Home

Savannah District

Run scraper

PROJECT NAME: Savannah Steel Terminal Docking Facility. COUNTY: Chatham. NEAREST WATERWAY: Savannah River. OVERALL PROJECT PURPOSE: To annually dredge approximately 12

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

PROJECT NAME: Savannah Steel Terminal Docking Facility.

COUNTY: Chatham.

NEAREST WATERWAY: Savannah River.

OVERALL PROJECT PURPOSE: To annually dredge approximately 12,500 cubic yards of accumulated sediment from navigable waters ofthe United States (i.e. the Savannah River) for maintenance ofan existing berth.

PROJECT NAME: Savannah Steel Terminal Docking Facility. COUNTY: Chatham. NEAREST WATERWAY: Savannah River. OVERALL PROJECT PURPOSE: To annually dredge approximately 12,500 cubic yards of accumulated sediment from navigable waters ofthe United States (i.e. the Savannah River) for maintenance ofan existing berth.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas