PROJECT NAME: Lakeside Dam Rehabilitation. COUNTY: Bibb. NEAREST WATERBODY: Lakeside Reservoir (Impoundment of Boggy Branch). OVERALL PROJECT PURPOSE: To rehabilitate the existing dam servicing Lakeside Reservoir

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

PROJECT NAME: Lakeside Dam Rehabilitation.

COUNTY: Bibb.

NEAREST WATERBODY: Lakeside Reservoir (Impoundment of Boggy Branch).

OVERALL PROJECT PURPOSE: To rehabilitate the existing dam servicing Lakeside Reservoir, and to safeguard continued use of the dam structure by Norfolk Southern Railroad.

PROJECT NAME: Lakeside Dam Rehabilitation. COUNTY: Bibb. NEAREST WATERBODY: Lakeside Reservoir (Impoundment of Boggy Branch). OVERALL PROJECT PURPOSE:To rehabilitatethe existing dam servicing Lakeside Reservoir, and to safeguard continued use of the dam structure by Norfolk Southern Railroad.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas