PROJECT NAME: SAS-2019-00162. COUNTY: Hall. NEAREST NAMED WATERBODY: Suwanee Creek. OVERALL PROJECT PURPOSE: Construction of a distribution center composed of four (4) buildings totaling 658

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

PROJECT NAME: SAS-2019-00162.

COUNTY: Hall.

NEAREST NAMED WATERBODY: Suwanee Creek.

OVERALL PROJECT PURPOSE: Construction of a distribution center composed of four (4) buildings totaling 658,900 square feet of warehouse and manufacturing space.

PROJECT NAME: SAS-2019-00162.

COUNTY: Hall.

NEAREST NAMED WATERBODY: Suwanee Creek.

OVERALL PROJECT PURPOSE: Construction of a distribution center composed of four (4) buildings totaling 658,900 square feet of warehouse and manufacturing space.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas