD), and Draft Finding of No Significant Impact (FONSI) to evaluate proposed changes to the Fish Passage feature of the Savannah Harbor Expansion Project (SHEP). This SEA supplements the July 2012 Final Environmental Impact Statement (FEIS)

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas