Home

Savannah District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

PROJECT NAME: Plant McDonough

COUNTY: Cobb

NEAREST NAMED WATERWAY: Chattahoochee River

OVERALL PROJECT PURPOSE: To periodically maintenance dredge accumulated sediments from cooling water intakes within the Chattahoochee River on a as-needed basis.

PROJECT NAME: Plant McDonough COUNTY: Cobb NEAREST NAMED WATERWAY: Chattahoochee River OVERALL PROJECT PURPOSE: To periodically maintenance dredge accumulated sediments from cooling water intakeswithin the Chattahoochee River on a as-needed basis.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas