Home

Savannah District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

PROJECT NAME: I-285 at SR 400 Reconstruction Project

COUNTY: Fulton and DeKalb

NEAREST NAMED WATER: Heard Creek

OVERALL PROJECT PURPOSE: To reconstruct the I-285/SR400 interchange to include barrier separated Collector Distributor lanes which would include new flyover bridges.

PROJECT NAME: I-285 at SR 400 Reconstruction Project COUNTY: Fulton and DeKalb NEAREST NAMED WATER: Heard Creek OVERALL PROJECT PURPOSE: To reconstruct the I-285/SR400 interchange to include barrier separated Collector Distributor lanes which would include new flyover bridges.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas